PRAXISBEISPIEL<br />

INDUSTRIE-/<br />

GEWERBEBAU<br />

SANIERUNG EINES CONTAINERTERMINALS<br />

PRACTICAL EXAMPLE<br />

INDUSTRIAL<br />

CONSTRUCTION<br />

REHABILITATION OF A CONTAINER TERMINAL


2<br />

<strong>InfraCrete</strong> GmbH<br />

Hägnistrasse 22<br />

CH-8702 Zollikon<br />

T +41 (0)44 388 92 21<br />

E info@infracrete.com<br />

Sämtliche Inhalte, Texte, Grafiken und Illustrationen sind urheberrechtlich geschützt und dürfen weder ganz noch<br />

auszugsweise kopiert, verändert, vervielfältigt oder veröffentlicht werden. Die Marke <strong>InfraCrete</strong>® ist eine<br />

eingetragene Marke der <strong>InfraCrete</strong> GmbH.<br />

All content, text, graphics and illustrations are protected by copyright and may not be copied, modified,<br />

reproduced or published in whole or in part. The <strong>InfraCrete</strong>® brand is a registered trademark of <strong>InfraCrete</strong> GmbH.<br />

Copyright <strong>InfraCrete</strong> GmbH, 2011-2024


3


4<br />

AUSGANGSLAGE │ STARTING SITUATION<br />

Ein mehr als 50.000 Quadratmeter großer Abschnitt eines in<br />

einem westeuropäischen Seehafen gelegenen<br />

Containerterminals musste saniert werden. Die Trag- und<br />

Verschleißschicht war durch eine extensive Nutzung mit<br />

Reach-Stackern und Sattelzügen stark in Mitleidenschaft<br />

gezogen worden. Umwelt- und Witterungseinflüsse hatten<br />

der Trag- und Verschleißschicht zusätzlich zugesetzt. Daraus<br />

resultierte ein Sicherheitsrisiko für den Güterumschlag.<br />

Da das Containerterminal eine wesentliche Rolle bei der<br />

Güterversorgung in dieser Region einnahm, war die<br />

Voraussetzung für die Sanierung, dass eine solche während<br />

des laufenden Betriebes stattfindet und den Güterumschlag<br />

dabei nicht beeinträchtigt.<br />

Die vorhandene Trag- und Deckschicht wurde im Rahmen der<br />

umfassenden Sanierung unter Verwendung der <strong>InfraCrete</strong>®-<br />

Technologie in eine kombinierte Trag- und Frostschutzschicht<br />

umgewandelt und mit einer dünnen Deck- /<br />

Verschleißschicht aus Asphalt versehen.<br />

A section of more than 50,000 square meters of a container<br />

terminal located in a Western European seaport had to be<br />

rehabilitated. The base and wearing course had been severely<br />

affected by extensive use 24/7 with reach stackers and semitrucks.<br />

Environmental and weather influences had additionally<br />

affected the base and wearing course. This resulted in a safety<br />

risk for cargo handling.<br />

Since the container terminal played an essential role in the<br />

supply of goods to the region, the prerequisite for the<br />

rehabilitation was that it could take place during ongoing<br />

operations and would not impair cargo handling in any way.<br />

Therefore, as part of the comprehensive rehabilitation, the<br />

existing base and wearing courses were converted into a<br />

combined base and anti frost course using <strong>InfraCrete</strong>®<br />

technology and provided with a thin top / wearing course of<br />

asphalt.<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


5<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


6<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


7<br />

VORBEREITUNGSARBEITEN │ PREPARATION WORKS<br />

Im einem ersten Schritt wurde die vorhandene Trag- und<br />

Verschleißschicht durchgefräst, um ein homogenes<br />

Baustoffgemisch zu erhalten, das gleichsam als<br />

Ausgangsmaterial für die bevorstehende Umwandlung in<br />

eine kombinierte Trag- und Frostschutzschicht dienen sollte.<br />

Wie bei diesem anerkannten Bauverfahren üblich, war weder<br />

die Exkavation und Entsorgung des vor Ort befindlichen alten<br />

Materials notwendig, noch die Wiederauffüllung mit neuem<br />

Material. Stattdessen wurde das bereits vorhandene<br />

Material homogen gebrochen und wieder verwendet. Dies<br />

gilt insbesondere auch für die alte Deck- und<br />

Verschleißschicht aus Asphalt, die ebenfalls vollumfänglich<br />

einer Wiederverwendung zugeführt wurde.<br />

In a first step, the existing base and wearing course was milled<br />

through to obtain a homogeneous mixture of construction<br />

materials that would serve as the base material for the<br />

upcoming conversion into a combined base and anti-frost<br />

layer.<br />

As is customary with this accepted construction method,<br />

there was no need to excavate and dispose of the old material<br />

on site, nor was there any need to backfill with new material.<br />

Instead, the existing material was homogeneously crushed<br />

and reused. This also applies in particular to the old surface<br />

and wearing course of asphalt, which was also fully reused.<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


8<br />

BINDEMITTELAUSTRAG │ BINDER DISCHARGE<br />

Die Sanierung erfolgte im Wege der In-Situ-<br />

Bodenverfestigung durch Einfräsen von Bindemittel in das<br />

vorbereitete Ausgangsmaterial.<br />

Das verwendete Bindemittel bestand aus 98 M-% Zement,<br />

Typ CEM I 42.5, und 2 M-% <strong>InfraCrete</strong>®.<br />

Die zwei Produkte wurden separat ausgetragen. Der Zement<br />

wurde mit einer großen Streueinheit und das Spezialadditiv<br />

<strong>InfraCrete</strong>® mit einer Streueinheit mit Mindermengenstreuwerk<br />

ausgebracht.<br />

Die Gesamtausstreumenge betrug 54 Kilogramm pro<br />

Quadratmeter. Dies entspricht 53 Kilogramm Zement und 1<br />

Kilogramm <strong>InfraCrete</strong>® pro Quadratmeter.<br />

The rehabilitation was carried out by in situ soil consolidation<br />

/ stabilization by milling binder into the prepared base<br />

material.<br />

The binder used consisted of 98 M% cement, type CEM I 42.5,<br />

and 2 M% <strong>InfraCrete</strong>®.<br />

The two products were discharged separately. The cement<br />

was spread with a large spreading unit and the special<br />

additive <strong>InfraCrete</strong>® with a spreading unit with a low-volume<br />

spreader.<br />

The total spread rate was 54 kilograms per square meter. This<br />

corresponds to 53 kilograms of cement and 1 kilograms of<br />

<strong>InfraCrete</strong>® per square meter.<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


9<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


10<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


11<br />

FRÄSARBEITEN │ MILLING WORK<br />

Das ausgestreute Bindemittel wurde mit einer Bodenfräse in<br />

nur einem einzigen Arbeitsgang auf eine Tiefe von 30<br />

Zentimetern in das vorhandene Ausgangsmaterial eingefräst.<br />

Die erforderliche Mächtigkeit der Tragschicht von 30<br />

Zentimetern wurde zuvor von einem bodenmechanischen<br />

Labor im Rahmen einer Rezepturermittlung bestimmt.<br />

Vor und während des Fräsvorgangs wurde darauf geachtet,<br />

dass der ebenfalls im Labor zuvor ermittelte<br />

Einbauwassergehalt, der für die optimale Hydratation<br />

erforderlich ist, eingehalten wird.<br />

Es wurde eine Einbauzeit von maximal 90 Minuten<br />

festgelegt, da das Spezialadditiv <strong>InfraCrete</strong>® unter anderem<br />

den Hydratationsprozess beschleunigt und damit auch für<br />

eine gewollt erhöhte Frühfestigkeit sorgt.<br />

The spread binder was milled into the existing base material<br />

to a depth of 30 centimeters in a single pass using a rotary<br />

tiller.<br />

The required thickness of the base course of 30 centimeters<br />

was previously determined by a soil mechanics laboratory as<br />

part of the recipe determination.<br />

Before and during the milling process, care was taken to<br />

ensure that the installation water content required for<br />

optimum hydration, which had also been previously<br />

determined in the laboratory, was maintained.<br />

A maximum installation time of 90 minutes was specified,<br />

since the special additive <strong>InfraCrete</strong>® accelerates the<br />

hydration process, among other things, and thus also ensures<br />

a deliberately increased early strength.<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


12<br />

VERDICHTUNG │ COMPACTING<br />

Das Fräsgut wurde unmittelbar nach dem Fräsvorgang mit<br />

einem lasergesteuerten Grader nivelliert und mit einer<br />

Stahlmantelwalze und einer Gummiradwalze verdichtet, um<br />

das vorgegebene Verdichtungsmaß zu gewährleisten.<br />

Die Tragschicht war damit für die Installation der Deckschicht<br />

aus Asphalt vorbereitet. Alternativ wäre auch eine<br />

Deckschicht aus Pflasterung oder Chipseal möglich gewesen,<br />

ebenso die der Verzicht auf jegliche Deckschicht und der<br />

Betrieb der Tragschicht als sog. naturnahe Oberfläche.<br />

Immediately after the milling operation, the milled material<br />

was leveled with a laser-controlled grader and compacted<br />

with a steel jacket roller and a pneumatic tired roller to<br />

ensure the specified degree of compaction.<br />

The base course was thus prepared for the installation of the<br />

asphalt wearing course. Alternatively, a paving or chipseal<br />

surface would have been possible, as well as the omission of<br />

any surface course and the operation of the base course as a<br />

so-called near-natural surface.<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


13<br />

ERGEBNIS │ RESULT<br />

> 120 to mögliche Achslast (Mindestvorgabe: 120 to)<br />

> 265.000 lb possible axle load (min. requirement: 265.000 lb)<br />

5.000 m² Tagesleistung<br />

5.000 m² daily output<br />

Keine Beeinträchtigung des Terminalbetriebes<br />

No impairment of terminal operations<br />

12 Stunden bis zur Befahrbarkeit<br />

12 hours to trafficability<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


14<br />

12 JAHRE SPÄTER │ 12 YEARS LATER<br />

Fotos zeigen den Zustand der Fläche im Februar 2024. Die Fläche ist 12 Jahre nach Erstellung und trotz 24/7-Nutzung unter starken<br />

klimatischen Einflüssen in Skandinavien in einem einwandfreien Zustand.<br />

Photos showing the condition of the site in February 2024. 12 years after construction and despite 24/7 use under strong climatic<br />

influences in Scandinavia, the site is in perfect condition.<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


15<br />

12 JAHRE SPÄTER │ 12 YEARS LATER<br />

Fotos zeigen den Zustand der Fläche im Februar 2024. Die Fläche ist 12 Jahre nach Erstellung und trotz 24/7-Nutzung unter starken<br />

klimatischen Einflüssen in Skandinavien in einem einwandfreien Zustand.<br />

Photos showing the condition of the site in February 2024. 12 years after construction and despite 24/7 use under strong climatic<br />

influences in Scandinavia, the site is in perfect condition.<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


16<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


17<br />

Weitere Informationen:<br />

www.infracrete.com<br />

www.instagram.com/infracrete


EAN: 7629999062092 │ GPC: 10008045 │ TARIC: 38244000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!