12.02.2019 Views

a.aa MMC M11 52pp Web

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

College Avenue: Setting the standard for<br />

Student Accommodation<br />

Queens University Belfast’s (QUB) brand-new student accommodation at<br />

College Avenue, beautifully brings together a suite of multi-functional<br />

systems from architectural aluminium systems’ company, Metal Technology.<br />

With an overall project value of £35,000,000, the state-of-the-art student<br />

accommodation brings together effective space optimisation and practical<br />

design to create a safe space for students in a central Belfast location with<br />

a range of purpose-built areas to facilitate a balanced approach to study,<br />

health and wellbeing.<br />

Spanning 11 floors and an impressive 240,000ft 2 the accommodation<br />

features Metal Technology’s System 17 high rise curtain walling on all<br />

facades in combination with System 5-35Hi+ turn only windows, System<br />

23 louvres and System 5-20D Hi+ doors . These purpose designed louvres<br />

have been tested to BS6180 for guarding providing a safe environment<br />

even when the full height windows are fully opened. Key considerations<br />

when choosing these products included practicality, safety, acoustics and<br />

thermal performance throughout the building.<br />

www.metaltechnology.com<br />

Kingspan Tek adds excitement to<br />

school dinners<br />

Pupils at Filton Avenue Primary School are enjoying the benefits of<br />

offsite construction in their warm, vibrant new dining hall, erected in a<br />

matter of weeks using the Kingspan TEK Building System.<br />

Studio LIME proposed a simple pitched roof design, using brightly<br />

coloured cladding to encourage students to enjoy healthy school<br />

meals inside. The construction work was completed by Jones Building<br />

Group during term time. This was one of the reasons the Kingspan<br />

TEK Building System was specified. Architect, Alex Robertson,<br />

explained:<br />

“The Kingspan TEK Building System was chosen to reduce the on-site<br />

duration of the project and the noise and disruption that goes with it. A<br />

number of classrooms are located nearby and operated effectively for<br />

the duration of the project. We were also keen to use the system as it<br />

allowed us to get a weather proof envelope as quickly as possible,<br />

reducing the scope for delays.”<br />

www.kingspantek.co.uk<br />

Protect Membranes installed in award winning education project<br />

A combination of Protect construction membranes has been supplied<br />

and installed at Glasdir School, a modern school building constructed<br />

to BREEAM Excellent standards using BIM Level 2.<br />

Built by Wynne Construction and designed by architects Lovelock<br />

Mitchell, this £10.5 million project involved re-locating two primary<br />

schools to a brand new shared site in Ruthin, delivering a complete<br />

solution to client Denbighshire County Council as part of the Welsh<br />

Government’s 21st Century Schools and Education Programme.<br />

Manufactured offsite by construction specialist Innovaré using their advanced<br />

i-SIP technology, an independently accredited Structural Insulated Panel System<br />

(SIP), the resulting structure was both water and airtight, delivering thermal<br />

efficiency to a final U-value of 0.15w/m 2 k. The structure led to Innovaré being the<br />

winners of the Best Use of SIPs category at the 2018 Structural Timber Awards.<br />

Protect’s TF200 external breather membrane was used externally on the SIP to ensure high water resistance and vapour permeability, minimising the<br />

risk of interstitial condensation in the wall structure. Internally, Protect BarriAir was used to ensure the integrity of airtightness and to significantly<br />

reduce heat loss and air leakage through the building fabric.<br />

Craig Lee, Supply Chain Manager at Innovaré commented, “Over 10,000m 2 of<br />

i-SIP components including internal and external walls and roof cassettes were<br />

erected by Innovaré in only 13 weeks, 55% faster than traditional build. By using<br />

Protect’s membranes we have peace of mind, both in long term performance as<br />

well as timely deliveries, which helped us to maximise the speed benefits of<br />

offsite construction.”<br />

For details of how Protect products can be incorporated into residential and<br />

commercial builds, please visit the below website, email<br />

info@protectmembranes.com or call 0161 905 5700, quoting ‘Glasdir School.’<br />

www.protectmembranes.com<br />

Images courtesy of Wynne Construction<br />

Feb 2019 <strong>M11</strong><br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!