06.12.2012 Views

UltraLight Steel Auto Body - Final Report - American Iron & Steel ...

UltraLight Steel Auto Body - Final Report - American Iron & Steel ...

UltraLight Steel Auto Body - Final Report - American Iron & Steel ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Comparison of ULSAB with Year 2000 structure<br />

<strong>Body</strong> Structure Mass:<br />

Parts Fabrication:<br />

Assembly:<br />

Cost: (in $US)<br />

ULSAB <strong>Final</strong> <strong>Report</strong><br />

ULSAB Year 2000<br />

Net weight (kg) 203 250<br />

Stampings 184 230<br />

Hydroformings 10 0<br />

Purchased parts 9 20<br />

Material utilization 49 55<br />

Direct labor 59 79<br />

Indirect labor 47 36<br />

Parts count: 158 200<br />

Large stampings 11 6<br />

Medium stampings 39 79<br />

Small stampings 44 50<br />

Hydroformings 2 0<br />

Purchased parts 62 65<br />

Die sets: 61 109<br />

Transfer 14 20<br />

Tandem 27 59<br />

Progressive 18 30<br />

Hydroform 2 0<br />

Hits per die set:<br />

Transfer 4.1 3.8<br />

Tandem 3.6 3.2<br />

Hits per part:<br />

Transfer/tandem combined 2.5 2.5<br />

Direct labor 64 80<br />

Indirect labor 178 210<br />

Number of spot welds 2206 3250<br />

Length (mm) laser weld 18286 0<br />

Number of robots 136 200<br />

Number of laser welders 13 0<br />

Number of assbly stations 114 130<br />

Assembly bldg. area (m2) 20925 30000<br />

Stamped parts 584 609<br />

Hydroformed rail 41 0<br />

Purchased parts 41 41<br />

Assembly 281 329<br />

TOTAL COST $947 $979<br />

49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!