06.08.2015 Views

Black Book Aug 15.pdf

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Case Study - Yianis Park Inn Palace, SouthendKey InformationClient:Value:Location:Architect:Project Manager:Services Consultant:Structural Consultant:Season Solutions/ Yianis£2.5mPark Inn Palace Hotel SouthendMalbyCMC ConsultingBanyardsFairhurstProject OverviewThe conversion of thirty thousand square feet of a Victorian building over two floors to form spacefor a casino fit out.Works included major structural alterations, forming large internal spaces. Services diversions,acoustic linings, screeds, new lifts and external works. This project involved the various professionalsworking together in situ on the design of a complicated and largely unknown building structure.ChallengesIt was agreed that we would commence on site without full design sign off on the basis wewould work jointly with the client’s project team to achieve an early completion with design andcost agreed throughout the project.This resulted in a daily assessment of the challenges and solutions identified as we progressedand sixty tonnes of structured steel along with thirty tonnes of temporary propping beingconstructed on the lower two floors of a seven story occupied hotel.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!