WADI Sustainability
Sustainable Architecture Research Studio
Sustainable Architecture Research Studio
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
E<br />
ENVIRONMENTAL IMPACTS<br />
ENVIRONMENTAL<br />
IMPACT<br />
E.1 NOISE CRITERIA ASSESSMENT METHOD<br />
E.1.1 Noise Pollution -<br />
Construction<br />
E.1.2 Noise Pollution -<br />
Internal<br />
Percentage of total<br />
construction time (hrs) that<br />
noise of construction is kept<br />
under 80dB:<br />
1. >50%<br />
2. >60%<br />
3. >70%<br />
4. >80%<br />
5. >90%<br />
Percentage of regularly<br />
occupied primary spaces (m2)<br />
from which noise from all<br />
continually-operating services<br />
is under 20 dB:<br />
1. >70%<br />
2. >75%<br />
3. >80%<br />
4. >85%<br />
5. >90%<br />
Testo sound level<br />
meter:<br />
https://www.testo.com<br />
/en-<br />
AU/products/soundmeter<br />
VALUE<br />
ACHIEVED<br />
Aim >70%<br />
Achieved =<br />
72%<br />
Non-habitable areas Aim >80%<br />
to be positioned within<br />
the design to absorb Achieved =<br />
noise from habitable 83%<br />
areas.<br />
Internal spaces<br />
measured with a<br />
sound pressure<br />
measurement.<br />
NO.<br />
3<br />
3<br />
Total= 6 / 10 (x10) SCORE = 6<br />
E.2 ECOLOGY CRITERIA ASSESSMENT METHOD<br />
E.2.1 Plants Sourcing All plants used are to be UAE Measure of number of<br />
or Australian natives. plants obtained from<br />
Percentage of plants used local sources (ie.<br />
(number of plants/total Dubai area)<br />
number) that are supplied from<br />
local sources:<br />
1. >30%<br />
2. >40%<br />
3. >50%<br />
4. >60%<br />
5. >70%<br />
E.2.2 Plants Impact<br />
Are plants selected an<br />
invasive or pest species in<br />
Dubai?<br />
1. Yes<br />
2. No<br />
Does plant appear on<br />
Global Register of<br />
Introduced and<br />
Invasive Species<br />
(GRIIS).<br />
http://www.griis.org/<br />
VALUE<br />
ACHIEVED<br />
Aim >50%<br />
Achieved =<br />
69%<br />
Aim: No<br />
invasive<br />
Achieved:<br />
No<br />
invasive<br />
NO.<br />
4<br />
Total= 6 / 7 (x10) SCORE = 8.57<br />
2<br />
E.3 ENERGY CRITERIA ASSESSMENT METHOD<br />
E.3.1 Efficiency Building energy use (kWh per Design Builder<br />
m2 per annum):<br />
1. 60%<br />
per year<br />
VALUE<br />
ACHIEVED<br />
Aim<br />
40%<br />
Achieved =<br />
19. 29%<br />
NO.<br />
1<br />
1<br />
Total= 2 / 10 (x10) SCORE = 2<br />
TOTAL ENVIRONMENTAL SCORE =<br />
16.6