3.3 Control circuit voltage adopted for electrically operated closing <strong>and</strong> tripping mechanism <strong>of</strong><br />

high voltage circuit breakers, auxiliary relays, indicating lamps etc shall be 110V DC.<br />

3.4 Unless otherwise specified auxiliary supply to space heaters, cubicle lamps, sockets etc. shall be<br />

240V, AC single phase fed from auxiliary ACDB located in Control room.<br />

4.0 GUARANTEE<br />

The contractor shall warrant that the plant will be new <strong>and</strong> in accordance with the<br />

specification <strong>and</strong> that the equipment structures ect. will be free from defects on materials <strong>and</strong><br />

workmanship. The contractor shall furnish performance guarantee for a period <strong>of</strong> 24 calendar<br />

month (guarantee period) from the date <strong>of</strong> commissioning for smooth operation <strong>of</strong> sub<br />

station.<br />

5.0 OTHER REQUIREMENTS<br />

5.1 Accessibility <strong>and</strong> interchangeability<br />

All working parts, ins<strong>of</strong>ar as possible, are to be arranged for convenience <strong>of</strong> operation,<br />

inspection, lubrication <strong>and</strong> ease <strong>of</strong> replacement with minimum downtime. All like parts <strong>of</strong><br />

equipment or <strong>of</strong> duplicate equipment <strong>of</strong>fered shall be interchangeable.<br />

5.2 Quality <strong>and</strong> Workmanship<br />

5.3 Painting<br />

The quality <strong>of</strong> materials <strong>of</strong> construction <strong>and</strong> the workmanship <strong>of</strong> the finished products /<br />

components shall be in accordance with the highest st<strong>and</strong>ard <strong>and</strong> practices adopted for the<br />

equipment covered by the specification.<br />

All items <strong>of</strong> equipment <strong>and</strong> materials shall be thoroughly cleaned <strong>and</strong> painted in accordance<br />

with relevant Indian St<strong>and</strong>ards. The finish paint shall be done with two coats <strong>of</strong> epoxy based<br />

final paint <strong>of</strong> colour Shade RAL 7032 <strong>of</strong> IS:5 for indoor equipment<br />

6.0 Approved make <strong>of</strong> Equipments Make:<br />

a) 66 KV SF-6 circuit Breaker……………..ABB/CG/Siemens/Alstom<br />

b) 66 KV CT……………………………….Hi-voltage/Test field/Mehru/<br />

ABB/BHEL/CGL<br />

c) 66 KV PT……………………………….Hi-voltage/Test field/Mehru<br />

ABB/BHEL/CGL<br />

16