SLR Namibia (Pty) Ltd<br />

FIGURE 1-2: LOCAL SETTING OF THE PROPOSED OTJIKOTO GOLD MINE PROJECT<br />

1.3 INTRODUCTION TO THE ENVIRONMENTAL IMPACT ASSESSMENT<br />

SLR Ref.733.01023.0002<br />

<strong>Report</strong> No.1<br />

Page 1-4<br />

Prior to implementing the proposed project, environmental clearance is required on the basis of an<br />

approved <strong>EIA</strong> report and Environmental Management Plan (EMP).<br />

The overall task of the <strong>EIA</strong> process is to ensure that the criteria of sustainable development are met and<br />

TDF & waste<br />

that all identified and potential environmental and social impacts have been addressed and mitigated<br />

rock dumps<br />

where necessary. The term <strong>EIA</strong>, as interpreted in the Namibian Environmental Management Act 7 of<br />

2007, includes the “<strong>com</strong>plex of natural and anthropogenic factors and elements that are mutually<br />

interrelated and affect the ecological equilibrium and the quality of life, and includes:<br />

(a) the natural environment that is the land, water and air, all organic and inorganic material and<br />

all living organisms; and<br />

(b) the human environment that is the landscape and natural, cultural, historical, aesthetic,<br />

economic and social heritage and values.”<br />

<strong>Otjikoto</strong> Gold Mine <strong>EIA</strong> <strong>Report</strong> July 2012