04.09.2015 Views

REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...

REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...

REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SCOPE OF SERVICES<br />

5. FINAL MASTER PLAN<br />

A. Based on discussion and input from Advisory Committee and relevant entities a preferred plan direction shall be<br />

identified and documented in writing to the team. Upon receipt of written confirmation the team shall prepare the<br />

Final Master Plan, accompanied with the appropriate supporting technical and written backup and submitted to<br />

the Advisory Committee for final comments.<br />

B. Upon receipt of comments from the State, City, and stakeholders the team will prepare the final summary report<br />

for the Corning Phase 2 Master Plan.<br />

C. Present the Final Master Plan to Planning Commission for approval<br />

D. Present the Final master Plan to the City Council for approval<br />

CHA’s Role<br />

CHA has been working at Corning Preserve since 2001 when we prepared the Phase 1 Master Plan. Our work continued<br />

with design and construction of Hudson Riverway Pedestrian Bridge and Corning Preserve Amphitheater. In 2005, we<br />

prepared the Phase 2 Master Plan for Corning Preserve. With more than a decade worth of experience at the preserve, we<br />

have completed a significant data collection and engineering and environmental analysis. In supporting preparation of the<br />

Phase 2 Master Plan, we can draw on the following information:<br />

• Topographic Survey<br />

• Pedestrian and Traffic Data<br />

• Geotechnical Investigation<br />

• Acoustical Study<br />

• Hazmat Screening<br />

• Phase 2 Schematic Design Drawings<br />

• Boathouse Study<br />

• Environmental Site Assessment<br />

• Aquatic Habitat Impact Study<br />

• Corps of Engineers Application (Preliminary)<br />

CHA will provide engineering and environmental support. We will assist with testing of potential alternatives by<br />

considering:<br />

• Differing levels of traffic, water, sewer, and other utility improvements<br />

• Potential permitting requirements<br />

• Code consistency<br />

• Potential impacts on the natural and man-made environments, adjacent properties<br />

For the preferred Master Plan, we will provide engineering recommendations for:<br />

• Needed infrastructure, utility systems (locations, segments, connections, rights-of-way and easements)<br />

• Amphitheater improvements<br />

• Shoreline and marina improvements<br />

• Pedestrian and vehicular circulation<br />

24<br />

Proposal For Capitalize Albany Corporation<br />

RFP for <strong>Building</strong> a <strong>Tactical</strong> <strong>Revitalization</strong> Plan for Downtown Albany, NY

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!