04.09.2015 Views

REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...

REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...

REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SCOPE OF SERVICES<br />

• One or more original signature celebrations unique to the location that work to establish or reinforce its identity.<br />

• Propose interim events (and locations) to occur pre-construction for the purpose of promoting the project.<br />

• Permanent and temporary attractions (and locations) such as carousels, playgrounds, street vendors, cafes and<br />

“Pop Up” events.<br />

• Present all programming ideas in an annual activation plan illustrated with precedent images and sketches.<br />

Site Design & Infrastructure:<br />

• Coordinate with the AKRF team and identify appropriate locations for activation.<br />

• Recommend “placemaking” enhancements such as temporary street furniture, plantings, banners, kiosks,<br />

umbrellas, etc.<br />

• Identify infrastructure elements required to support the activation plan and coordinate positions of the<br />

infrastructure components with the AKRF team.<br />

• Identify potential rental venues.<br />

• Recommend uses for existing on-site structures.<br />

• Inform the team with information related to proposed uses such as audience flow, crowd control, loading zones,<br />

and security lighting.<br />

CHA:<br />

• CHA will support preparation of the implementation plan by focusing on infrastructure and transportation<br />

improvements related to development opportunities. We will outline the need for expanded or upgraded<br />

infrastructure along with order of magnitude costs.<br />

• Techniques to manage traffic and congestion while maintaining a pedestrian-friendly environment will be<br />

outlined. Smart Growth techniques to reduce car and truck traffic and take advantage of intermodal opportunities<br />

will also be identified.<br />

Potential Optional Deliverables<br />

• Parking strategic plan<br />

• Park/open space/streetscape plans<br />

• Entertainment and cultural program<br />

• Competing business areas<br />

DELIVERABLES:<br />

▷▷<br />

Summary of applicable best practices<br />

▷▷<br />

Implementation Plan (including funding strategies, partnerships, and<br />

timeframes/schedule)<br />

▷▷<br />

Performance Reporting System/metrics<br />

▷ ▷ Potential Optional Deliverables: Implementation guide (standalone editable<br />

document)<br />

28<br />

Proposal For Capitalize Albany Corporation<br />

RFP for <strong>Building</strong> a <strong>Tactical</strong> <strong>Revitalization</strong> Plan for Downtown Albany, NY

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!