Annual Report FY 2010-11 - Pipavav Shipyard
Annual Report FY 2010-11 - Pipavav Shipyard
Annual Report FY 2010-11 - Pipavav Shipyard
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Pipavav</strong> Defence and Offshore<br />
Engineering Company Limited<br />
Schedules forming part of the Balance Sheet<br />
Schedule - 5<br />
FIXED ASSETS<br />
Rs in Lacs<br />
Particulars Gross Block Depreciation Net Block<br />
As at<br />
31.03.<strong>2010</strong><br />
As at<br />
31.03.20<strong>11</strong><br />
Upto<br />
31.03.20<strong>11</strong><br />
For the year Deductions /<br />
Adjustments<br />
Upto<br />
31.03.<strong>2010</strong><br />
As on<br />
31.03.20<strong>11</strong><br />
Deductions/<br />
Adjustments<br />
Additions<br />
during the<br />
year<br />
As on<br />
01.04.<strong>2010</strong><br />
A) Tangible Assets<br />
Leasehold Land 22,271.45 60.63 - 22,332.08 1,139.86 1,141.03 - 2,280.89 20,051.19 21,131.59<br />
Buildings 43,082.74 2,245.59 280.74 45,047.59 840.51 1,435.55 2.90 2,273.16 42,774.43 42,242.23<br />
Plant and Machinery 42,839.53 19,958.34 (223.72)** 63,021.59 2,080.96 2,170.91 (5.57) 4,257.44 58,764.15 40,758.57<br />
Furniture and Fixtures 394.20 159.55 (48.59)** 602.34 200.87 30.62 5.69 225.80 376.54 193.33<br />
Vehicles 418.07 81.07 - 499.14 96.97 46.20 - 143.17 355.97 321.10<br />
B) Intangible Assets<br />
Softwares* 232.83 44.83 - 277.66 51.51 48.95 - 100.46 177.20 181.32<br />
Total 109,238.82 22,550.01 8.43 131,780.40 4,410.68 4,873.26 3.02 9,280.92 122,499.48 104,828.14<br />
Previous Year 4,957.09 104,289.88 (8.15) 109,238.82 758.23 3,654.73 (2.28) 4,410.68 104,828.14<br />
Capital Work In Progress 147,517.99 138,838.21<br />
* Other than Internally Generated<br />
Notes:<br />
������������<br />
56<br />
1) The Leasehold Land represents the lease premium if any paid and the cost incurred for reclaiming and development of the Land.<br />
As at 31.03.20<strong>11</strong> As at 31.03.<strong>2010</strong><br />
2) Capital Work in Progress includes<br />
- Advances on Capital Account 153.20 581.69<br />
- Material at site 582.27 1,246.26<br />
- Buildings under construction 750.81 1,<strong>11</strong>3.79<br />
- Plant and Machinery under installation 102,718.18 97,579.98<br />
- Pre-operative Expenses 43,313.53 38,316.49<br />
147,517.99 138,838.21<br />
3) Buildings and Plant & machineries are constructed /installed on leasehold land.<br />
4) ** Represents re-classification of certain Fixed Assets.