AIRBUS<br />

<strong>Aging</strong> <strong>Aircraft</strong> <strong>Program</strong><br />

Systems & Wiring<br />

Presented by René SAVOIE<br />

Task 2 Working Group member<br />

Seattle November 2001<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 1 SEE5a 956.0503/01 Nov 01


�<br />

General<br />

Contents<br />

• Airbus participation to ATSRAC phase 1<br />

– Sampling inspection of the fleet<br />

– Review fleet service history<br />

– Improvement of maintenance criteria<br />

– Electrical wiring standard practices manual<br />

– <strong>Aircraft</strong> wiring systems training<br />

• Airbus participation to FAA <strong>Aging</strong> Mechanical Systems<br />

program<br />

• Airbus participation to ATSRAC phase 2<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 2 SEE5a 956.0503/01 Nov 01


Airbus participation to ATSRAC Phase 1<br />

<strong>Aging</strong> transport systems rulemaking advisory committee - ATSRAC<br />

1998 - 2000<br />

TASK 1<br />

Sampling<br />

Inspection<br />

FedEx<br />

R .Pope<br />

Intrusive<br />

inspection<br />

AIB: D. Mazzarino<br />

TASK 2<br />

Fleet Service<br />

History review<br />

FedEx<br />

R. Pope<br />

AIB: R. Savoie<br />

Non Intrusive<br />

inspection<br />

AIB: C. Kane<br />

TASK 3<br />

Maintenance<br />

Criteria<br />

Airbus<br />

T. Harbottle<br />

TASK 4<br />

Std. Wiring<br />

Practices<br />

SAE<br />

Dave Allen<br />

AIB: T. Poole<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 3 SEE5a 956.0503/01 Nov 01<br />

TASK 5<br />

Review<br />

Training<br />

Boeing<br />

P. Lapwood<br />

AIB: JP. Capo


�<br />

Phase 1 - Sampling Inspection of the fleet<br />

Task 1 - Airbus work<br />

• Situation from each of the 5 A300 significant items<br />

Action Issue date Compliance<br />

Title Comments<br />

ISB<br />

24-0094<br />

MPD-Intro<br />

MSB<br />

24-0097<br />

Planned<br />

end 2001<br />

Planned<br />

mid 2002<br />

MPD-Intro Planned<br />

mid 2002<br />

MSB<br />

24--0096<br />

Planned<br />

end 2001<br />

Planned<br />

end 2001<br />

R Clamp slippage on strut in zone 270<br />

R<br />

R<br />

R<br />

R<br />

Bundle sagging<br />

Conduit clamping at conduit end<br />

ESPM 20-52-13 repair section provides enhanced<br />

technical process for improved gripping of the<br />

clamping attachment when found loose<br />

ESPM 20-52-13 repair section provides enhanced<br />

technical process for improved gripping of the<br />

clamping attachment when found loose<br />

ESPM 20-52-13 repair section provides enhanced<br />

technical process for improved gripping of the<br />

clamping attachment when found loose<br />

Bundle contacting structure at 811VU IPC 31-16-12 will reflect the latest installation<br />

configuration after MOD/SB embodiment reporting<br />

Bracket unstuck in 800VU IPC31-16-11 will reflect the latest installation<br />

configuration after MOD/SB embodiment reporting<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 4 SEE5a 956.0503/01 Nov 01


�<br />

Phase 1 - Sampling Inspection of the fleet<br />

Task 1<br />

- Conclusion<br />

Status for Airbus: No wiring / wire type airworthiness<br />

concern requiring immediate action on the Airbus fleet<br />

Each findings from the 10 A300 inspections reviewed<br />

& investigated due to their repeat occurrence<br />

None of the five classified as an airworthiness concern<br />

Fixes for the five items defined. SBs, SBs,<br />

enhanced<br />

guidelines and processes to prevent similar conditions<br />

provided through SIL 92-004 dated April 30 / 01<br />

Enhanced awareness of maintenance personnel on wiring<br />

issues is necessary. Training is the key.<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 5 SEE5a 956.0503/01 Nov 01


� Task 2<br />

OIT<br />

Operator<br />

Information<br />

Telex<br />

Phase 1 - Review of fleet service history<br />

• Review existing airworthiness directives, service data<br />

and service experience:<br />

SBs<br />

Service<br />

Bulletins<br />

AD/CN<br />

Airworthiness<br />

Directives/<br />

Consigne de<br />

Navigabilité<br />

SIL<br />

Service<br />

Information<br />

Letter<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 6 SEE5a 956.0503/01 Nov 01<br />

AOT<br />

All<br />

Operator<br />

Telex


273<br />

AD<br />

Phase 1 - Review of fleet service history<br />

� Task 2<br />

93<br />

AOT<br />

SB<br />

+ + + + + +<br />

• 52 documents (mainly ( mainly SB’s) SB’s further reviewed for<br />

reassessment of Failure Mode Effect Analysis (FMEA)<br />

• Result: Result<br />

- Airbus review of service history/document<br />

• Significant numbers of documents have been<br />

scanned: scanned<br />

259<br />

OIT<br />

– 1 CN to be revised to reflect content of AD 84.066.061<br />

– 3 SB ’s upgraded from recommended to mandatory<br />

– 5 SB’s upgraded from desirable to recommended<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 7 SEE5a 956.0503/01 Nov 01<br />

484<br />

CN<br />

About<br />

3000<br />

750<br />

SIL<br />

About<br />

30000<br />

ISP


Phase 1 - Review of fleet service history<br />

� Task 2 -<br />

Conclusion<br />

All ASTRAC queries have been fully answered<br />

Status for Airbus: Airbus few SB revisions issued, issued Customers<br />

informed with OIT’s and SIL 92-004<br />

A300 recommendations validated on A310/A300-600 A/C<br />

(Airbus Airbus volontary basis) basis<br />

A310/A300-600 service history/document review<br />

planned in<br />

Similar A310/A300-600<br />

planned in 2002 (Airbus ( Airbus volontary basis) basis<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 8 SEE5a 956.0503/01 Nov 01


Phase 1 - Improvement on Maintenance Criteria<br />

� Task 3 - Implementation of new logic on A300<br />

• Airbus plan to apply EZAP to the A300 as soon as<br />

possible - target mid 2002<br />

• An industry working group will be formed with<br />

operators and Authorities<br />

• A new Zonal Inspection <strong>Program</strong> will be developed<br />

using MSG-3 logic<br />

• For A300, A300,<br />

promulgation of the new ZIP and the tasks to<br />

be added to operators Systems & Power Plant<br />

programs will be by Inspection Service Bulletin (ISB),<br />

• reflected in the Maintenance Planning Document (MPD) ( MPD)<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 9 SEE5a 956.0503/01 Nov 01


�<br />

Phase 1 - Improvement on Maintenance Criteria<br />

Implementation of new logic on A310/A300-600<br />

• Time scale for application on A310/A300-600 not yet<br />

identified<br />

• Work will be done through the existing Industry<br />

Steering Committee under the Maintenance Review<br />

Board (MRB) process<br />

• New tasks developed will be added to an updated<br />

MRB Report and reflected in the MPD<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 10 SEE5a 956.0503/01 Nov 01


�<br />

Phase 1 - Improvement on Maintenance Criteria<br />

Task 3 - Conclusion<br />

EZAP developed to enable closer attention to be given to<br />

wiring during maintenance program development<br />

Operators will need to address the consequences of the<br />

Task 3 activity relating to new maintenance tasks, revised<br />

inspection criteria and enhanced maintenance practices<br />

Taken together, these actions will result in a significant<br />

enhancement in the condition of wiring installations<br />

Airbus has initiated the process that will lead to<br />

application of EZAP on its aircraft types<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 11 SEE5a 956.0503/01 Nov 01


�<br />

Phase 1 - Electrical wiring Standard Practices Manuals<br />

Task 4 - ESPM & Associated Documentation<br />

Scheduled<br />

maintenance<br />

MPD<br />

Maintenance<br />

Planning<br />

Document<br />

AMM MPD Task<br />

Inputs<br />

from<br />

WG 4<br />

Inputs<br />

from<br />

WG 3<br />

ESPM<br />

Airbus launched Generic<br />

ESPM ESPM - - April April 2001 2001<br />

WIRING FAULT<br />

Inputs<br />

from WG<br />

1, 2 & 4<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 12 SEE5a 956.0503/01 Nov 01<br />

Unscheduled<br />

maintenance


�<br />

Phase 1 - Electrical wiring Standard Practices Manuals<br />

Task 4 - Scheduled Maintenance Links<br />

ESPM 20-53-00 Inspection criteria<br />

A300<br />

24-92-19 Page 601<br />

ESPM<br />

Probable future implementation for the A300/A310/A300-600<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 13 SEE5a 956.0503/01 Nov 01


�<br />

Phase 1 - Electrical wiring Standard Practices Manuals<br />

Task 4 – Conclusion (as applicable to Airbus) Airbus<br />

ASTRAC Task Groups’ recommendations are being applied<br />

in Airbus documentation<br />

Airbus generic ESPM applicable to all Airbus a/c is available<br />

Enhanced ESPM will include “Maintenance Tips” resulting<br />

from ATSRAC recommendations<br />

Airbus will continue to promote the efficient use of all<br />

maintenance manuals by<br />

– Documentation familiarization courses (on-site)<br />

– “How To Use” section in the “Introduction” of all manuals,<br />

including practical examples<br />

– User-friendly training and consultation media (Cadets)<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 14 SEE5a 956.0503/01 Nov 01


�<br />

Phase 1 - <strong>Aircraft</strong> wiring systems training<br />

Task 5 - Airbus wiring systems course project<br />

• Airbus course program development planned<br />

• Customized to cover all Airbus aircraft family<br />

• Based on ATSRAC task 5 curriculum and lesson plans<br />

• Theoretical: 50% / Practical: 50%<br />

• Minimum 1 week course<br />

(expandable as required or necessary)<br />

• Course development completion and availability<br />

planned end 2002<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 15 SEE5a 956.0503/01 Nov 01


�<br />

Phase 1 - <strong>Aircraft</strong> wiring systems training<br />

Task 5 - Airbus wiring systems course (cont’d cont’d)<br />

• Objective is to develop an effective and attractive<br />

training course, balancing<br />

– Media, films, pictures presentation<br />

– Hands-on components / documentation familiarization<br />

– Troubleshooting Troubleshooting<br />

exercises with<br />

• Line-oriented scenarii to solve problems<br />

• Actual standard tool kit for practical repairs<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 16 SEE5a 956.0503/01 Nov 01


�<br />

CD-ROM<br />

Wiring<br />

Systems<br />

Training<br />

Course<br />

Video clips<br />

Pictures<br />

Phase 1 - <strong>Aircraft</strong> wiring systems training<br />

Wide range of training media<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 17 SEE5a 956.0503/01 Nov 01<br />

Hard-copy<br />

+ CD-ROM<br />

ESPM<br />

Microfilms<br />

WDM (AWM,<br />

ASM, AWL)<br />

CD-ROMs CD-ROMs<br />

CAATS<br />

ADRES<br />

TPCI


�<br />

Connector<br />

Assembly<br />

Disassenbly<br />

Phase 1 - <strong>Aircraft</strong> wiring systems training<br />

Standard tool kit for hands-on repair practice<br />

Wire<br />

stripping<br />

Contact<br />

crimping<br />

Insertion<br />

Extraction<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 18 SEE5a 956.0503/01 Nov 01<br />

Splice<br />

assembly<br />

Solder<br />

Sleeve<br />

&<br />

sleeve<br />

heat-shrink heat shrink<br />

Electrical<br />

test<br />

meters


�<br />

Phase 1 - <strong>Aircraft</strong> wiring systems training<br />

Task 5 - Conclusion<br />

Feedback received from airlines, repair stations & industry<br />

+ Recommendations from task task<br />

1, 3, and 4 WGs<br />

+ Assessment of the effectiveness of current training<br />

programs<br />

= Model Curriculum with detailed lesson plans on aircraft<br />

wiring systems developed & provided to operators (SIL 00-076)<br />

This training Model will effectively focus greater attention<br />

on the issue of aging wiring systems<br />

Airbus course availability planned end 2002<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 19 SEE5a 956.0503/01 Nov 01


Phase 1 - Conclusion<br />

� Atsrac phase 1 (1998-2000) - Summary<br />

FAA has launched an ambitious & aggressive program<br />

on <strong>Aircraft</strong> system aging<br />

Airbus has actively participated in ATSRAC, providing<br />

expertise and resources to all working groups<br />

Airbus operators have been regularly informed<br />

through the Operator Operator<br />

Information nformation Telex elex (OIT) channel<br />

More details details<br />

on the ATSRAC tasks and results are<br />

provided through Service Information Letters (SIL)<br />

Airbus also encourage operators to visit the FAA web<br />

site (www ( www.mitrecaasd mitrecaasd.org org/atsrac atsrac/) /)<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 20 SEE5a 956.0503/01 Nov 01


�<br />

Airbus participation to FAA ‘s <strong>Aging</strong> Mechanical System program<br />

Phase 1 (2001-2003) - Flight Control Systems<br />

• Airbus supports the new FAA’s research program to<br />

evaluate aging mechanical system processes to continued<br />

operational safety<br />

• Airbus will contribute to :<br />

– the assessment of design & manufacture’s maintenance<br />

instructions on the A320 Flight Control system Yaw axis<br />

– the assessment of maintenance & service history<br />

associated with this flight control system<br />

– the assessment of the condition of flight control linkages<br />

on aging aircraft (SEDLP)<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 21 SEE5a 956.0503/01 Nov 01


�<br />

Airbus participation to ATSRAC Phase 2<br />

<strong>Aging</strong> transport systems rulemaking advisory committee - ATSRAC<br />

2001 - 2002<br />

TASK 6<br />

Wiring<br />

certification<br />

Airbus / Boeing<br />

AIB: Jean-Luc<br />

Ballenghien<br />

Atsrac phase 2 (2001-2002) - On-going<br />

TASK 7<br />

Electrical Std<br />

Practices<br />

Airbus / Boeing<br />

AIB: Tony<br />

Poole<br />

TASK 8<br />

Wiring Systems<br />

Training<br />

FDX / DLH<br />

AIB: Jean-<br />

Pierre Capo<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 22 SEE5a 956.0503/01 Nov 01<br />

TASK 9<br />

Maintenance<br />

criteria<br />

NWA / VIR<br />

AIB: Tony<br />

Harbottle


�<br />

Phase 2 - Conclusion<br />

Atsrac phase 2 (2001-2002) - On-going<br />

FAA & JAA will implement ATSRAC recommendations<br />

Proposed rulemaking advisory advisory<br />

material expected from<br />

2002 onwards<br />

OAMs, OAMs,<br />

STC applicants, operators, PMIs, PMIs,<br />

ACOs will<br />

be affected<br />

Airbus, Boeing, Bombardier, Dassault, Dassault Embraer fully<br />

involved with FAA and ATSRAC to enhance aircraft<br />

design, maintenance and safety<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 23 SEE5a 956.0503/01 Nov 01


Thank you for your attention<br />

<strong>Aging</strong> <strong>Aircraft</strong> - - Systems & Wiring - - General 24 SEE5a 956.0503/01 Nov 01

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!