Provisions
The progress during 2018 on the new building construction
projects are as follows:
• Teacher Education Building at EduCity Campus
The construction progress was delayed due to disruptions and
interference by the community, as well as subsequent legal
issues with the Main Building Contractor. The contract with
the Building Contractor was terminated. Council gave approval
to follow the procurement process to appoint a new Building
Contractor, which is currently in progress.
• Turn-key projects: 300 bed Residences at EduCity Campus
The 300 bed Residence at EduCity Campus was completed in
December 2015 but could not be utilized due to unavailability
of bulk services infrastructure. These services have become
available and connection is in progress. The perimeter fencing
is being constructed, and while the project is not yet completed,
we expect occupation to be effective from January 2019
• Engineering Building Extension – Additional Floor
The construction progress was delayed due to legal problems
of the Main Building Contractor. The contract was terminated.
Council gave approval to start with the procurement process of
appointing a new Building Contractor.
Council has also taken note of the rate of increase in operational
expenses especially personnel costs that is higher than the
increase in revenue over recent years as well as the decline
in debt collection due to the fees protest wave of 2015/2016.
Council is of the view that an urgent intervention is required if
we are to stabilize the system and the Institution.
Council and Management will continuously be committed to
managing the Vaal University of Technology in such a way that
VUT will be able to successfully execute its mandate for the
foreseeable future.
PROFESSOR IL RENSBURG
ADMINISTRATOR
MR NP MASUDUBELE
EXECUTIVE DIRECTOR: FINANCE (ACTING)
• Life and Physical Sciences Building
The construction is in progress; however this was interrupted by
unappointed local contractors. Completion of the building will
be achieved before the end of 2019.
• Acquisition of Student housing
The tender process is in progress and the acquisition is expected
to be finalised before the end of 2019.
• ICT Infrastructure Upgrade
The tender process will be started in 2019 for phase one and this
first phase of the project is planned to be completed before the
end of 2019.
Conclusion
In general, the financial situation of the University needs
to be improved in order to render its services effectively.
Through sound financial management, planning and reporting,
supported by ethical financial practices, the University can
reverse this financial instability and strive to be a financially
stable and sustainable Institution. The University endeavours to
achieve this through constant monitoring of developments in
the sector and the financial position of the University.