26.11.2015 Views

CLOSED CIRCUIT TELEVISION (CCTV) SEWER INSPECTION STANDARD

(cctv) sewer inspection standard - City of Welland

(cctv) sewer inspection standard - City of Welland

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CITY OF WELLAND <strong>CCTV</strong> <strong>SEWER</strong> <strong>INSPECTION</strong> <strong>STANDARD</strong><br />

2.5.3 The Contractor must input the correct Road Name in the Header Section. In the case of new or<br />

unassumed roads, the contractor is to be given the approved Street Names as per the development<br />

plans. These approved Street Names must be used.<br />

2.5.4 In the case of easements or servicing corridors, the Street Name is to be listed as the name of the<br />

street immediately upstream of the servicing corridor, followed by the word “Easement”, e.g. “Deere<br />

Street Easement”.<br />

If there is more than one servicing easement on a particular street, additional information should be<br />

added after the easement name in parentheses (brackets), giving the relative location of the<br />

easement on the street. e.g. “Meadow Crescent Easement (North)”.<br />

The above nomenclature does not apply to rear-yard catchbasin leads. These pipe runs are to be<br />

labelled by the name of the street, then the acronym “RYCB”, followed by the lot number on which the<br />

pipe is located. e.g. “Autumn Crescent RYCB Lot 14”.<br />

2.5.5 As a component of the manhole information in the Header Section, the Contractor is to input the<br />

approximate depth of the Start and Finish sewer inverts. Refer to Schedule A-1.<br />

2.6 SURVEY REPORT FORMAT – CONDITION DETAILS SECTION<br />

2.6.1 The Header Information is to be completed in accordance with Schedule A-2 and NASSCO<br />

Standards.<br />

2.6.2 The City Of Welland uses NASSCO, Pipeline Assessment Certification Program Version 6.0 (PACP).<br />

2.7 SURVEY PHOTOGRAPHS<br />

2.7.1 For the colour photographs to be provided under the contract, the following shall apply:<br />

a) Photographs shall be clearly identified in relation to the location, sewer length, duty, survey<br />

direction, chainage, date and time when photograph was taken.<br />

b) Where observations exist at adjacent points, photographs should not be taken at intervals of<br />

less than two (2) metres unless absolutely necessary to show the second observation.<br />

c) All photographs relating to a specific survey of a sewer length shall be kept together in order of<br />

ascending chainage and included with the report. Photo numbers for each specific sewer length<br />

shall consist of three (3) digits and shall be numbered consecutively starting from 001.<br />

d) Digital colour photographs shall be of a quality comparable to colour photographs developed<br />

from film (minimum 1200 x 1600 Pixels) and shall be in JPEG format. The naming convention<br />

for a digital photo file shall consist of the prefix “SEW”, followed by the Job No and finally the<br />

Photo No (i.e. SEW-3452-001).<br />

e) Photographs shall be in colour, clear, durable, and shall be approximately 125mm x 90 mm<br />

(printed equivalent).<br />

f) All colour photographs shall be of the original subjects rather than photos taken from a video<br />

monitor.<br />

T:\Clerical\Templates Tender Document Forms\<strong>CCTV</strong> Sewer Insp Standard Aug 2008-Revised Feb 2013.doc<br />

Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!