PLATINUM inverter 2100 S, 3100 S, 3800 S, 4300 S, 4301 S, 4600 S, 4601 S<br />

Startup<br />

Language selection<br />

Key<br />

<br />

OK<br />

Select language.<br />

Accept selected language.<br />

Function<br />

After the configuration process has been started:<br />

the inverter scans the network connected by the EIA485-Bus for<br />

other inverters.<br />

all inverters connected to the network are blocked.<br />

EIA485 bus<br />

As long as the network scan (Scanning Network) is still in process, the<br />

display shows the following screen:<br />

When the network scan is completed, the display shows the number of<br />

detected bus participants. In case of a single inverter, the display shows<br />

01.<br />

Note<br />

The network scan can only recognize more than 1 inverter if the inverters<br />

are correctly networked via the EIA 485 interface.<br />

18 Installation and Operating <strong>Manual</strong>: PLATINUM inverter 2100 S, 3100 S, 3800 S, 4300 S, 4301 S, 4600 S, 4601 S<br />

Date 09/2008<br />

Mat.-No. 717 770