Ashmole Academy<br />

MTX were awarded the contract to design, manufacture and install a new flagship<br />

6th form centre for Ashmole Academy, Southgate London.<br />

From the<br />

outset<br />

the aim<br />

was to<br />

produce a<br />

vibrant,<br />

modern building<br />

and environment<br />

for students<br />

entering higher and<br />

further education who<br />

would be using the<br />

building daily as their hub<br />

for studies and relaxation. The<br />

building was also to cater for an influx in<br />

additional student numbers and increase<br />

capacity from 150 to 320 pupils.<br />

A bespoke building comprising of multi<br />

coloured multi textured facades to all<br />

elevations encompassing entrance lobby area<br />

with a<strong>cc</strong>ess to 1st floor via staircase or platform<br />

lift, ground floor lounge and seating area, 2 no<br />

staff offices, toilet facilities and a in house café<br />

catering to staff and pupils. A 1st floor area<br />

state of the art electronic library/study area<br />

with 3 staff offices and servers room. Finishes<br />

within the building are bright and specifically<br />

designed around the brief to instil a sense of<br />

place for all users of the facility.<br />

The building and sub structure too have been<br />

specially designed for this project and take into<br />

a<strong>cc</strong>ount the many challenge’s this site<br />

presented. Internally the ground floor main<br />

area is finished with all mechanical and<br />

electrical services left on show along with the<br />

steel framework of the modules. This creates a<br />

modern, industrial look further complemented<br />

with additional features such as feature walls,<br />

reclaimed brick wall and suspended lighting of<br />

various types.<br />

The installation was earmarked for a weekday<br />

installation over 3 days and whilst the school<br />

remained fully operational to pupils and staff.<br />

The location of the school within a residential<br />

area, meant that meticulous planning would be<br />

needed to ensure that the vehicles carrying the<br />

modules could be delivered safely, without<br />

impedance or disruption to a very busy suburb<br />

of London. MTX su<strong>cc</strong>essfully closed of a<br />

number of residential roads to ensure this took<br />

place and with minimal disruption to road users<br />

and residents alike with all 18 modules being<br />

installed over a 3 day period. The project has<br />

been a great su<strong>cc</strong>ess and entered into service<br />

at the beginning of the new school term. The<br />

project was completed in just 25 weeks.<br />

“We would like to take this opportunity to thank<br />

MTX Contracts Ltd for delivering this project, to<br />

...The MTX team have<br />

demonstrated a high level<br />

of competency, and worked<br />

closely with everyone to<br />

complete a ‘fully fit for<br />

purpose’ solution.<br />

We are proud that our new<br />

building has already<br />

received so many positive<br />

comments and<br />

congratulations...<br />

a very high standard and in compliance with<br />

budget and timescale deadlines.<br />

The MTX team have demonstrated a high level<br />

of competency, and worked closely with<br />

everyone to complete a ‘fully fit for purpose’<br />

solution.<br />

We are proud that our new building has already<br />

received so many positive comments and<br />

congratulations.” Daniel Powell – Finance<br />

Director – Ashmole Academy.<br />

www.mtx.co.uk/mtx-education<br />