4C <strong>VERIFICATION</strong> <strong>REGULATIONS</strong><br />

VERSION 2.1 | APRIL 2016<br />

Severity: If it occurs, how<br />

severe will its effect be on<br />

performance?<br />

Probability: How likely is the occurrence of this risk factor?<br />

Almost<br />

certain<br />

(Occurs<br />

often or<br />

happens<br />

with most of<br />

BPs)<br />

Likely<br />

(Occurs<br />

several<br />

times or<br />

happens<br />

with<br />

several BPs<br />

Occasional<br />

(Occurs<br />

sporadically<br />

or with not<br />

so many<br />

BPs)<br />

Seldom<br />

(Could<br />

occur with<br />

very few<br />

BPs)<br />

Unlikely<br />

(Hardly<br />

ever or<br />

never<br />

occurs.)<br />

Significant (The Managing<br />

Entity is unable to control<br />

the situation, verification<br />

fails.) High High High Medium Medium<br />

Moderate (The Managing<br />

Entity can handle the<br />

situation with difficulty,<br />

but minimum<br />

requirements to be<br />

licensed are met.) High High Medium Medium Low<br />

Minor (The Managing<br />

Entity can manage the<br />

situation with ease.<br />

Minimum requirements to<br />

be licensed are met.) High Medium Medium Low Low<br />

Insignificant (The<br />

situation has nearly zero<br />

effect on the overall<br />

performance of 4C Units.<br />

Requirements are met.) Medium Low Low Low Low<br />

In principle, the evaluation of risk factors is carried out during the preparation stage prior to the<br />

information provided to verifiers during the opening meeting, the interview with the Managing Entity<br />

and/or an inspection of the facilities.<br />

7.3.3 Sample size<br />

As a baseline system, 4C Verification uses a universal sampling formula for a verification which is:<br />

As a minimum 50% of the square root of the total number of Business Partners (BP) of a 4C Unit + the<br />

Managing Entity (ME).<br />

© 2016 | Coffee Assurance Services | Page 32 of 72