3.2 THE SCOPING PHASE<br />

SLR Ref. 733.01023.0002<br />

<strong>Report</strong> No.1<br />

Ministries and<br />

parastatals – key<br />

officers<br />

Department of Water<br />

Affairs<br />

Special interest groups Other IAPs<br />

Individual specialists<br />

Ministry of Education Press / Media<br />

Ministry of Trade and<br />

Industry<br />

NamWater<br />

NamPower<br />

TransNamib<br />

Namport<br />

Roads Authority<br />

Page 3-2<br />

Avdale <strong>com</strong>menced the pre-feasibility study and scoping phase of the environmental impact assessment<br />

for its <strong>Otjikoto</strong> Project in August 2008. IAPs were invited to register and <strong>com</strong>ment on the project by way of<br />

advertisements in newspapers, through public meetings and by submitting <strong>com</strong>ments to ASEC. This is<br />

reported in Appendix B.<br />

3.2.1 SCOPING REPORT<br />

The ESIA scoping report, <strong>com</strong>prising the project outline and a number of specialist studies, was placed<br />

for public review at libraries in Otavi, Otjiwarongo and Windhoek prior to the public meetings held during<br />

the week of 8-10 July 2008. Additionally, meetings with Regional and Local Councils, key ministries and<br />

parastatals were held prior to the public meetings.<br />

<strong>Otjikoto</strong> Gold Mine <strong>EIA</strong> <strong>Report</strong> June 2012