12.09.2021 Views

August 2021 Monthly Report

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Red Oak<br />

Fire Rescue<br />

<strong>Monthly</strong> <strong>Report</strong><br />

<strong>August</strong> <strong>2021</strong>


OPERATIONAL STATISTICS - FIRE OPERATIONS<br />

FIRE OPERATIONS SUMMARY:<br />

The average total response time for <strong>August</strong> for fire apparatus was 6:16.<br />

Approximately 19.59% of the total call volume represents overlapping calls<br />

requiring units to respond to areas outside their base districts, which inevitably<br />

results in increased response times. Total Fire & EMS calls for service for the month<br />

was 290 with a total of 370 apparatus responses. For the month of <strong>August</strong>, the<br />

ratio of EMS incidents to Fire incidents is 67% to 33% respectively.<br />

For the month of <strong>August</strong>, we averaged 3.1 fire calls per day and 6.3 EMS calls per<br />

day for an overall daily average of 9.4 calls per day.<br />

Full Response = 3 Engines, 1 Truck, 1 Chief and 1 Ambulance (12-15 people)<br />

Fires that do not require a full response, were manageable by either the initial arriving<br />

company, a fire suppression system or the fire was out before arrival.<br />

Percentage of Total Call Volume by Type:<br />

EMS 67%<br />

Fire 33%<br />

Fire<br />

EMS<br />

135<br />

67<br />

59<br />

20<br />

9<br />

0<br />

City ESD #4 Mutual Aid Given<br />

There were 57 overlapping incidents for the month of <strong>August</strong>.<br />

Overlapping incidents create gaps in coverage and greater response times.<br />

Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />

Page 2


Incident Breakdown - <strong>August</strong><br />

Calls City ESD #4 Other District Total<br />

111 Building Fire 1 1<br />

113 Cooking Fire, Confined to container 1 1<br />

131 Passenger Vehicle Fire 1 1<br />

321 EMS call, excluding vehicle accident with injury 128 59 187<br />

322 Motor vehicle accident with injuries 7 7<br />

324 Motor vehicle accident with no injuries 8 1 9<br />

353 Removal of victim(s) from stalled elevator 2 2<br />

412 Gas leak (natural gas or LPG) 1 1<br />

440 Electrical wiring/equipment problem, other 1 1<br />

444 Power line down 1 1 2<br />

445 Arching, shorted electrical equipment 1 1<br />

511 Lock-out 3 1 4<br />

531 Smoke or odor removal 3 1 4<br />

550 Public service assistance, other 1 1<br />

553 Public Service 10 6 16<br />

554 Assist invalid 1 1<br />

571 Cover assignment, standby, moveup 4 4<br />

600 Good intent call, other 1 1<br />

611 Dispatched & cancelled en route 9 6 5 20<br />

622 No incident found on arrival at dispatch address 2 2<br />

631 Authorized controlled burning 2 2 4<br />

651 Smoke scare, odor of smoke 1 1<br />

700 False alarm or false call, other 9 9<br />

730 System malfunction, other 1 1<br />

731 Sprinkler activation due to malfunction 1 1<br />

733 Smoke detector activation due to malfunction 1 1 2<br />

736 CO detector activation due to malfunction 1 1<br />

740 Unintentional transmission of alarm, other 2 2<br />

743 Smoke detector activation, no fire – unintentional 2 2<br />

900 Special type of incident, other 1 1<br />

<strong>August</strong> TOTALS 202 79 9 290<br />

Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />

Page 3


Incident Breakdown - <strong>August</strong><br />

NFPA 1710 COMPLIANCE MEASURES<br />

A Shift B Shift C Shift<br />

Average Reaction Time - Station 1 1:25 1:15 1:25<br />

PRIOR<br />

MONTH<br />

CURRENT<br />

MONTH<br />

FREQ TARGET<br />

≤ 80 Seconds<br />

1:33 1:23 M<br />

Average Reaction Time - Station 2 1:48 1:21 1:31 1:34 1:34 M ≤ 80 Seconds<br />

Average Response Time - Station 1 5:34 5:35 5:23 5:53 5:30 M ≤ 5:20 Minutes<br />

Average Response Time - Station 2 7:22 6:56 7:20 7:01 7:13 M ≤ 5:20 Minutes<br />

Fractile Time at 90% of Fire Responses 14:04 12:58 M ≤ 5:20 Minutes<br />

Fractile Time at 90% of Structure Fire Responses N/A 21:50 M ≤ 9:20 Minutes<br />

Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />

Page 4


OPERATIONAL STATISTICS – MUTUAL AID<br />

Mutual Aid By Department<br />

We gave 8 Mutual Aid responses in <strong>August</strong> to Ferris, Glenn Heights,<br />

Lancaster, Palmer and Waxahachie.<br />

In <strong>August</strong> we had 7 calls which we received Mutual Aid responses from<br />

Desoto, Glenn Heights, Lancaster, Ovilla, and Waxahachie.<br />

Mutual Aid Given<br />

Ferris, 1<br />

Waxahachie, 2<br />

Glenn Heights, 1<br />

Palmer, 1<br />

Lancaster, 3<br />

Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> –<strong>August</strong> <strong>2021</strong><br />

Page 5


OPERATIONAL STATISTICS - FIRE OPERATIONS<br />

Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />

Page 6


OPERATIONAL STATISTICS – EMS July<br />

Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />

Page 7


DEPARTMENT FLEET<br />

Truck<br />

Year Model<br />

Total<br />

Mileage<br />

Fuel Expense<br />

- <strong>August</strong><br />

Total<br />

Hours<br />

<strong>August</strong><br />

Maintenance<br />

Expense<br />

FY21<br />

Year-To-Date<br />

Maintenance<br />

Expense<br />

Emergency<br />

Responses<br />

<strong>August</strong><br />

T-181 2013 27,424 $347.25 3,114 $47,490.41 $50,365.27 20<br />

Engine<br />

Year Model<br />

Total<br />

Mileage<br />

Fuel Expense<br />

- <strong>August</strong><br />

Total<br />

Hours<br />

<strong>August</strong><br />

Maintenance<br />

Expense<br />

FY21<br />

Year-To-Date<br />

Maintenance<br />

Expense<br />

Emergency<br />

Responses<br />

<strong>August</strong><br />

E-181 2012 72,657 $551.87 7,732 - $49,655.35 141<br />

E-182 2016 47,661 $912.04 3,969 - $29,592.91 149<br />

E-183 2007 130,934 $190.92 10,630 $2,139.15 $7,201.94 -<br />

Brush<br />

Year Model<br />

Total<br />

Mileage<br />

Fuel Expense<br />

- <strong>August</strong><br />

Total<br />

Hours<br />

<strong>August</strong><br />

Maintenance<br />

Expense<br />

FY21<br />

Year-To-Date<br />

Maintenance<br />

Expense<br />

Emergency<br />

Responses<br />

<strong>August</strong><br />

B-181 2009 26,925 - N/A - $2,974.79 -<br />

B-182 2004 52,418 $83.80 N/A $431.65 $4,602.15 3<br />

E3-67 <strong>2021</strong> 12,447 - N/A $322.22 $343.72 -<br />

Rescue<br />

Year Model<br />

Total<br />

Mileage<br />

Fuel Expense<br />

- <strong>August</strong><br />

Total<br />

Hours<br />

<strong>August</strong><br />

Maintenance<br />

Expense<br />

FY21<br />

Year-To-Date<br />

Maintenance<br />

Expense<br />

Emergency<br />

Responses<br />

<strong>August</strong><br />

R-181 2019 2,062 - N/A - $27.00 -<br />

Chief<br />

Vehicles<br />

Year Model<br />

Total<br />

Mileage<br />

Fuel Expense<br />

- <strong>August</strong><br />

Total<br />

Hours<br />

<strong>August</strong><br />

Maintenance<br />

Expense<br />

FY21<br />

Year-To-Date<br />

Maintenance<br />

Expense<br />

Emergency<br />

Responses<br />

<strong>August</strong><br />

C-181 2017 39,533 $240.97 N/A $15.00 $277.67 2<br />

FM-183 <strong>2021</strong> 28,400 $213.79 N/A - $247.69 -<br />

BC-181 2016 46,367 $437.11 N/A - $901.40 55<br />

Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />

Page 8


OPERATIONAL STATISTICS -July<br />

PRIOR CURRENT<br />

COMMUNITY RISK REDUCTION DIVISION<br />

FREQ TARGET<br />

MONTH MONTH<br />

Fire Casualties—Civilian 0 0 M 0<br />

Fires Confined to Room of Origin 1 1 M 65%<br />

CO Inspections 2 3 M 100%<br />

Fire Inspections/Re-Inspections 36 32 A 267<br />

Fire Protection Plans Reviewed 1 3 M 100%<br />

Pre-Plans for High Hazard Target Facilities 0 0 Q 100%<br />

High Hazard Fire Inspections Complete 0 0 A 62<br />

Company Tours of High Hazard Target Facilities 0 0 A 90%<br />

Fire Safety Classes/Public Education 1 1 A 40<br />

Public Safety Announcements 8 5 M 12<br />

Cert/Occupancy Generated: $225.00<br />

Plan Reviews Generated: $2,830.76<br />

Foster Home Inspections: $150.00<br />

Operational Permits: $400.00<br />

Total Money Generated: $3,605.76<br />

Year to Date, CRRD has generated $153,281.90 in inspections, plan reviews and<br />

tests.<br />

Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – July <strong>2021</strong><br />

Page 9


OPERATIONAL STATISTICS -<strong>August</strong><br />

PRIOR CURRENT<br />

COMMUNITY RISK REDUCTION DIVISION<br />

FREQ TARGET<br />

MONTH MONTH<br />

Fire Casualties—Civilian 0 0 M 0<br />

Fires Confined to Room of Origin 1 1 M 65%<br />

CO Inspections 3 1 M 100%<br />

Fire Inspections/Re-Inspections 32 21 A 267<br />

Fire Protection Plans Reviewed 3 2 M 100%<br />

Pre-Plans for High Hazard Target Facilities 0 0 Q 100%<br />

High Hazard Fire Inspections Complete 0 0 A 62<br />

Company Tours of High Hazard Target Facilities 0 0 A 90%<br />

Fire Safety Classes/Public Education 1 0 A 40<br />

Public Safety Announcements 5 5 M 12<br />

Cert/Occupancy Generated: $75.00<br />

Plan Reviews Generated: $1,943.26<br />

Foster Home Inspections: $50.00<br />

Operational Permits: $200.00<br />

Flow Test: $100.00<br />

Total Money Generated: $2,368.26<br />

Year to Date, CRRD has generated $156,196.16 in inspections, plan reviews and<br />

tests.<br />

Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />

Page 10


OPERATIONAL STATISTICS – TRAINING<br />

Fire Training For Operations Division - <strong>August</strong><br />

Station 1 Station 2<br />

239<br />

221<br />

162<br />

183<br />

113<br />

108<br />

A Shift B Shift C Shift<br />

Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />

Page 11


338<br />

HOURS ON<br />

CALLS<br />

118 Hours<br />

Apparatus<br />

Duties<br />

(Includes<br />

maintenance,<br />

cleaning, inventory,<br />

inspections, etc.)<br />

32 Hours<br />

Various<br />

Office Work<br />

(Includes <strong>Report</strong><br />

entry, data entry,<br />

career<br />

advancement<br />

study, meetings)<br />

53 Hours<br />

Physical<br />

Fitness<br />

1078 Total<br />

Training<br />

Hours<br />

20 HOURS<br />

INSPECTIONS<br />

14 Hours Public<br />

Education &<br />

Special Events<br />

Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />

Page 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!