- Page 1: Understanding APIICP653 Reading 2 A
- Page 5 and 6: API 653 Exam Administration -- Publ
- Page 7 and 8: ATTENTION: Only the following secti
- Page 9 and 10: • American Society of Mechanical
- Page 11 and 12: Charlie Chong/ Fion Zhang
- Page 13 and 14: Charlie Chong/ Fion Zhang
- Page 15 and 16: API650-2013 BOK Search Keyword “6
- Page 17 and 18: I. CALCULATIONS & TABULAR EVALUATIO
- Page 19 and 20: 4. WELD SIZES FOR SHELL & ROOF OPEN
- Page 21 and 22: 10. RECONSTRUCTED TANK SHELL - MINI
- Page 23 and 24: A. The inspector should have the kn
- Page 25 and 26: III. NONDESTRUCTIVE EXAMINATION ASM
- Page 27 and 28: 10. API 650, Annex D 11. API 650, A
- Page 29 and 30: API Standard 653, Tank Inspection,
- Page 31 and 32: A. Calculation questions will be or
- Page 33 and 34: 8.1.1 Application Radiographic exam
- Page 35 and 36: Figure 8.1—Radiographic Requireme
- Page 37 and 38: Figure 8.1—Radiographic Requireme
- Page 39 and 40: 6. Complete radiograph of each vert
- Page 41 and 42: c) Vertical joints in which the she
- Page 43 and 44: 8.1.2.3 One spot radiograph shall b
- Page 45 and 46: 8.1.2.9 When bottom annular plates
- Page 47 and 48: 8.1.3.3 The requirements of T-285 i
- Page 49 and 50: 8.1.6 Determination of Limits of De
- Page 51 and 52: 8.1.7 Repair of Defective Welds 8.1
- Page 53 and 54:
Charlie Chong/ Fion Zhang
- Page 55 and 56:
4. WELD SIZES FOR SHELL & ROOF OPEN
- Page 57 and 58:
C L Nozzle Neck bevel should be abo
- Page 59 and 60:
C L Regular Low type t A (see Note
- Page 61 and 62:
Shell plate of lowest shell course
- Page 63 and 64:
16-mm ( 5 /8-in.) diameter bolts in
- Page 65 and 66:
5 mm ( 3 /16 in.) 6 mm ( 1 /4 in.)
- Page 67 and 68:
Table 5.6a—Dimensions for Shell N
- Page 69 and 70:
Column 1 Column 2 Column 3 Column 4
- Page 71 and 72:
8. IMPACT TESTING The inspector sho
- Page 73 and 74:
4.2.9.3 An impact test shall be per
- Page 75 and 76:
NOTE 1 The Group II and Group V lin
- Page 77 and 78:
Table 4.3a—Linear Equations for F
- Page 79 and 80:
Charlie Chong/ Fion Zhang
- Page 81 and 82:
10. RECONSTRUCTED TANK SHELL - MINI
- Page 83 and 84:
5.6.3.2 The required minimum thickn
- Page 85 and 86:
A. The inspector should have the kn
- Page 87 and 88:
9.2.1.2 The welding procedures used
- Page 89 and 90:
9.2.2 Impact Tests 9.2.2.1 Impact t
- Page 91 and 92:
9.2.2.5 Impact tests shall show min
- Page 93 and 94:
C. API-650 and API-653: General wel
- Page 95 and 96:
API Standard 653, Tank Inspection,
- Page 97 and 98:
BODY OF KNOWLEDGE API-653 ABOVEGROU
- Page 99 and 100:
Determining joint efficiency may be
- Page 101 and 102:
Calculate “MRT”, minimum remain
- Page 103 and 104:
III. NONDESTRUCTIVE EXAMINATION ASM
- Page 105 and 106:
7. NDE requirements for eddy curren
- Page 107 and 108:
a) types of tanks covered b) applic
- Page 109 and 110:
API-653 ABOVEGROUND STORAGE TANK Pu
- Page 111 and 112:
http://independent.academia.edu/Cha
- Page 113 and 114:
Charlie Chong/ Fion Zhang
- Page 115:
Good Luck! Charlie Chong/ Fion Zhan