07.12.2012 Views

Download - Daman and Diu Electricity Department, Government of ...

Download - Daman and Diu Electricity Department, Government of ...

Download - Daman and Diu Electricity Department, Government of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WEIGHT & SPACE REQUIREMENT.<br />

58. Weight <strong>of</strong> 3-phase breaker complete :<br />

with operating mechanism, support-<br />

ing insulators, frame work etc.<br />

59. Impact loading for foundation :<br />

design to include dead load plus<br />

impact value on opening at<br />

maximum interrupting ratings<br />

in terms <strong>of</strong> equivalent static load.<br />

60. Weight <strong>of</strong> heaviest package (Kgs). :<br />

space requirements. (Length,<br />

width, height).<br />

61. SF6 gas/air pressure details<br />

a) Rated SF6 gas : 7 bar absolute<br />

b) IS/equivalent st<strong>and</strong>ard applicable : IEC-376<br />

for SF6 gas.<br />

c) Qty <strong>of</strong> SF 6 supplied for :<br />

Actual use (kg)<br />

Spare Qty (kg)<br />

d) chemical composition <strong>of</strong> gas :<br />

e) Action on compensated gas pressure :<br />

give alarm cut<strong>of</strong>f .<br />

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *<br />

36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!