3 United States:<br />

construction<br />

of two 6.1 and<br />

3.6 km tunnels<br />

(the external<br />

diameter of the<br />

tunnelling machine<br />

is 5.3 metres)<br />

to supply the<br />

new Brightwater<br />

wastewater<br />

treatment plant,<br />

north of Seattle.<br />

In russia, Freyssinet<br />

lifted the 4,200-tonne<br />

metal spans (each<br />

60 metres long)<br />

for the Ulyanovsk<br />

Bridge over the Volga.<br />

the spans were<br />

transported by barges<br />

and lifted onto the<br />

45-metre piles by<br />

means of sixteen 4,000<br />

kN jacks supplied by<br />

Hebetec, a specialised<br />

subsidiary of Freyssinet.<br />

2 3<br />

25