Precast Concrete Modular<br />
Building System<br />
CASE STUDY<br />
Swansea Bay New Student<br />
A<strong>cc</strong>ommodation<br />
Client:<br />
Swansea University<br />
Regeneration Partner:<br />
St Modwen (Part of a multi<br />
partner public/private funding<br />
initiative)<br />
Main Contractor:<br />
Galliford Try<br />
Precast Modular Building<br />
Installation Contractor:<br />
FP McCann<br />
Value:<br />
£50 million<br />
with hidden tie rods. Joints are finished with<br />
a high-strength non-shrink grout, fully<br />
conforming with Building Regulations. Walls<br />
and ceilings are to a quality fair face finish<br />
allowing for a simple gypsum wash prior to<br />
final decoration. 541 individual bathroom<br />
pods are also being installed as part of the<br />
build.<br />
The precast modular building system offers<br />
excellent acoustic and thermal mass<br />
properties as well as fire resistant qualities<br />
associated with precast concrete.<br />
Project Overview<br />
St Modwen, the regeneration specialist<br />
behind the new £450 million Swansea<br />
University Bay campus, is delivering an<br />
additional £50m of student a<strong>cc</strong>ommodation<br />
and student facilities at the site which<br />
opened its doors in September. The<br />
a<strong>cc</strong>ommodation agreement will see 545<br />
additional student apartments for<br />
o<strong>cc</strong>upation during the first quarter of 2016.<br />
Main building contractor Galliford Try was<br />
appointed to the contract in 2014 and work<br />
commenced on land formerly a BP<br />
distribution hub in autumn last year.<br />
Project Details<br />
FP McCann (Bell and Webster) su<strong>cc</strong>essfully<br />
tendered for the supply and install contract<br />
on student a<strong>cc</strong>ommodation buildings 15 & 16<br />
and commenced deliveries of the precast<br />
concrete modular building system late last<br />
year. Based on a process where walls, floor<br />
and ceiling slabs are linked together to form<br />
a unique cross wall construction, the precast<br />
panels are factory formed to suit design<br />
requirements.<br />
In total some 2400 individual precast units<br />
are being installed consisting of walls, floors,<br />
stairs and landings. Gable walls and party<br />
walls are 160mm thick with each room floor<br />
slab 175mm thick. Window and door<br />
openings have been a<strong>cc</strong>ommodated and<br />
each bedroom has four conduits cast into<br />
the walls for electrics and communications<br />
networks.<br />
All horizontal and vertical sections are<br />
designed for ease of build, linking together<br />
To date, over 33,000 precast concrete<br />
rooms have been manufactured by FP<br />
McCann and erected on a variety of projects<br />
with one of the most prestigious being the<br />
788 room University of East London campus<br />
at Royal Albert Docks. 30 student<br />
a<strong>cc</strong>ommodation projects have been<br />
completed nationwide providing nearly<br />
19,000 rooms. On-going contracts include<br />
Southampton University and the student<br />
a<strong>cc</strong>ommodation on part of the huge<br />
£1billion North West Cambridge<br />
development.<br />
The new Swansea campus is a major<br />
highlight of St. Modwen’s ongoing 3,500<br />
acre regeneration programme across South<br />
Wales. The on-going development of the<br />
university will create a world-class<br />
educational establishment that will benefit<br />
students, staff and the local community for<br />
generations to come.<br />