- Page 1 and 2: Charlie Chong/ Fion Zhang
- Page 3 and 4: AST Tanks Charlie Chong/ Fion Zhang
- Page 5 and 6: Adobe Acrobat Reader Hotkeys Ctrl +
- Page 7 and 8: Charlie Chong/ Fion Zhang
- Page 9 and 10: API 653 Exam Administration -- Publ
- Page 11 and 12: ATTENTION: Only the following secti
- Page 13 and 14: • American Society of Mechanical
- Page 15 and 16: http://independent.academia.edu/Cha
- Page 17: The Magical Book of Tank Inspection
- Page 21 and 22: Charlie Chong/ Fion Zhang
- Page 23 and 24: Q78. For dome roofs that are flange
- Page 25 and 26: Q81. For impact testing weld metal
- Page 27 and 28: 9.2.2.5 Impact tests shall show min
- Page 29 and 30: Q105. In performance qualification
- Page 31 and 32: GENERAL NOTE: The “Thickness of W
- Page 33 and 34: 9.2.1.3 Material specifications lis
- Page 35 and 36: Q129. On an initial in-service rive
- Page 37 and 38: Q137. Plate for shells, roofs and b
- Page 39 and 40: Q160. The "L" in actual thickness d
- Page 41 and 42: Charlie Chong/ Fion Zhang
- Page 43 and 44: Q259. What percentage of selected s
- Page 45 and 46: Q61. Per API 650, external floating
- Page 47 and 48: Q71. The maximum reinforcement thic
- Page 49 and 50: API650: 7.2.3 Shells 7.2.3.1 Plates
- Page 51 and 52: API575: Annex A (normative) Selecte
- Page 53 and 54: Q119. You are adding a 6 inch blend
- Page 55 and 56: Q120. Who is responsible for compli
- Page 57 and 58: Happy Holi Charlie Chong/ Fion Zhan
- Page 59 and 60: QW-304 Welders Except for the speci
- Page 61 and 62: QW-306 Combination of Welding Proce
- Page 63 and 64: Charlie Chong/ Fion Zhang
- Page 65 and 66: QW-401.3 Supplementary Essential Va
- Page 67 and 68: Q7. The test coupon for a PQR consi
- Page 69 and 70:
Q9. What production base metals is
- Page 71 and 72:
Q1 . When qualifying a welder at 6G
- Page 73 and 74:
Q31. Welding electrodes are grouped
- Page 75 and 76:
Q93. For P-11 materials, weld groov
- Page 77 and 78:
Q12. What is the minimum dimension
- Page 79 and 80:
Charlie Chong/ Fion Zhang
- Page 81 and 82:
Q17. What are the required spacings
- Page 83 and 84:
Q 26. Determine the minimum accepta
- Page 85 and 86:
Charlie Chong/ Fion Zhang
- Page 87 and 88:
Charlie Chong/ Fion Zhang
- Page 89 and 90:
NOTE 1 Dimensions given are from to
- Page 91 and 92:
d. A welded-on patch plate may be p
- Page 93 and 94:
9.10.1.2 Repairs within the Critica
- Page 95 and 96:
Things to remember on critical zone
- Page 97 and 98:
4.4.3 Tank Bottom Release Preventio
- Page 99 and 100:
Q57. What finished welds do NOT req
- Page 101 and 102:
Q70. Where exterior tank bottom cor
- Page 103 and 104:
Q77. The standard used for repairs
- Page 105 and 106:
Q88. In order to qualify for a hydr
- Page 107 and 108:
Q89. In order to qualify for a hydr
- Page 109 and 110:
Q9) A hot tap in a 1.25" thick tank
- Page 111 and 112:
9.14.1.2 The minimum height of tank
- Page 113 and 114:
Q34. Corrosion on the underside of
- Page 115 and 116:
Q42. Radiographs for an evaluated,
- Page 117 and 118:
Q54. What type of tank settlement d
- Page 119 and 120:
Figure 9.1—Acceptable Details for
- Page 121 and 122:
Clay Pot Rice 煲 仔 饭 Charlie C
- Page 123 and 124:
Q56. Guidance for evaluation of an
- Page 125 and 126:
Good Luck! Charlie Chong/ Fion Zhan