Construction
Winter 2012 - The Associated General Contractors of New York ...
Winter 2012 - The Associated General Contractors of New York ...
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
gssssssssssf<br />
2012 Jeffrey J. Zogg Build New York Entrants<br />
7) L.P. Ciminelli – Buffalo Public School, PS 195, City<br />
Honors School<br />
City Honors School was reconstructed during phase III of the<br />
$1.45 billion, district –wide Buffalo Public Schools Reconstruction<br />
Program. The $48 million project featured upgrades to 183,000<br />
SF of existing school and adding over 65,000 SF of additions which<br />
include a new 8-lane competitive swimming pool, diving platforms<br />
and bleachers. LPCiminelli also had to deal with the recovery of<br />
several intact graves from a cemetery dating back to the 1830’s.<br />
7<br />
8) Plaza <strong>Construction</strong> - Brooklyn Navy Yard - Building 92<br />
Originally built in the 1840’s, Building 92, a 9400 SF structure now<br />
serves as the New Brooklyn Navy Yard Historic Center. The restoration<br />
involved stabilizing the structure with a new foundation system<br />
supported by piles and replacement of the structural framing that<br />
was comprised throughout the past 170+ years. The restoration<br />
required additional improvement to support a 20 foot high, 12 ton<br />
ships anchor and chain, along with a 3-ton historic canon.<br />
8<br />
9) R&P Oak Hill Development – SKF Aeroengine Heat<br />
Treatment Facility<br />
This 82,000-square-foot project built for SKFUSA consisted of a<br />
state-of-the-art Heat Treatment Facility and attached corporate<br />
offices. The $13.9 million project dealt with a number of challenges<br />
such as hazardous site materials and severe winter conditions.<br />
9<br />
10) Schimenti <strong>Construction</strong> Co. – REI Flagship, SOHO<br />
Built in the historic Puck Building in NYC, the REI flagship store is<br />
definitely one of a kind. The retail store now features two 14-foot,<br />
nine-tons fly wheels leftover from the buildings original steam powered<br />
plant which at one time drove the worlds largest lithograph presses.<br />
10<br />
11) Turner <strong>Construction</strong> – Kaleida Gates Vascular<br />
Institute<br />
This 10 story, 480,000 SF building has a very unique curtain<br />
wall which includes 8 different elements: curtain wall, storefront,<br />
prefabricated metal panels, corrugated metal panels – 2 types,<br />
punch windows, louver systems, masonry brick and precast<br />
concrete. With the complexities of hospital coordination, Building<br />
Information Modeling was used to coordinate the MEP/FP trades.<br />
12) Welliver – Meier Hall, Elmira College<br />
Meier Hall is a five-story, 140-bed dormitory that was designed in<br />
the collegiate, gothic architecture style. The 64,000 SF building<br />
also houses the resident life staff and visiting faculty at Elmira.<br />
Welliver’s masons from Local No. 3 performed over 8000 hours<br />
of work, laying over 127,000 bricks and 580 tons of limestone. A<br />
19th century masterpiece built in the 21st century.<br />
12<br />
11<br />
AGC NYS CORNERSTONE WINTER 2012<br />
31