CIMclad: <strong>Formalised</strong> <strong>per<strong>for</strong>mance</strong> <strong>specifications</strong> <strong>for</strong> <strong>rainscreen</strong> <strong>cladding</strong><br />

(The necessity <strong>for</strong> physical testing should not be required if there is<br />

substantial real life successful <strong>per<strong>for</strong>mance</strong> of the <strong>rainscreen</strong> system<br />

proposed – this is acceptable to CWCT. However, project testing may<br />

be demanded by the specifier, in which case some, or all of the<br />

following testing clauses will apply)<br />

NBS Section H92<br />

10 Testing Note<br />

COMPARISON (TYPE) TESTING:<br />

Fabrication and installation of <strong>rainscreen</strong> <strong>cladding</strong> must not commence<br />

until test results and reports showing compliance with this specification<br />

have been submitted to the CA.<br />

(Use this clause when historic data is acceptable)<br />

510<br />

Comparison<br />

Testing<br />

PROJECT TESTING (LABORATORY):<br />

- At an agreed stage in detailed design work arrange <strong>for</strong> laboratory<br />

testing of specimens of <strong>rainscreen</strong> <strong>cladding</strong> and components in<br />

accordance with relevant clauses of this specification.<br />

- Fabrication and installation of <strong>rainscreen</strong> <strong>cladding</strong> must not<br />

commence until test results and reports showing compliance with this<br />

specification have been submitted to the CA.<br />

(Use this clause as alternative to 510)<br />

515<br />

Project Testing<br />

(Laboratory)<br />

PROJECT TESTING (SITE):<br />

- At an agreed stage during preliminary installation on site arrange <strong>for</strong><br />

testing of a section of <strong>rainscreen</strong> <strong>cladding</strong> in accordance with relevant<br />

clauses of this specification.<br />

- Protect building structure, components and finishes from any<br />

damage consequent upon testing.<br />

- Installation of general areas of <strong>rainscreen</strong> <strong>cladding</strong> must not continue<br />

until site test results and reports showing compliance with this<br />

specification have been submitted to the CA.<br />

520<br />

Project Testing<br />

(Site)<br />

TESTING AUTHORITY:<br />

Project testing must be carried out by a United Kingdom Accreditation<br />

Service (UKAS) approved independent laboratory.<br />

530<br />

Testing Authority<br />

TESTING AUTHORITY:<br />

Project testing must be carried out by the <strong>rainscreen</strong> <strong>cladding</strong><br />

manufacturer/contractor and is to be witnessed/certified by ______<br />

(Alternative to 530)<br />

535<br />

July 2001 Page 17 of 17