Article ><br />

Precast Concrete Modular<br />

Building System<br />

CASE STUDY<br />

Swansea Bay New Student<br />

A<strong>cc</strong>ommodation<br />

Client:<br />

Swansea University<br />

Regeneration Partner:<br />

St Modwen (Part of a multi<br />

partner public/private funding<br />

initiative)<br />

Main Contractor:<br />

Galliford Try<br />

Precast Modular Building<br />

Installation Contractor:<br />

FP McCann<br />

Value:<br />

£50 million<br />

with hidden tie rods. Joints are finished with<br />

a high-strength non-shrink grout, fully<br />

conforming with Building Regulations. Walls<br />

and ceilings are to a quality fair face finish<br />

allowing for a simple gypsum wash prior to<br />

final decoration. 541 individual bathroom<br />

pods are also being installed as part of the<br />

build.<br />

The precast modular building system offers<br />

excellent acoustic and thermal mass<br />

properties as well as fire resistant qualities<br />

associated with precast concrete.<br />

Project Overview<br />

St Modwen, the regeneration specialist<br />

behind the new £450 million Swansea<br />

University Bay campus, is delivering an<br />

additional £50m of student a<strong>cc</strong>ommodation<br />

and student facilities at the site which<br />

opened its doors in September. The<br />

a<strong>cc</strong>ommodation agreement will see 545<br />

additional student apartments for<br />

o<strong>cc</strong>upation during the first quarter of 2016.<br />

Main building contractor Galliford Try was<br />

appointed to the contract in 2014 and work<br />

commenced on land formerly a BP<br />

distribution hub in autumn last year.<br />

Project Details<br />

FP McCann (Bell and Webster) su<strong>cc</strong>essfully<br />

tendered for the supply and install contract<br />

on student a<strong>cc</strong>ommodation buildings 15 & 16<br />

and commenced deliveries of the precast<br />

concrete modular building system late last<br />

year. Based on a process where walls, floor<br />

and ceiling slabs are linked together to form<br />

a unique cross wall construction, the precast<br />

panels are factory formed to suit design<br />

requirements.<br />

In total some 2400 individual precast units<br />

are being installed consisting of walls, floors,<br />

stairs and landings. Gable walls and party<br />

walls are 160mm thick with each room floor<br />

slab 175mm thick. Window and door<br />

openings have been a<strong>cc</strong>ommodated and<br />

each bedroom has four conduits cast into<br />

the walls for electrics and communications<br />

networks.<br />

All horizontal and vertical sections are<br />

designed for ease of build, linking together<br />

To date, over 33,000 precast concrete<br />

rooms have been manufactured by FP<br />

McCann and erected on a variety of projects<br />

with one of the most prestigious being the<br />

788 room University of East London campus<br />

at Royal Albert Docks. 30 student<br />

a<strong>cc</strong>ommodation projects have been<br />

completed nationwide providing nearly<br />

19,000 rooms. On-going contracts include<br />

Southampton University and the student<br />

a<strong>cc</strong>ommodation on part of the huge<br />

£1billion North West Cambridge<br />

development.<br />

The new Swansea campus is a major<br />

highlight of St. Modwen’s ongoing 3,500<br />

acre regeneration programme across South<br />

Wales. The on-going development of the<br />

university will create a world-class<br />

educational establishment that will benefit<br />

students, staff and the local community for<br />

generations to come.<br />

<strong>MMC</strong> <strong>Feb</strong>ruary 2016 25