02.04.2016 Views

Understanding API ICP653 Reading 14-Worksheet-10A

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Q69. What preparation is required to base metal before welding on tanks that<br />

have surface in contact with leaded gasoline?<br />

1. Scrape down to bare metal 6" (150 cm)<br />

2. Scrape down to bare meta 12" (300 cm)<br />

3. Abrasive blast any immediate areas affected<br />

4. Steam clean any immediate areas affected<br />

ANS: 2<br />

<strong>API</strong>2015: 12.4.2 Hot Work Permit<br />

In addition to the requirement for an entry permit, a qualified person shall<br />

issue a hot work permit to conduct hot work inside or around a tank that<br />

has been in leaded service.<br />

12.4.2.1 The qualified person issuing the hot work permit shall require that<br />

surfaces of tanks that have been in contact with leaded gasoline, lead<br />

additives or products containing lead be cleaned, scraped or wire brushed<br />

down. The qualified person shall assure that bare metal covers an area at<br />

least 12 inches (30 centimeters) surrounding any area that may be subject<br />

to excessive heat exposure from welding or other hot work operations.<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!