WORLD ENERGY COUNCIL | URANIUM AN D NUCLEAR<br />

The competitiveness of nuclear is enhanced further when the ‘systems’ costs of different<br />

technologies are included. The standard calculation of levelised costs takes the costs at the<br />

site boundary (i.e., does not include transmission and distribution costs) and most<br />

importantly takes no account of the balancing and adequacy requirements needed to<br />

guarantee supply when needed. All technologies have systems costs, but they are most<br />

pronounced for intermittent generation technologies. The charts below give an indication of<br />

the magnitude of these costs in four countries.<br />

FIGURES 4: PROJECTED COSTS OF GENERATION ELECTRICITY 2015<br />

FRANCE: PLANT LCOE PLUS SYSTEM COST $/MWH, 7% DISCOUNT FACTOR<br />

KOREA: PLANT LCOE PLUS SYSTEM COST $/MWH, 7% DISCOUNT FACTOR<br />

UNITED KINGDOM: PLANT LCOE PLUS SYSTEM COST $/MWH, 7% DISCOUNT<br />