Download pdf - OPERC
Download pdf - OPERC
Download pdf - OPERC
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
news<br />
A-Plant wins<br />
prestigious contracts<br />
from Environment<br />
Agency<br />
The Environment Agency is an<br />
Executive Non Departmental<br />
Public Body responsible to the<br />
Secretary of State for Environment,<br />
Food and Rural Affairs and an<br />
Assembly Sponsored Public<br />
Body responsible to the National<br />
Assembly for Wales. Its principal<br />
aims are to protect and improve<br />
the environment, and to promote<br />
sustainable development. The<br />
Agency plays a central role in<br />
delivering the environmental<br />
priorities of Central Government<br />
and the Welsh Assembly<br />
Government through its functions<br />
and roles.<br />
A-Plant has been awarded<br />
two prestigious four-year<br />
framework agreements with<br />
the Environment Agency,<br />
covering both the hire of<br />
tools and equipment and the<br />
maintenance and servicing<br />
of the Agency’s existing fleet<br />
of equipment. A-Plant is one<br />
of the three suppliers on the<br />
hire framework and has been<br />
awarded a single supplier<br />
framework agreement for the<br />
management, maintenance<br />
and servicing of the entire<br />
fleet of powered hand tools<br />
and powered work equipment<br />
at the Environment Agency.<br />
Erik Broderstad, Key Accounts<br />
Sales Director for A-Plant, said,<br />
“The new contracts with the<br />
Environment Agency are highstatus<br />
appointments, which<br />
will utilise our wide range of<br />
expertise in the tool and plant<br />
hire market in the UK. Under<br />
the new maintenance and<br />
servicing framework, we have<br />
sole responsibility for assessing<br />
and advising on the inventories<br />
of equipment held at over 160<br />
locations in the eight regions of the<br />
Environment Agency around the<br />
country.”<br />
To establish the procedures to be<br />
used in this important contract,<br />
A-Plant is carrying out three pilot<br />
projects in the Thames West, North<br />
West North and Midlands East<br />
areas, based in three of the eight<br />
regions. A-Plant will examine every<br />
piece of equipment and submit a<br />
report to the Environment Agency<br />
on the inventory held at each<br />
location in these areas, the age<br />
and condition of the equipment<br />
and proposals on whether the<br />
equipment should be repaired or<br />
replaced. This process will then<br />
be rolled out to all eight regions to<br />
produce a national report for the<br />
Environment Agency.<br />
This is the latest in a raft of<br />
key account wins by A-Plant<br />
which recognise the company’s<br />
commitment to enhancing<br />
service and efficiencies, reducing<br />
costs and administration and<br />
eliminating wastage and non-value<br />
added transaction processes<br />
as measured against Key<br />
Performance Indicators (KPIs)<br />
4<br />
June 2009