<strong>Annual</strong> <strong>Report</strong> <strong>2010</strong>-<strong>11</strong><br />
Schedules forming part of the Profit and Loss Account<br />
Particulars For the year ended<br />
Rs in Lacs<br />
For the year ended<br />
Schedule - 13<br />
INCOME FROM OPERATIONS<br />
March 31, 20<strong>11</strong> March 31, <strong>2010</strong><br />
Shipbuilding and Ship Repairs 51,942.69 44,529.58<br />
Subsidy on Shipbuilding * 7,494.13 8,814.91<br />
Trade Sales<br />
*(Refer note no. 8 of Schedule 22)<br />
26,556.26 9,593.77<br />
Total<br />
Schedule - 14<br />
OTHER INCOME<br />
85,993.08 62,938.26<br />
Interest Income<br />
{Tax Deducted at Source Rs. 397.95 lacs<br />
(Previous Year: Rs. 455.27 lacs)}<br />
3,676.33 3,779.78<br />
Project consultancy 300.00 -<br />
Profit on Sale of Current Investments (Net) 326.71 392.80<br />
Dividend on Current Investments 337.88 8.31<br />
Foreign Exchange difference (Net) 1,227.30 2,531.62<br />
Liability No Longer Required (Written Back) 413.72 -<br />
Miscellaneous Income 54.57 38.15<br />
Total<br />
Schedule - 15<br />
INCREASE AND (DECREASE) IN INVENTORIES<br />
Closing Balance<br />
6,336.51 6,750.66<br />
Scrap 546.08 221.98<br />
Work in progress - 2,559.16<br />
Less :- Opening Balance<br />
546.08 2,781.14<br />
Scrap 221.98 18.61<br />
Work in progress 2,559.16 14,056.83<br />
2,781.14 14,075.44<br />
Increase / (Decrease) in Inventories<br />
Schedule - 16<br />
RAW MATERIALS CONSUMED<br />
(2,235.06) (<strong>11</strong>,294.30)<br />
Opening Stock of Raw Materials 10,123.40 17,753.86<br />
Add :- Purchases 41,647.37 9,301.45<br />
Less :- Closing Stock of Raw Materials 23,487.57 10,123.40<br />
Total<br />
Schedule - 17<br />
MANUFACTURING EXPENSES<br />
28,283.20 16,931.91<br />
Stores, Spares and Consumables 2,073.93 1,166.29<br />
Site Rent 272.72 212.22<br />
Power Fuel and Water 1,496.37 894.64<br />
Labour Charges 4,401.63 1,545.96<br />
Design and Drawing Fees 539.48 76.99<br />
Insurance 184.53 19.05<br />
Repairs and Maintenance - Plant and Machinery 739.95 180.00<br />
Equipment Hire Charges 587.02 285.28<br />
Infrastructure Facility Charges 940.00 470.00<br />
Other Manufacturing Expenses 908.21 94.98<br />
Cost Estimated for Revenue Recognised (3,028.47) <strong>11</strong>,400.78<br />
�������������<br />
(Refer note no. 19 of Schedule 22)<br />
Total 9,<strong>11</strong>5.37 16,346.19<br />
61