22.01.2018 Views

Western News: September 05, 2017

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WESTERN NEWS Latest Christchurch news at www.star.kiwi<br />

Tuesday <strong>September</strong> 5 <strong>2017</strong> 3<br />

<strong>News</strong><br />

Wastewater work will affect traffic<br />

WESTMORLAND residents<br />

are being warned to expect<br />

traffic delays in the coming<br />

weeks.<br />

City council work is about<br />

to start on the new south-east<br />

Halswell wastewater project in<br />

the area.<br />

Traffic delays will affect<br />

motorists between the Cashmere<br />

Rd and Penruddock Rise<br />

intersection and the south end<br />

of Hendersons Rd.<br />

City council project manager<br />

Kylie Hills said stop-go traffic<br />

control would be put in place at<br />

the Cashmere Rd and Penruddock<br />

Rise intersection, and at<br />

two pipe-trench road crossings<br />

in and near the Hendersons Rd<br />

and Cashmere Rd intersection.<br />

“We’re asking those that<br />

travel through this area to allow<br />

an extra five minutes for their<br />

journeys,” she said.<br />

But Ms Hills assured the city<br />

council would get the work<br />

done as quickly as possible.<br />

“While there will be some<br />

disruption to motorists the<br />

long-term benefits to local residents<br />

in the area will outweigh<br />

the traffic delays in the short<br />

term.”<br />

The Cashmere Rd branch<br />

of the South East Halswell<br />

Wastewater scheme will divert<br />

ROADWORKS: Traffic delays are likely between the Cashmere Rd and Penruddock Rise<br />

intersection and the south end of Hendersons Rd over the coming weeks. ​<br />

flows from Westmorland to a<br />

new pump station being built<br />

on Sparks Rd.<br />

This will take wastewater<br />

flows away from older<br />

downstream infrastructure<br />

and into other parts of the<br />

network.<br />

It will allow at risk infrastructure<br />

to be renewed without<br />

interruption of residents’<br />

wastewater services as well as<br />

increasing the capacity of the<br />

local network.<br />

The overall scheme involves<br />

constructing a pressure sewer<br />

network which is more than<br />

8km long and up to 450mm in<br />

diameter, along with constructing<br />

a new pump station on<br />

Sparks Rd and carrying out<br />

upgrades to existing pump<br />

stations.<br />

The wastewater pipelines<br />

are being constructed in three<br />

sections – the first section runs<br />

through south-east Halswell<br />

from Kennedys Bush Rd to<br />

the new Sparks Rd pump station.<br />

The second section will run<br />

between the pump station at<br />

the bottom of Penruddock Rise<br />

to the new pump station on<br />

Sparks Rd.<br />

And the third section is<br />

from the new pump station on<br />

Sparks Rd to an existing pump<br />

station on Wigram Rd.<br />

Local<br />

<strong>News</strong><br />

Now<br />

In Brief<br />

Fire rages, homes at risk<br />

NEW REWI ALLEY BOOK<br />

Thirty years after former<br />

Christchurch Boys’ High School<br />

student Rewi Alley’s death, a new<br />

biography has been printed to<br />

introduce his achievements to<br />

younger generations. Written by his<br />

niece, Philippa Reynolds, it details<br />

the life of the writer, educator and<br />

political activist who dedicated 60<br />

years to humanitarian causes in<br />

China. A copy of the biography was<br />

presented to Chinese vice-president<br />

Li Yuanchao at a ceremony in the<br />

Great Hall of the People, Beijing.<br />

CBHS will also hold a function in<br />

December to celebrate the 120th<br />

anniversary of Mr Alley’s birth.<br />

CYCLEWAY CONSTRUCTION<br />

Construction of the Northern<br />

Line cycleway connection between<br />

Harewood Rd and Restell St,<br />

Papanui, has begun. The work will<br />

end in mid-January. A new cycle<br />

and pedestrian crossing will also be<br />

created at the Harewood Rd railway.<br />

FOOTBALL TOUR HELP<br />

Burnside High School student Nova<br />

Daly-Davies, 17, has been selected<br />

in the New Zealand secondary<br />

schools under-18 football team to<br />

tour Singapore. Nova received $500<br />

from the Fendalton-Waimairi-<br />

Harewood Community Board to go<br />

towards her trip from <strong>September</strong> 29<br />

to October 6.<br />

We’ve been trusted to look after hundreds of<br />

properties all over Christchurch.<br />

You can trust us to look after your’s too.<br />

Book online via our website<br />

www.riccartonclinic.co.nz<br />

OPEN 7 DAYS<br />

Ph: 343 3661 | 4 Yaldhurst Rd<br />

Property Manager of<br />

the Year NZ 2015/16<br />

Ray Hastie<br />

Manager<br />

027 448 8225<br />

Nicola Flanagan<br />

Property Manager<br />

021 914 332<br />

Paula Hastie -<br />

Rebekah Whalley<br />

Assistant Property<br />

Accounts Administrator<br />

Manager<br />

03 331 6755<br />

Nominated for Ray White New Zealand Property Management Office of the Year, 2016/17<br />

Local Experts – Citywide Knowledge<br />

Phone (03) 331 6755<br />

www.propertymanagementchristchurch.com<br />

Abbey Nolan<br />

Property Manager<br />

027 379 5021<br />

Prier Manson Real Estate Ltd Licensed (REAA 2008)<br />

FOR YOUR NEW HOME OR RENOVATION<br />

Blinds<br />

Curtains<br />

Shutters<br />

Awnings<br />

Screens<br />

up to<br />

40%<br />

off<br />

(for a limited time only)<br />

12<br />

Months<br />

Interest<br />

Free<br />

(Terms and conditions apply)<br />

0800 836 587 www.venluree.co.nz Mobile Van Service

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!