30.07.2015 Views

Architectural Application - cory lake isles

Architectural Application - cory lake isles

Architectural Application - cory lake isles

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CORY LAKE ISLESPROPERTY OWNERS ASSOCIATION, INC.C/O FirstService Residential2870 Scherer Drive N., Suite 100St. Petersburg, FL 33716Phone 727-299-9555 Fax 813-436-5309Jim Staub – James.Staub@fsresidential.comALTERATION APPLICATIONOWNER’S NAME: _____________________________________ADDRESS: ___________________________________________DATE: __________________PHONE: _________________EMAIL ADDRESS: _____________________________________________________________________DETAILED DESCRIPTION OF PROJECT: (landscaping, plant/tree selections, dimensions, color swatches, style, material sample,drawings, etc.) If more space is required, please attach to this form):____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________(The Cory Lake Isles Deed Restrictions and Design Review Manual are available by contactingJames.Staub@fsresidential.com)James Staub atA COPY OF YOUR OFFICIAL LOT SURVEY MUST BE INCLUDED WITH THIS APPLICATION (Please indicate on lot survey wherealterations will be located on property.)The undersigned property owner hereby acknowledges and agrees that the undersigned shall be solely responsible for determiningwhether the improvements, alterations or additions described herein comply with all applicable laws, rules and regulations, codeand ordinances: including without limitation, zoning ordinances, subdivision regulations and building codes. A building permit fromthe appropriate building department is needed on most property alterations and/or improvements. The design Review Committee(DRC) shall have no liability or obligation to determine whether such improvements, alterations and additions comply with anyapplicable laws, rules, regulations, codes or ordinances.As a condition precedent to granting approval of any request for a change, alteration or addition to an existing basic structure, theapplicant, their heirs and assigns thereto, hereby assume sole responsibility for the repair, maintenance or replacement of any suchchange, alteration or addition. IT IS UNDERSTOOD AND AGREED THAT CORY LAKE ISLES PROPERTY OWNERS ASSOCIATION, INC. ANDFIRSTSERVICE RESIDENTIAL ARE NOT REQUIRED TO TAKE ANY ACTION TO REPAIR, REPLACE OR MAINTAIN ANY SUCH APPROVEDCHANGE, ALTERATION OR ADDITION, OR ANY STRUCTURE OR ANY OTHE RPROPERTY. THE HOMEOWNER AND ITS ASSIGNSASSUMES ALL RESPONSIBILITY AND COST FOR ANY ADDTION OR CHANGE AND ITS FUTURE UPKEEP AND MAINTENANCE.SIGNATURE OF OWNER: _____________________________________ DATE: _____________________________PLEASE ALLOW UP TO 15 DAYS AFTER COMPLETE APPLICATION IS RECEIVEDTO RECEIVE A REPLY FROM THE DRCDESIGN REVIEW COMMITTEE ACTION: APPROVED _____________ NOT APPROVED _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________AUTHORIZED SIGNATURE FOR THE DRC_____________________________DATE


CORY LAKE ISLES PROPERTY OWNERS ASSOCIATION, INC.ARCHITECTURAL REVIEW BOARD (ARB)2014 CALENDAR OF MEETINGSLocation:Time:Cory Lake Isles - Beach Club10441 Cory Lake DriveTampa, Florida 3364710:00 a.m.Dates:January 7, 2014January 21, 2014February 4, 2014February 18, 2014March 4, 2014March 18, 2014April 1, 2014April 15, 2014April 29, 2014May 13, 2014May 27, 2014June 10, 2014June 24, 2014July 8, 2014July 22, 2014August 5, 2014August 19, 2014September 2, 2014September 16, 2014September 30, 2014October 14, 2014October 28, 2014November 11, 2014November 25, 2014December 9, 2014December 23, 2014Meetings will be held every other Tuesday at 10 a.m. at the Beach Club starting on January 7, 2014.Board Packets will be disbursed to the Committee Member on the Monday prior to the meeting.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!