SA_VOL2 EMPLOYED
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1<br />
NTS<br />
4<br />
NTS<br />
ALUMINUM PV FRAMING<br />
2<br />
1 : 50<br />
5<br />
1 : 50<br />
3<br />
1 : 50<br />
Q<br />
canopy system assembly<br />
Primary rib truss위에 고정 철물을 이용하여 원형의 hoop들이 위치하고, 차례로 gutter rib & cage, gutter<br />
surface, flexible joint for pv panel, pv panel frame, pv panel, infill panel들이 위치하게 됩니다.<br />
DM Stamp<br />
MTL-321<br />
METAL WALL PANEL<br />
PV-2 GLASS LAMINATED<br />
PHOTOVOLTAIC PANEL<br />
MTL-212<br />
AESS CATEGORY 1, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
MTL-212<br />
AESS CATEGORY 1, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
1,100 TYP<br />
PV-2 GLASS LAMINATED<br />
PHOTOVOLTAIC PANEL<br />
MTL-212<br />
AESS CATEGORY 1, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
5<br />
MTL-411<br />
GLS-120<br />
TEMPERED GLASS, DOUBLE LAYERED,<br />
FRIT PATTERN<br />
3,000 TYP.<br />
1,050<br />
600504<br />
Copyright by Bureau Expo Dubai 2020 (EX20). All rights reserved. This<br />
document may not, in whole or in part, be reproduced, stored, transmitted or<br />
distributed in any form or by any means, whether electronic, mechanical, by<br />
photocopy, recording or otherwise, without the prior written permission of<br />
EX20. Except where otherwise expressly agreed in writing by EX20, EX20<br />
shall have no responsibility or liability for any loss (direct, consequential or<br />
otherwise) which may arise from reliance on or use of this document or the<br />
information contained therein.<br />
DO NOT SCALE THIS DRAWING.<br />
2,500<br />
1,050<br />
N<br />
1,050<br />
MTL-320<br />
METAL FLOOR PANEL<br />
MTL-315<br />
STAINLESS STEEL TENSION RODS<br />
PV-2 GLASS LAMINATED<br />
PHOTOVOLTAIC PANEL<br />
MTL-317<br />
STAINLESS STEEL WIRE MESH<br />
PLA-202<br />
CURVED NON-SLIP WALKING SURFACE<br />
MTL-212<br />
AESS CATEGORY 1, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
MTL-212<br />
AESS CATEGORY 1, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
MTL-211<br />
AESS CATEGORY 4, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
MTL-211<br />
AESS CATEGORY 4, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
MTL-317<br />
STAINLESS STEEL WIRE MESH<br />
PATTERN DOESN'T REPRESENT ACTUAL<br />
MESH PATTERN FOR MORE INFORMATION<br />
REFER TO ARCHITECTURAL DESIGN REPORT<br />
MTL-321<br />
METAL WALL PANEL<br />
MTL-320<br />
METAL FLOOR PANEL<br />
PLA-202<br />
CURVED NON-SLIP WALKING SURFACE<br />
GLS-120<br />
TEMPERED GLASS, DOUBLE LAYERED,<br />
FRIT PATTERN<br />
MTL-412<br />
ALUMINUM PV INFILL PANELS<br />
3<br />
600508<br />
No<br />
Description<br />
<strong>SA</strong>FETY, HEALTH AND ENVIRONMENT INFORMATION<br />
Brief details on the identified hazard symbol referencing the unusual residual<br />
hazards / risks are listed above.<br />
PERIMETER PV AXON DETAIL<br />
PERIMETER PV PLAN DETAIL AT LOUVERS LEVEL (REFLECTED CELILING PLAN)<br />
PV-2 GLASS LAMINATED<br />
PHOTOVOLTAIC PANEL<br />
PERIMETER PV PLAN DETAIL AT PV LEVEL<br />
1 50% DD MR WS 06/29/17<br />
0 03 CANOPY TENDER ISSUE MR WS 06/12/17<br />
Rev Description Apvr Chk'd Date<br />
Client<br />
PV-2 GLASS LAMINATED<br />
PHOTOVOLTAIC PANEL<br />
EXPO 2020 Lehbab Road,<br />
DWC South<br />
Dubai - United Arab Emirates<br />
T: +971 4 555 2020<br />
PV-1 STANDARD PHOTOVOLTAIC PANEL<br />
PV-2 GLASS LAMINATED<br />
PHOTOVOLTAIC PANEL<br />
PV-1 STANDARD PHOTOVOLTAIC PANEL<br />
GLS-120<br />
TEMPERED GLASS, DOUBLE LAYERED,<br />
FRIT PATTERN<br />
MTL-411<br />
ALUMINUM PV FRAMING<br />
PV-2 GLASS LAMINATED<br />
PHOTOVOLTAIC PANEL<br />
4<br />
600508<br />
GLS-120<br />
TEMPERED GLASS, DOUBLE LAYERED,<br />
FRIT PATTERN<br />
MTL-411<br />
ALUMINUM PV FRAMING<br />
MTL-321<br />
METAL WALL PANEL<br />
MTL-320<br />
METAL FLOOR PANEL<br />
PLA-202<br />
CURVED NON-SLIP WALKING SURFACE<br />
Development Manager<br />
Project Manager<br />
Local Consultant<br />
Emaar Properties PJSC<br />
P.O. Box 9440, Dubai, UAE<br />
T: +971 4 3673333<br />
F: +971 4 3673000<br />
enquiry@emaar.ae<br />
Turner International Middle East, Ltd.<br />
Turner Construction - International LLC<br />
P.O. Box 13036 - Dubai, UAE<br />
P: +971 4 337 0990<br />
F: +971 4 334 8216<br />
tci.dxb@tcco.com<br />
Floor 2, Hassanicor Building, Al Barsha First<br />
P.O. Box 454801, Dubai, UAE<br />
T: +971 4 399 4788<br />
F: +971 4 399 4780<br />
rpedubai@emirates.net.ae<br />
VAR<br />
2,500<br />
PV-2 GLASS LAMINATED<br />
PHOTOVOLTAIC PANEL<br />
Design Architect<br />
637 West 27th Street<br />
New York, New York 10001<br />
T: +01 212.693.3600<br />
Parcel IDE / Community<br />
5219784 / Madinat Al Mataar<br />
Project Title<br />
EXPO2020 SUSTAINABILITY PAVILION<br />
Project Adress<br />
Drawing Title<br />
CANOPY LOUVER EXPLODED AXON DETAIL<br />
MTL-320<br />
METAL FLOOR PANEL<br />
PLA-202<br />
CURVED NON-SLIP WALKING SURFACE<br />
MTL-212<br />
AESS CATEGORY 1, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
MTL-321<br />
METAL WALL PANEL<br />
MTL-317<br />
STAINLESS STEEL WIRE MESH<br />
MTL-212<br />
AESS CATEGORY 1, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
MTL-212<br />
AESS CATEGORY 1, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
MTL-322<br />
METAL CATWALK SUPPORT FRAME<br />
MTL-212<br />
AESS CATEGORY 1, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
MTL-212<br />
AESS CATEGORY 1, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
MTL-211<br />
AESS CATEGORY 4, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
MTL-212<br />
AESS CATEGORY 1, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
MTL-212<br />
AESS CATEGORY 1, APPLIED HIGH<br />
PERFORMANCE FINISH<br />
TYPICAL CANOPY LOUVER SECTION DETAIL<br />
EVENT<br />
C144200<br />
00<br />
6<br />
CANOPY ROOF DETAILS<br />
Approved<br />
Seal Date<br />
06/12/17<br />
Designed Drawn Checked<br />
GA KD WS<br />
Model File Ref:<br />
Scale A1 (594x841) Revision No<br />
92001-MDL-C144200-AR-000002 As indicated 1<br />
Drawing No<br />
92001-DWG-C144200-AR-600504<br />
92001-MDL-C144200-AR-000002