a.aa MMC M11 52pp Web
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
product news<br />
McAvoy awarded £15 million contract to build hospital wing<br />
Due for completion in Spring 2019, the 6,500m 2 three-storey building will be linked to the existing hospital. The first floor will be fitted out as part of this contract<br />
to accommodate one of the UK’s first purpose-designed Ambulatory Care units. The new wing is being constructed by McAvoy using an advanced offsite<br />
solution to reduce the build programme by half to less than 12 months. This will help Northumbria Healthcare Trust maintain its position as a world leader in<br />
emergency medicine.<br />
Raymond Millar, Construction Director of The McAvoy Group, “We are again<br />
pushing the boundaries of offsite construction. We have developed a hybrid<br />
solution which incorporates both offsite and in-situ building methods and are<br />
maximising fit-out in the factory for this first phase to enhance quality and<br />
reduce disruption to staff and patients.”<br />
www.mcavoygroup.com/healthcare<br />
Hadley Group to exhibit at Midest<br />
Hadley Group will bring its technical expertise to the Midest exhibition<br />
in Lyon later this year. The international show, which runs from 5-8<br />
March at the Eurexpo Centre will cover a number of industrial<br />
subcontracting sectors.<br />
Visitors to Hadley Group’s stand at stall 6N92 will get a first-hand<br />
insight into its comprehensive range of industry-leading products.<br />
Speaking about the company’s participation, Tom Rodenberg, Account<br />
Manager for Overeem, part of Hadley Group, commented: “At this year’s<br />
event we’re really focussed on<br />
promoting our vinepost range, as well<br />
as our custom roll formed products.<br />
Thanks to the patented UltraSTEEL®<br />
process, our steel profiles have a<br />
number of advantages over<br />
alternative options. We can design<br />
bespoke steel profiles to match a<br />
company’s exact requirements.”<br />
www.hadleygroup.com<br />
REHAU Smart Plumbing Manifold shortlisted<br />
in H&V Awards<br />
The finalists for this year’s H&V News Awards have been announced and<br />
REHAU’s Smart Plumbing Manifold has been shortlisted in the Domestic<br />
HVAC Product of the Year - Components & Peripherals category.<br />
The H&V News Awards celebrate and reward excellence to the most<br />
forward-thinking businesses and products and highest achievements<br />
across the building services industry – and after 25 years 2019 sees the<br />
awards celebrating its Silver Anniversary.<br />
REHAU opted to put forward its market leading Smart Plumbing Manifold<br />
due to its innovative design and purpose. The modular, compact product<br />
offers a solution for control of<br />
water distribution, designed for use<br />
in utility cupboards where space is<br />
at a premium. It’s time-saving for<br />
the installer as it only takes a<br />
matter of seconds to install and<br />
provides visual checking to ensure<br />
it is secure and tight.<br />
www.rehau.uk<br />
Time saving new Pattress panel for dryliners<br />
PATTRESS PLUS is the time saving, dust reducing, noise eliminating<br />
new OSB3 panel that dryliners have been dreaming of.<br />
The latest product from innovative timber panel manufactures MEDITE<br />
SMARTPLY will be available to order from 1st February 2019.<br />
Ideal for contractors who construct plasterboard partitions, PATTRESS PLUS<br />
panels feature a continuous recess along one side that is designed to<br />
accommodate ‘C’ studs without the need to cut in slots on site.<br />
This key design feature means that each panel sits flush against the stud<br />
flange, holding steady while you simply screw the other side into place.<br />
The finished result means a massive reduction in dust - as no cutting is<br />
required, drastically reduced noise - due to fewer power tools, and much less<br />
time spent cutting and installing panels which can save hours, if not days, on<br />
big installations.<br />
PATTRESS PLUS panels are available in thicknesses of 15mm or 18mm, widths<br />
of 397mm or 597mm (to fit 400mm and 600mm stud centres), and lengths of<br />
1250mm or 2397mm, in line with leading plasterboard partition specifications.<br />
Head of Marketing and Brand at MEDITE SMARTPLY, Stuart Devoil, comments: “PATTRESS PLUS panels have been created to meet a clear market need.<br />
When speaking to Dryliners and contractors dealing with plasterboard partitions, it became clear that installing pattressing is one big headache. We found that<br />
the current boards they use require cutting on site, which creates large amounts of dust and noise, that in turn creates additional health and safety risk, plus the<br />
use of additional metalwork and fixings adding time and complexity, all resulting in extended installation times. We just wanted to reduce the risk and complexity,<br />
whilst saving them some time into the bargain.<br />
With our expertise in developing innovative timber panel solutions we knew that this latest technology will help tradespeople to create a safer working<br />
environment while saving them time and money. We’ve already trialled the product with one plastering contractor who said he’ll never go back to traditional<br />
panels after using PATTRESS PLUS.”<br />
For more information on PATTRESS PLUS, and to find your nearest stockist, please visit the website.<br />
www.mdfosb.com/en/smartply/products/pattress-plus<br />
30 Feb 2019 <strong>M11</strong>