Description

Chiller System

Menara Weld (Office)

Tower Chiller Plant

The Weld (Retail Mall)

Podium Chiller Plant

Old Chiller Plant (constant

speed water-cooled screw

chillers) Tonnage &

Configuration

System Efficiency (kW/ton)

1.90

1.90

New Chiller Plant

(Variable speed watercooled

screw chillers)

Tonnage & Configuration

Audited Best System

Efficiency (kW/ton)

0.65

significantly.

In addition to chiller replacement, the retrofitting exercise

also involved the replacement of chilled water pumps and

condenser water pumps to highly efficient variable speed

pumps. The cooling towers were also replaced and fitted with

variable speed cooling tower fans. The entire chiller plant was

converted into a variable-primary-flow configuration controlled

by a dedicated Chiller Management System. Further, all Air

Handling Units (AHUs) control valves were replaced with Pressure

Independent Balancing Control Valves (PIBCV) and all damaged

Variable Frequency Drives for the AHUs were also replaced.

Moreover, the carpark lights have been changed to the more

energy efficient LED light prior to the chiller replacement exercise.

With all the energy conservation measures implemented, the

annual electricity saving is 3,910,239kWh/year as reflected on the

electricity bills, which is equivalent to a 38.70% reduction. The

Return of Investment (ROI) is below four years.

PRIMETECH Engineers Sdn Bhd (Co. No. 211469-P)

19B & 21B, Jalan 17/45, 46400 Petaling Jaya, Selangor, Malaysia.

Tel: +603-7958 3655

Fax: +603-7956 3660

E-mail: primetech19@gmail.com

Nov-Dec 2020 | www.b-i.biz 29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!