30.07.2015 Views

Download PDF (28.7MB) - NDSU - North Dakota State University

Download PDF (28.7MB) - NDSU - North Dakota State University

Download PDF (28.7MB) - NDSU - North Dakota State University

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

site inventory & analysisThis site has the opportunity to support highly invested, city infrastructure that binds the site connecting continuous areas ofresidential properties. This site is the central point between two continuous bike and pedestrian trail networks.downtownover25thStreet1.5 miles.25 miles21Interstate 94 overpass32Interstate 94 underpassContrastpast 52nd ave (..Miles)tie into existing networkfuture rivercrossing discussion3Bicycle/Pedestrian greenway35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!