SLR Namibia (Pty) Ltd<br />
SLR Ref.733.01023.0002<br />
<strong>Report</strong> No.1<br />
Page 1-6<br />
<strong>EIA</strong> Regulation requirement Policy requirements Reference in the <strong>EIA</strong> report<br />
An assessment of each identified The assessment and Section 7<br />
potentially significant impact, including -<br />
� cumulative impacts;<br />
� the nature of the impact;<br />
� the extent and duration of the<br />
impact;<br />
evaluation.<br />
� the probability of the impact<br />
occurring;<br />
� the degree to which the impact can<br />
be reversed;<br />
� the degree to which the impact may<br />
cause irreplaceable loss of<br />
resources; and<br />
� the degree to which the impact can<br />
be mitigated;<br />
A description of any assumptions, Assumptions and<br />
Section 8<br />
uncertainties and gaps in knowledge; limitations.<br />
In<strong>com</strong>plete or unavailable<br />
information.<br />
An opinion as to whether the activity Conclusions and<br />
Section 9<br />
should or should not be authorised, and<br />
if the opinion is that it should be<br />
authorised, any conditions that should<br />
be made in respect of that authorisation.<br />
re<strong>com</strong>mendations.<br />
An environmental impact statement<br />
Section 9<br />
which contains:<br />
Executive Summary<br />
� a summary of the key findings of the<br />
environmental impact assessment;<br />
and<br />
� a <strong>com</strong>parative assessment of the<br />
positive and negative implications of<br />
the proposed activity and identified<br />
alternatives; and<br />
� any specific information that may be<br />
required in terms of the Act.<br />
Management plan<br />
Monitoring programme<br />
Audit proposal.<br />
Appendix M<br />
Executive summary<br />
Contents page<br />
Introduction.<br />
See above<br />
Terms of reference. Appendix B<br />
Approach to study. Section 1.3.1<br />
Administrative, legal and<br />
Policy requirements.<br />
Section 2<br />
Environmental contract. To be issued by MET.<br />
Definitions of technical<br />
terms.<br />
See above.<br />
Acknowledgements.<br />
Appendices. See end of report.<br />
<strong>Otjikoto</strong> Gold Mine <strong>EIA</strong> <strong>Report</strong> July 2012