WADI Sustainability
Sustainable Architecture Research Studio
Sustainable Architecture Research Studio
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
A<br />
WATER<br />
WATER<br />
CENTRAL SPINE<br />
CENTRAL SPINE<br />
FLOW OF WATER OVERLAY OF USES<br />
THE FLOW GRID OF WATER CENTRAL THE SPINE GRID<br />
CENTRAL SPINE PROGRAMS OVERLAY SET OF ALONG USES<br />
PROGRAMS SET ALONG<br />
FALL<br />
MEMBRANE (PAINT FINISH)<br />
GRAVEL<br />
FILTER FABRIC<br />
PROTECTION BOARD<br />
MEMBRANE<br />
DRAINAGE CELL WITH<br />
FILTER FABRIC<br />
AG DRAIN TO FA IN GEO<br />
FABRIC SLEEVE AND GRAVEL<br />
MEMBRANE WITH ROOT<br />
DETERRENT<br />
SCREED WITH 1:80 FALLS<br />
TO RWO<br />
15 X 15 FILLET/BOND<br />
BREAKER (40 x 40 IF SHEET<br />
MEMBRANE)<br />
A.1 REDUCE CRITERIA ASSESSMENT METHOD VALUE NO.<br />
A.1.1 Water Demand Percentage of total water use Water use measured Aim >30% 5<br />
reduction (kL) from Sydney<br />
Water Benchmark:<br />
1. >10%<br />
2. >20%<br />
3. >30%<br />
4. >40%<br />
5. >50%<br />
against Sydney Water<br />
Benchmark:<br />
https://www.sydneywa<br />
ter.com.au/SW/yourbusiness/managingyour-wateruse/benchmarks-forwater-use/index.htm<br />
Achieved =<br />
56.75%<br />
A.1.2 Water Source<br />
Environmental impact of water<br />
supply source:<br />
1. 1 (Desalination)<br />
2. 2 (Surface Water)<br />
3. 3 (Ground Water)<br />
4. 4 (Reclaimed Water)<br />
5. 5 (Rainwater/Fog Capturing)<br />
Trace water supply<br />
system determines<br />
impact level.<br />
Ranking system from:<br />
https://www.iwapublis<br />
hing.com/news/sustain<br />
ability-water-supply<br />
Aim: 3<br />
Achieved =<br />
3.5<br />
Total= 8 / 10 (x10) SCORE = 8<br />
A.2 REUSE CRITERIA ASSESSMENT METHOD VALUE NO.<br />
A.2.1 Waste Water Percentage of total water Total water usage for Aim >80% 5<br />
treatment and recycled (kL) in comparison to site (L)/capacity of<br />
reuse (Grey estimated water used: water treatment Achieved =<br />
Water + Black 1. >40%<br />
system432.9L/Day/38, 100%<br />
Water) 2. >60%<br />
3. >80%<br />
4. >90%<br />
5. >100%<br />
860L<br />
A.2.2 Biogases from<br />
water<br />
treatment<br />
systems<br />
captured and<br />
reused<br />
Percentage of total biogas<br />
used to generate electricity<br />
(Kw/h) in comparison to<br />
estimated electricity<br />
consumption:<br />
1. >5%<br />
2. >10%<br />
3. >15%<br />
4. >20%<br />
5. >25%<br />
Total electricity<br />
consumption for site<br />
(Kw/h)/capacity of<br />
biogas generator.<br />
Total Electricity<br />
consumption per year<br />
= 193947.9 kWh<br />
Electricity produced<br />
from Biogas per year<br />
= 5.685 kWh/Day x<br />
365 = 2075 kWh<br />
Aim >15%<br />
Achieved =<br />
1.06%<br />
Total= 6 / 10 (x10) SCORE = 6<br />
A.3 REPLACE CRITERIA ASSESSMENT METHOD VALUE NO.<br />
A.3.1 Closed<br />
Systems<br />
Aim >75% 4<br />
A.3.2 Beautiful and<br />
Transparent<br />
Percentage of water used on<br />
site in comparison to treated<br />
water returned to closed<br />
system (kL):<br />
1. >25%<br />
2. >50%<br />
3. >75%<br />
4. >85%<br />
5. >100%<br />
Water processes shown<br />
educationally and with clarity.<br />
Industrial feel minimized. Public<br />
Rating system:<br />
1. 1/5<br />
2. 2/5<br />
3. 3/5<br />
4. 4/5<br />
5. 5/5<br />
Estimated total water<br />
use for site (kL)/<br />
total amount of water<br />
dispersed into this<br />
closed system (kL)<br />
Public rating system<br />
via brief questionaire<br />
upon leaving the<br />
pavilion<br />
Achieved =<br />
85% with<br />
ability to<br />
meet 100%<br />
Aim: 3/5<br />
Achieved =<br />
3/5<br />
Total= 7 / 10 (x10) SCORE = 7<br />
3<br />
1<br />
3<br />
Constructed Wetland Detail<br />
Constructed Wetland Detail Section _ 1:10<br />
TOTAL WATER SCORE =<br />
21<br />
/30<br />
3<br />
Drafting 1<br />
1 : 10<br />
Max = 30