REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...
REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...
REQUESTFORQUALIFICATI ONS Building a Tactical Revitalization ...
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SCOPE OF SERVICES<br />
• One or more original signature celebrations unique to the location that work to establish or reinforce its identity.<br />
• Propose interim events (and locations) to occur pre-construction for the purpose of promoting the project.<br />
• Permanent and temporary attractions (and locations) such as carousels, playgrounds, street vendors, cafes and<br />
“Pop Up” events.<br />
• Present all programming ideas in an annual activation plan illustrated with precedent images and sketches.<br />
Site Design & Infrastructure:<br />
• Coordinate with the AKRF team and identify appropriate locations for activation.<br />
• Recommend “placemaking” enhancements such as temporary street furniture, plantings, banners, kiosks,<br />
umbrellas, etc.<br />
• Identify infrastructure elements required to support the activation plan and coordinate positions of the<br />
infrastructure components with the AKRF team.<br />
• Identify potential rental venues.<br />
• Recommend uses for existing on-site structures.<br />
• Inform the team with information related to proposed uses such as audience flow, crowd control, loading zones,<br />
and security lighting.<br />
CHA:<br />
• CHA will support preparation of the implementation plan by focusing on infrastructure and transportation<br />
improvements related to development opportunities. We will outline the need for expanded or upgraded<br />
infrastructure along with order of magnitude costs.<br />
• Techniques to manage traffic and congestion while maintaining a pedestrian-friendly environment will be<br />
outlined. Smart Growth techniques to reduce car and truck traffic and take advantage of intermodal opportunities<br />
will also be identified.<br />
Potential Optional Deliverables<br />
• Parking strategic plan<br />
• Park/open space/streetscape plans<br />
• Entertainment and cultural program<br />
• Competing business areas<br />
DELIVERABLES:<br />
▷▷<br />
Summary of applicable best practices<br />
▷▷<br />
Implementation Plan (including funding strategies, partnerships, and<br />
timeframes/schedule)<br />
▷▷<br />
Performance Reporting System/metrics<br />
▷ ▷ Potential Optional Deliverables: Implementation guide (standalone editable<br />
document)<br />
28<br />
Proposal For Capitalize Albany Corporation<br />
RFP for <strong>Building</strong> a <strong>Tactical</strong> <strong>Revitalization</strong> Plan for Downtown Albany, NY