22.12.2012 Views

Formalised performance specifications for rainscreen cladding

Formalised performance specifications for rainscreen cladding

Formalised performance specifications for rainscreen cladding

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CIMclad: <strong>Formalised</strong> <strong>per<strong>for</strong>mance</strong> <strong>specifications</strong> <strong>for</strong> <strong>rainscreen</strong> <strong>cladding</strong><br />

LARGE TEST SPECIMEN: ______<br />

- Drawing references: ______<br />

- Overall dimensions ______ m high x ______ m wide.<br />

- Features: ______<br />

- Test sequence(s): As clause(s) ______<br />

(This clause <strong>for</strong> complete wall system ie – <strong>rainscreen</strong> system + integral<br />

backing wall)<br />

NBS Section H92 540<br />

Large Test<br />

Specimen<br />

11 Testing (Contd)<br />

SMALL TEST SPECIMEN: ______<br />

- Drawing references: ______<br />

- Overall dimensions ______ m high x ______ m wide.<br />

- Features: ______<br />

- Test sequence(s): As clause(s)______<br />

(This clause applicable to <strong>rainscreen</strong> only system ie – no integral<br />

backing wall)<br />

550<br />

Small Test<br />

Specimen<br />

TEST SEQUENCE: To CWCT ‘Standard <strong>for</strong> testing ventilated<br />

<strong>rainscreen</strong>s’, Table 2 as follows:<br />

- Air permeability: As clause ______<br />

- Weathertightness/water penetration: As clause ______<br />

- Windloading: As clause ______<br />

(Use this clause <strong>for</strong> standard tests)<br />

560<br />

Test Sequence<br />

TEST SEQUENCE: To CWCT ‘Standard <strong>for</strong> testing ventilated<br />

<strong>rainscreen</strong>s’ Table 2 and clauses 3.10 and 3.11 as follows:<br />

- Air permeability: As clause ______<br />

- Weathertightness/water penetration: As clause ______<br />

- Windloading: As clause ______<br />

- Building movement/racking procedure: ______<br />

Repeat test(s): ______<br />

- Thermal cycling regime: ______<br />

Repeat test(s): ______<br />

- Sparge bar: ______<br />

- Hosepipe: ______<br />

- Ultimate strength: ______<br />

(Use this clause <strong>for</strong> standard tests plus choice of other tests)<br />

570<br />

AIR PERMEABILITY TESTS:<br />

- To CWCT ‘Standard <strong>for</strong> testing of ventilated <strong>rainscreen</strong>s’, clauses<br />

3.3 and 3.3.1<br />

- Test pressure: As clause 410.<br />

- Allowable leakage rates: As clause 390.<br />

595<br />

Air Permeability<br />

Tests<br />

Standard Tests<br />

July 2001 Page 18 of 18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!