04.09.2015 Views

REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...

REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...

REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ithaca Commons Redesign l<br />

Ithaca, New York<br />

CLENT<br />

City of Ithaca<br />

SERVICES<br />

Planning<br />

Urban Design<br />

Landscape Architecture<br />

Architecture<br />

Civil Engineering<br />

Graphic Design<br />

SIZE<br />

75,000 square feet<br />

COST<br />

Est. $9 million<br />

COMPLETION DATE<br />

Ongoing<br />

Ithaca Commons, a two-block pedestrian<br />

mall, is the social and economic<br />

center of the city. Sasaki completed a<br />

concept design to assess existing conditions<br />

and provide recommendations<br />

to improve the commons as a retail<br />

environment and community gathering<br />

space.<br />

The preliminary concept plan draws<br />

inspiration from the striking gorges of<br />

Ithaca. The distinctive paving pattern<br />

blends historic circulation patterns of<br />

the area with the linear quality of the<br />

geologic features of the gorges. Planted<br />

amenity zones seem to grow from the<br />

splits in the stone. The water feature<br />

along Bank Alley was directly inspired<br />

by the cracking, splitting characteristics<br />

of the stone found in Ithaca’s gorges.<br />

Water bubbles, seeps, and drips over<br />

the stone in a playful manner that<br />

invites children to explore. These features,<br />

combined with improved performance<br />

spaces and ample amounts of<br />

movable seating, supply the energy and

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!