Overvoltage Protection and Insulation Coordination in Power Systems
Overvoltage Protection and Insulation Coordination in Power Systems
Overvoltage Protection and Insulation Coordination in Power Systems
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Procedure for <strong>Insulation</strong> <strong>Coord<strong>in</strong>ation</strong> - General<br />
Basic difference between ranges I <strong>and</strong> II<br />
withst<strong>and</strong> voltage<br />
Fachgebiet<br />
Hochspannungstechnik<br />
Range II<br />
Range I<br />
[FGH-78]<br />
peak<br />
time duration of stress<br />
gap spac<strong>in</strong>g 3 m<br />
gap spac<strong>in</strong>g 0.5 m<br />
<strong>Overvoltage</strong> <strong>Protection</strong> <strong>and</strong> <strong>Insulation</strong> <strong>Coord<strong>in</strong>ation</strong> / Chapter 1 - 30 -<br />
M<strong>in</strong>imum of withst<strong>and</strong><br />
voltage for switch<strong>in</strong>g<br />
overvoltage<br />
Withst<strong>and</strong> voltage<br />
cont<strong>in</strong>uously<br />
decreas<strong>in</strong>g with time<br />
duration of stress