09.08.2015 Views

Workplan Presentation to ATSRAC

July 2003 - Center for Advanced Aviation System Development

July 2003 - Center for Advanced Aviation System Development

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Electrical Wiring Interconnection Systems (EWIS)Research and Development (R&D)Technology Transfer HWG<strong>Workplan</strong> <strong>Presentation</strong> <strong>to</strong> <strong>ATSRAC</strong>10 July 2003Kent V. Hollinger – US Co-chair


INSPECTION &MAINTENANCETECHNOLOGIESHAZARD PREVENTIONAGINGELECTRICAL SYSTEMSRISK MANAGEMENTAGING &DEGRADATION KNOWLEDGERESEARCH & ANALYSISPROTECTIVE DEVICESHAZARD MITIGATION


HAZARDPREVENTION


HAZARD PREVENTIONInspection & Maintenance Technologies• Excited Dielectric Test 1• Broadband Impedance• Pseudo-Random Binary Reflec<strong>to</strong>metry• Micro-Energy High-Voltage• Pulse Arrested Spark DischargeNote:1. Navy follow-on work in process. Development of au<strong>to</strong>mated signal analysis.


HAZARD PREVENTIONInspection & Maintenance Technologies• Terahertz Reflec<strong>to</strong>metry• Fiber Optic Chafe Detection 1• Honeywell Nova Test System• Wire Indenter 2Notes:1. Navy follow-on work in progress. Full scale engineering development.2. FAA follow-on anticipated. Additional wire types and development of correlationdata.


HAZARDMITIGATION


HAZARD MITIGATIONProtective Devices• Aging Circuit Breaker Assessment• Maintenance recommendations• Installation recommendations• Advisory material• Modification of SAE specifications• DOT/FAA/AR-01/118• http://actlibrary.tc.faa.gov


HAZARD MITIGATIONProtective Devices• Arc Fault Circuit Breaker – Single Phase• Strategies for implementation• Retrofit/forward fit• Advisory materials• Maintenance/troubleshooting strategies• Training


HAZARD MITIGATIONProtective Devices• AFCB continued: Three phase and 28VDC• Strategies for implementation• Retrofit/forward fit• Advisory materials• Maintenance/troubleshooting strategies• Training


RESEARCH & ANALYSIS


RESEARCH & ANALYSISAging & Degradation Knowledge• Wire Degradation Research• Assessment of Wire Performance Requirements• EWIS Maintenance Effects• Mixed Wire Types• Assessment of Requirements for EWISSeparation and Segregation


RESEARCH & ANALYSISAging & Degradation Knowledge• Development of Advanced Risk AssessmentTechniques for EWIS• Characterization and Modeling of Physical andElectrical Properties of Polyimide and PVCMaterials


HWG#12 Initial Focus• Aging Circuit Breaker Recommendations• Arc Fault Circuit Breaker Implementation


DATE: 10 July 2003WORKING GROUP / TASK #: 12CO-CHAIRS: Kent HollingerVacantMEMBERS:NAME ORGANIZATION NAME ORGANIZATIONRob PappasFred SobeckGalen DeedsKen EliasGiday GirmayDarrel SantalaFAAFAAAirborne ExpressALPABoeingBoeingPetar GlamoclijaKailash KapurNicholas KirincichJean CartierNOTE: Need JAA and otherEuropean members.BombardierHoneywellRaytheonTransport CanadaDATELOCATIONPAST MEETINGS:FUTURE MEETINGS:2 July 2003September 16-18, 2003December 2-4, 2003March 2004June 2004September 2004December 2004FAA Headquarters @ Washing<strong>to</strong>n DCFAA NDT Lab @ Albuquerque, NMHoneywell @ Phoenix, AZRaytheon @ Indianapolis, INBombardier @ Montreal, QCBoeing @ Seattle, WAFAA Tech Center @ Atlantic City, NJOVERVIEW: Identify, review, screen, transfer and implement technologies and knowledge that enhance the safety andcontinued airworthiness of aircraft EWIS. The scope of this HWG includes procedures, equipment and systems <strong>to</strong>design, moni<strong>to</strong>r, inspect, test and maintain EWIS.


SUB-TASK#12.1Develop effectivestrategies <strong>to</strong>transfer andimplementproducts(includingknowledge)resulting frommature R&Defforts.DESCRIPTIONA. Aging Circuit Breaker Report1. Review report DOT/FAA/AR-01/118 and itsrecommendations.2. Develop strategy for each appropriaterecommendation.B. Single Phase Arc Fault Circuit Breaker1. Develop strategy for forward fit.ESTIMATEDCOMPLETION DATEOc<strong>to</strong>ber 2003January 2004January 2004STATUS(RED/GREEN/YELLOW)GREENGREENGREEN2. Develop strategy for retrofit.July 2004GREEN3. Identify operational and maintenanceconsiderations.July 2004GREEN4. Specify advisory materials requiringrevision.July 2004GREEN5. Specify necessary operational andmaintenance training areas.July 2004GREEN


SUB-TASK# DESCRIPTION ESTIMATEDCOMPLETION DATESTATUS(RED/GREEN/YELLOW)12.2Review andscreen on-goingR&D efforts anddevise strategies<strong>to</strong> further developthese productsin<strong>to</strong> commerciallyviable solutions,as appropriate.A. Material Characterization Report1. Review report.2. Make recommendation for dissemination ofinformation, if appropriate.B. Excited Dielectric Test1. Schedule <strong>to</strong> be determined after NavyCritical Design Review.Oc<strong>to</strong>ber 2003January 2004TBDGREENGREENYELLOWC. Fiber Optical Chafe Detection1. Review report.April 2004GREEN2. Make recommendation for dissemination ofinformation, if appropriate.July 2004GREEND. Wire Indenter1. Review report.Oc<strong>to</strong>ber 2003GREEN2. Develop recommendations forenhancements <strong>to</strong> improve utility for wireinspection.April 2004GREEN


SUB-TASK# DESCRIPTION ESTIMATEDCOMPLETION DATESTATUS(RED/GREEN/YELLOW)12.2 (continued) E. Wire Performance Specification1. Review report.2. Develop recommendations for considerationin the FAA wire performance TSO project.January 2004July 2004GREENGREENF. Maintenance Effects on EWIS1. Review report.2. Develop recommendations forenhancements <strong>to</strong> improve EWIS maintenancepractices and non-EWIS practices that impingeupon the EWIS.April 2004January 2005GREENGREENG. Effects of Mixed Wire Types in AircraftEWIS1. Review report.2. Develop recommendations regarding mixingof wire types in aircraft EWIS.April 2004January 2005GREENGREEN


SUB-TASK# DESCRIPTION ESTIMATEDCOMPLETION DATESTATUS(RED/GREEN/YELLOW)12.2 (continued) H. Separation and Segregation in AircraftEWIS1. Review preliminary data and status.2. Review report.3. Develop recommendations regardingseparation and segregation of wire and cablesin aircraft EWIS.January 2004Oc<strong>to</strong>ber 2004July 2005GREENGREENGREENI. Broadband Impedance Measurement1. Review report.2. Make recommendation for dissemination ofinformation, if appropriate.Oc<strong>to</strong>ber 2004January 2005GREENGREENJ. Pseudo Random Binary Reflec<strong>to</strong>metry1. Review preliminary data and status.2. Review report.3. Make recommendation for dissemination ofinformation, if appropriate.April 2004April 2005July 2005GREENGREENGREEN


SUB-TASK# DESCRIPTION ESTIMATEDCOMPLETION DATESTATUS(RED/GREEN/YELLOW)12.2 (continued) K. Pulse Arrested Spark Discharge1. Review preliminary data and status.2. Review report.3. Make recommendation for dissemination ofinformation, if appropriate.April 2004July 2005Oc<strong>to</strong>ber 2005GREENGREENGREENL. Terahertz Reflec<strong>to</strong>metry1. Review report.2. Make recommendation for dissemination ofinformation, if appropriate.Oc<strong>to</strong>ber 2004January 2005GREENGREENM. Wire Degradation Research1. Review preliminary data and statusApril 2004GREEN


SUB-TASK#12.3Exploreadditionalopportunities <strong>to</strong>promotecooperativeefforts andpartnershipsvaluable <strong>to</strong>achieving EWISR&D objectives.DESCRIPTIONA. Micro Energy High Voltage Wire Tester1. Identify maintenance personnel <strong>to</strong>participate in a blind test of the system.B. Advanced Risk Assessment Techniquesfor Aircraft EWIS1. Review preliminary data and status.2. Identify organizations <strong>to</strong> participate inreviewing/testing potential techniques.ESTIMATEDCOMPLETION DATESeptember 2003January 2004April 2004STATUS(RED/GREEN/YELLOW)GREENGREENGREEN3. Provide preliminary tester feedback <strong>to</strong> FAA.July 2004GREENC. NOVA Test System1. Identify organizations <strong>to</strong> participate inreviewing/testing potential techniques.On-goingGREEND. 3-Phase and 28VDC AFCB1. Review preliminary data and statusDecember 2003GREEN2. Review status and make plans.Oc<strong>to</strong>ber 2004GREENE. Identify other opportunitiesOn-goingGREEN