Ashmole Academy<br />
MTX were awarded the contract to design, manufacture and install a new flagship<br />
6th form centre for Ashmole Academy, Southgate London.<br />
From the<br />
outset<br />
the aim<br />
was to<br />
produce a<br />
vibrant,<br />
modern building<br />
and environment<br />
for students<br />
entering higher and<br />
further education who<br />
would be using the<br />
building daily as their hub<br />
for studies and relaxation. The<br />
building was also to cater for an influx in<br />
additional student numbers and increase<br />
capacity from 150 to 320 pupils.<br />
A bespoke building comprising of multi<br />
coloured multi textured facades to all<br />
elevations encompassing entrance lobby area<br />
with a<strong>cc</strong>ess to 1st floor via staircase or platform<br />
lift, ground floor lounge and seating area, 2 no<br />
staff offices, toilet facilities and a in house café<br />
catering to staff and pupils. A 1st floor area<br />
state of the art electronic library/study area<br />
with 3 staff offices and servers room. Finishes<br />
within the building are bright and specifically<br />
designed around the brief to instil a sense of<br />
place for all users of the facility.<br />
The building and sub structure too have been<br />
specially designed for this project and take into<br />
a<strong>cc</strong>ount the many challenge’s this site<br />
presented. Internally the ground floor main<br />
area is finished with all mechanical and<br />
electrical services left on show along with the<br />
steel framework of the modules. This creates a<br />
modern, industrial look further complemented<br />
with additional features such as feature walls,<br />
reclaimed brick wall and suspended lighting of<br />
various types.<br />
The installation was earmarked for a weekday<br />
installation over 3 days and whilst the school<br />
remained fully operational to pupils and staff.<br />
The location of the school within a residential<br />
area, meant that meticulous planning would be<br />
needed to ensure that the vehicles carrying the<br />
modules could be delivered safely, without<br />
impedance or disruption to a very busy suburb<br />
of London. MTX su<strong>cc</strong>essfully closed of a<br />
number of residential roads to ensure this took<br />
place and with minimal disruption to road users<br />
and residents alike with all 18 modules being<br />
installed over a 3 day period. The project has<br />
been a great su<strong>cc</strong>ess and entered into service<br />
at the beginning of the new school term. The<br />
project was completed in just 25 weeks.<br />
“We would like to take this opportunity to thank<br />
MTX Contracts Ltd for delivering this project, to<br />
...The MTX team have<br />
demonstrated a high level<br />
of competency, and worked<br />
closely with everyone to<br />
complete a ‘fully fit for<br />
purpose’ solution.<br />
We are proud that our new<br />
building has already<br />
received so many positive<br />
comments and<br />
congratulations...<br />
a very high standard and in compliance with<br />
budget and timescale deadlines.<br />
The MTX team have demonstrated a high level<br />
of competency, and worked closely with<br />
everyone to complete a ‘fully fit for purpose’<br />
solution.<br />
We are proud that our new building has already<br />
received so many positive comments and<br />
congratulations.” Daniel Powell – Finance<br />
Director – Ashmole Academy.<br />
www.mtx.co.uk/mtx-education<br />