- Page 1 and 2:
Understanding APIICP653 Reading 2 A
- Page 3 and 4:
Petroleum Tank Charlie Chong/ Fion
- Page 5 and 6:
API 653 Exam Administration -- Publ
- Page 7 and 8:
ATTENTION: Only the following secti
- Page 9 and 10:
• American Society of Mechanical
- Page 11 and 12:
Charlie Chong/ Fion Zhang
- Page 13 and 14:
Charlie Chong/ Fion Zhang
- Page 15 and 16:
API650-2013 BOK Search Keyword “6
- Page 17 and 18:
I. CALCULATIONS & TABULAR EVALUATIO
- Page 19 and 20:
4. WELD SIZES FOR SHELL & ROOF OPEN
- Page 21 and 22:
10. RECONSTRUCTED TANK SHELL - MINI
- Page 23 and 24:
A. The inspector should have the kn
- Page 25 and 26:
III. NONDESTRUCTIVE EXAMINATION ASM
- Page 27 and 28:
10. API 650, Annex D 11. API 650, A
- Page 29 and 30:
API Standard 653, Tank Inspection,
- Page 31 and 32:
A. Calculation questions will be or
- Page 33 and 34:
8.1.1 Application Radiographic exam
- Page 35 and 36:
Figure 8.1—Radiographic Requireme
- Page 37 and 38:
Figure 8.1—Radiographic Requireme
- Page 39 and 40:
6. Complete radiograph of each vert
- Page 41 and 42:
c) Vertical joints in which the she
- Page 43 and 44:
8.1.2.3 One spot radiograph shall b
- Page 45 and 46:
8.1.2.9 When bottom annular plates
- Page 47 and 48:
8.1.3.3 The requirements of T-285 i
- Page 49 and 50:
8.1.6 Determination of Limits of De
- Page 51 and 52:
8.1.7 Repair of Defective Welds 8.1
- Page 53 and 54:
Charlie Chong/ Fion Zhang
- Page 55 and 56:
4. WELD SIZES FOR SHELL & ROOF OPEN
- Page 57 and 58:
C L Nozzle Neck bevel should be abo
- Page 59 and 60:
C L Regular Low type t A (see Note
- Page 61 and 62:
Shell plate of lowest shell course
- Page 63 and 64: 16-mm ( 5 /8-in.) diameter bolts in
- Page 65 and 66: 5 mm ( 3 /16 in.) 6 mm ( 1 /4 in.)
- Page 67 and 68: Table 5.6a—Dimensions for Shell N
- Page 69 and 70: Column 1 Column 2 Column 3 Column 4
- Page 71 and 72: 8. IMPACT TESTING The inspector sho
- Page 73 and 74: 4.2.9.3 An impact test shall be per
- Page 75 and 76: NOTE 1 The Group II and Group V lin
- Page 77 and 78: Table 4.3a—Linear Equations for F
- Page 79 and 80: Charlie Chong/ Fion Zhang
- Page 81 and 82: 10. RECONSTRUCTED TANK SHELL - MINI
- Page 83 and 84: 5.6.3.2 The required minimum thickn
- Page 85 and 86: A. The inspector should have the kn
- Page 87 and 88: 9.2.1.2 The welding procedures used
- Page 89 and 90: 9.2.2 Impact Tests 9.2.2.1 Impact t
- Page 91 and 92: 9.2.2.5 Impact tests shall show min
- Page 93 and 94: C. API-650 and API-653: General wel
- Page 95 and 96: API Standard 653, Tank Inspection,
- Page 97 and 98: BODY OF KNOWLEDGE API-653 ABOVEGROU
- Page 99 and 100: Determining joint efficiency may be
- Page 101 and 102: Calculate “MRT”, minimum remain
- Page 103 and 104: III. NONDESTRUCTIVE EXAMINATION ASM
- Page 105 and 106: 7. NDE requirements for eddy curren
- Page 107 and 108: a) types of tanks covered b) applic
- Page 109 and 110: API-653 ABOVEGROUND STORAGE TANK Pu
- Page 111 and 112: http://independent.academia.edu/Cha
- Page 113: Charlie Chong/ Fion Zhang