College Avenue: Setting the standard for<br />
Student Accommodation<br />
Queens University Belfast’s (QUB) brand-new student accommodation at<br />
College Avenue, beautifully brings together a suite of multi-functional<br />
systems from architectural aluminium systems’ company, Metal Technology.<br />
With an overall project value of £35,000,000, the state-of-the-art student<br />
accommodation brings together effective space optimisation and practical<br />
design to create a safe space for students in a central Belfast location with<br />
a range of purpose-built areas to facilitate a balanced approach to study,<br />
health and wellbeing.<br />
Spanning 11 floors and an impressive 240,000ft 2 the accommodation<br />
features Metal Technology’s System 17 high rise curtain walling on all<br />
facades in combination with System 5-35Hi+ turn only windows, System<br />
23 louvres and System 5-20D Hi+ doors . These purpose designed louvres<br />
have been tested to BS6180 for guarding providing a safe environment<br />
even when the full height windows are fully opened. Key considerations<br />
when choosing these products included practicality, safety, acoustics and<br />
thermal performance throughout the building.<br />
www.metaltechnology.com<br />
Kingspan Tek adds excitement to<br />
school dinners<br />
Pupils at Filton Avenue Primary School are enjoying the benefits of<br />
offsite construction in their warm, vibrant new dining hall, erected in a<br />
matter of weeks using the Kingspan TEK Building System.<br />
Studio LIME proposed a simple pitched roof design, using brightly<br />
coloured cladding to encourage students to enjoy healthy school<br />
meals inside. The construction work was completed by Jones Building<br />
Group during term time. This was one of the reasons the Kingspan<br />
TEK Building System was specified. Architect, Alex Robertson,<br />
explained:<br />
“The Kingspan TEK Building System was chosen to reduce the on-site<br />
duration of the project and the noise and disruption that goes with it. A<br />
number of classrooms are located nearby and operated effectively for<br />
the duration of the project. We were also keen to use the system as it<br />
allowed us to get a weather proof envelope as quickly as possible,<br />
reducing the scope for delays.”<br />
www.kingspantek.co.uk<br />
Protect Membranes installed in award winning education project<br />
A combination of Protect construction membranes has been supplied<br />
and installed at Glasdir School, a modern school building constructed<br />
to BREEAM Excellent standards using BIM Level 2.<br />
Built by Wynne Construction and designed by architects Lovelock<br />
Mitchell, this £10.5 million project involved re-locating two primary<br />
schools to a brand new shared site in Ruthin, delivering a complete<br />
solution to client Denbighshire County Council as part of the Welsh<br />
Government’s 21st Century Schools and Education Programme.<br />
Manufactured offsite by construction specialist Innovaré using their advanced<br />
i-SIP technology, an independently accredited Structural Insulated Panel System<br />
(SIP), the resulting structure was both water and airtight, delivering thermal<br />
efficiency to a final U-value of 0.15w/m 2 k. The structure led to Innovaré being the<br />
winners of the Best Use of SIPs category at the 2018 Structural Timber Awards.<br />
Protect’s TF200 external breather membrane was used externally on the SIP to ensure high water resistance and vapour permeability, minimising the<br />
risk of interstitial condensation in the wall structure. Internally, Protect BarriAir was used to ensure the integrity of airtightness and to significantly<br />
reduce heat loss and air leakage through the building fabric.<br />
Craig Lee, Supply Chain Manager at Innovaré commented, “Over 10,000m 2 of<br />
i-SIP components including internal and external walls and roof cassettes were<br />
erected by Innovaré in only 13 weeks, 55% faster than traditional build. By using<br />
Protect’s membranes we have peace of mind, both in long term performance as<br />
well as timely deliveries, which helped us to maximise the speed benefits of<br />
offsite construction.”<br />
For details of how Protect products can be incorporated into residential and<br />
commercial builds, please visit the below website, email<br />
info@protectmembranes.com or call 0161 905 5700, quoting ‘Glasdir School.’<br />
www.protectmembranes.com<br />
Images courtesy of Wynne Construction<br />
Feb 2019 <strong>M11</strong><br />
17