August 2021 Monthly Report
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Red Oak<br />
Fire Rescue<br />
<strong>Monthly</strong> <strong>Report</strong><br />
<strong>August</strong> <strong>2021</strong>
OPERATIONAL STATISTICS - FIRE OPERATIONS<br />
FIRE OPERATIONS SUMMARY:<br />
The average total response time for <strong>August</strong> for fire apparatus was 6:16.<br />
Approximately 19.59% of the total call volume represents overlapping calls<br />
requiring units to respond to areas outside their base districts, which inevitably<br />
results in increased response times. Total Fire & EMS calls for service for the month<br />
was 290 with a total of 370 apparatus responses. For the month of <strong>August</strong>, the<br />
ratio of EMS incidents to Fire incidents is 67% to 33% respectively.<br />
For the month of <strong>August</strong>, we averaged 3.1 fire calls per day and 6.3 EMS calls per<br />
day for an overall daily average of 9.4 calls per day.<br />
Full Response = 3 Engines, 1 Truck, 1 Chief and 1 Ambulance (12-15 people)<br />
Fires that do not require a full response, were manageable by either the initial arriving<br />
company, a fire suppression system or the fire was out before arrival.<br />
Percentage of Total Call Volume by Type:<br />
EMS 67%<br />
Fire 33%<br />
Fire<br />
EMS<br />
135<br />
67<br />
59<br />
20<br />
9<br />
0<br />
City ESD #4 Mutual Aid Given<br />
There were 57 overlapping incidents for the month of <strong>August</strong>.<br />
Overlapping incidents create gaps in coverage and greater response times.<br />
Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />
Page 2
Incident Breakdown - <strong>August</strong><br />
Calls City ESD #4 Other District Total<br />
111 Building Fire 1 1<br />
113 Cooking Fire, Confined to container 1 1<br />
131 Passenger Vehicle Fire 1 1<br />
321 EMS call, excluding vehicle accident with injury 128 59 187<br />
322 Motor vehicle accident with injuries 7 7<br />
324 Motor vehicle accident with no injuries 8 1 9<br />
353 Removal of victim(s) from stalled elevator 2 2<br />
412 Gas leak (natural gas or LPG) 1 1<br />
440 Electrical wiring/equipment problem, other 1 1<br />
444 Power line down 1 1 2<br />
445 Arching, shorted electrical equipment 1 1<br />
511 Lock-out 3 1 4<br />
531 Smoke or odor removal 3 1 4<br />
550 Public service assistance, other 1 1<br />
553 Public Service 10 6 16<br />
554 Assist invalid 1 1<br />
571 Cover assignment, standby, moveup 4 4<br />
600 Good intent call, other 1 1<br />
611 Dispatched & cancelled en route 9 6 5 20<br />
622 No incident found on arrival at dispatch address 2 2<br />
631 Authorized controlled burning 2 2 4<br />
651 Smoke scare, odor of smoke 1 1<br />
700 False alarm or false call, other 9 9<br />
730 System malfunction, other 1 1<br />
731 Sprinkler activation due to malfunction 1 1<br />
733 Smoke detector activation due to malfunction 1 1 2<br />
736 CO detector activation due to malfunction 1 1<br />
740 Unintentional transmission of alarm, other 2 2<br />
743 Smoke detector activation, no fire – unintentional 2 2<br />
900 Special type of incident, other 1 1<br />
<strong>August</strong> TOTALS 202 79 9 290<br />
Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />
Page 3
Incident Breakdown - <strong>August</strong><br />
NFPA 1710 COMPLIANCE MEASURES<br />
A Shift B Shift C Shift<br />
Average Reaction Time - Station 1 1:25 1:15 1:25<br />
PRIOR<br />
MONTH<br />
CURRENT<br />
MONTH<br />
FREQ TARGET<br />
≤ 80 Seconds<br />
1:33 1:23 M<br />
Average Reaction Time - Station 2 1:48 1:21 1:31 1:34 1:34 M ≤ 80 Seconds<br />
Average Response Time - Station 1 5:34 5:35 5:23 5:53 5:30 M ≤ 5:20 Minutes<br />
Average Response Time - Station 2 7:22 6:56 7:20 7:01 7:13 M ≤ 5:20 Minutes<br />
Fractile Time at 90% of Fire Responses 14:04 12:58 M ≤ 5:20 Minutes<br />
Fractile Time at 90% of Structure Fire Responses N/A 21:50 M ≤ 9:20 Minutes<br />
Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />
Page 4
OPERATIONAL STATISTICS – MUTUAL AID<br />
Mutual Aid By Department<br />
We gave 8 Mutual Aid responses in <strong>August</strong> to Ferris, Glenn Heights,<br />
Lancaster, Palmer and Waxahachie.<br />
In <strong>August</strong> we had 7 calls which we received Mutual Aid responses from<br />
Desoto, Glenn Heights, Lancaster, Ovilla, and Waxahachie.<br />
Mutual Aid Given<br />
Ferris, 1<br />
Waxahachie, 2<br />
Glenn Heights, 1<br />
Palmer, 1<br />
Lancaster, 3<br />
Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> –<strong>August</strong> <strong>2021</strong><br />
Page 5
OPERATIONAL STATISTICS - FIRE OPERATIONS<br />
Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />
Page 6
OPERATIONAL STATISTICS – EMS July<br />
Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />
Page 7
DEPARTMENT FLEET<br />
Truck<br />
Year Model<br />
Total<br />
Mileage<br />
Fuel Expense<br />
- <strong>August</strong><br />
Total<br />
Hours<br />
<strong>August</strong><br />
Maintenance<br />
Expense<br />
FY21<br />
Year-To-Date<br />
Maintenance<br />
Expense<br />
Emergency<br />
Responses<br />
<strong>August</strong><br />
T-181 2013 27,424 $347.25 3,114 $47,490.41 $50,365.27 20<br />
Engine<br />
Year Model<br />
Total<br />
Mileage<br />
Fuel Expense<br />
- <strong>August</strong><br />
Total<br />
Hours<br />
<strong>August</strong><br />
Maintenance<br />
Expense<br />
FY21<br />
Year-To-Date<br />
Maintenance<br />
Expense<br />
Emergency<br />
Responses<br />
<strong>August</strong><br />
E-181 2012 72,657 $551.87 7,732 - $49,655.35 141<br />
E-182 2016 47,661 $912.04 3,969 - $29,592.91 149<br />
E-183 2007 130,934 $190.92 10,630 $2,139.15 $7,201.94 -<br />
Brush<br />
Year Model<br />
Total<br />
Mileage<br />
Fuel Expense<br />
- <strong>August</strong><br />
Total<br />
Hours<br />
<strong>August</strong><br />
Maintenance<br />
Expense<br />
FY21<br />
Year-To-Date<br />
Maintenance<br />
Expense<br />
Emergency<br />
Responses<br />
<strong>August</strong><br />
B-181 2009 26,925 - N/A - $2,974.79 -<br />
B-182 2004 52,418 $83.80 N/A $431.65 $4,602.15 3<br />
E3-67 <strong>2021</strong> 12,447 - N/A $322.22 $343.72 -<br />
Rescue<br />
Year Model<br />
Total<br />
Mileage<br />
Fuel Expense<br />
- <strong>August</strong><br />
Total<br />
Hours<br />
<strong>August</strong><br />
Maintenance<br />
Expense<br />
FY21<br />
Year-To-Date<br />
Maintenance<br />
Expense<br />
Emergency<br />
Responses<br />
<strong>August</strong><br />
R-181 2019 2,062 - N/A - $27.00 -<br />
Chief<br />
Vehicles<br />
Year Model<br />
Total<br />
Mileage<br />
Fuel Expense<br />
- <strong>August</strong><br />
Total<br />
Hours<br />
<strong>August</strong><br />
Maintenance<br />
Expense<br />
FY21<br />
Year-To-Date<br />
Maintenance<br />
Expense<br />
Emergency<br />
Responses<br />
<strong>August</strong><br />
C-181 2017 39,533 $240.97 N/A $15.00 $277.67 2<br />
FM-183 <strong>2021</strong> 28,400 $213.79 N/A - $247.69 -<br />
BC-181 2016 46,367 $437.11 N/A - $901.40 55<br />
Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />
Page 8
OPERATIONAL STATISTICS -July<br />
PRIOR CURRENT<br />
COMMUNITY RISK REDUCTION DIVISION<br />
FREQ TARGET<br />
MONTH MONTH<br />
Fire Casualties—Civilian 0 0 M 0<br />
Fires Confined to Room of Origin 1 1 M 65%<br />
CO Inspections 2 3 M 100%<br />
Fire Inspections/Re-Inspections 36 32 A 267<br />
Fire Protection Plans Reviewed 1 3 M 100%<br />
Pre-Plans for High Hazard Target Facilities 0 0 Q 100%<br />
High Hazard Fire Inspections Complete 0 0 A 62<br />
Company Tours of High Hazard Target Facilities 0 0 A 90%<br />
Fire Safety Classes/Public Education 1 1 A 40<br />
Public Safety Announcements 8 5 M 12<br />
Cert/Occupancy Generated: $225.00<br />
Plan Reviews Generated: $2,830.76<br />
Foster Home Inspections: $150.00<br />
Operational Permits: $400.00<br />
Total Money Generated: $3,605.76<br />
Year to Date, CRRD has generated $153,281.90 in inspections, plan reviews and<br />
tests.<br />
Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – July <strong>2021</strong><br />
Page 9
OPERATIONAL STATISTICS -<strong>August</strong><br />
PRIOR CURRENT<br />
COMMUNITY RISK REDUCTION DIVISION<br />
FREQ TARGET<br />
MONTH MONTH<br />
Fire Casualties—Civilian 0 0 M 0<br />
Fires Confined to Room of Origin 1 1 M 65%<br />
CO Inspections 3 1 M 100%<br />
Fire Inspections/Re-Inspections 32 21 A 267<br />
Fire Protection Plans Reviewed 3 2 M 100%<br />
Pre-Plans for High Hazard Target Facilities 0 0 Q 100%<br />
High Hazard Fire Inspections Complete 0 0 A 62<br />
Company Tours of High Hazard Target Facilities 0 0 A 90%<br />
Fire Safety Classes/Public Education 1 0 A 40<br />
Public Safety Announcements 5 5 M 12<br />
Cert/Occupancy Generated: $75.00<br />
Plan Reviews Generated: $1,943.26<br />
Foster Home Inspections: $50.00<br />
Operational Permits: $200.00<br />
Flow Test: $100.00<br />
Total Money Generated: $2,368.26<br />
Year to Date, CRRD has generated $156,196.16 in inspections, plan reviews and<br />
tests.<br />
Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />
Page 10
OPERATIONAL STATISTICS – TRAINING<br />
Fire Training For Operations Division - <strong>August</strong><br />
Station 1 Station 2<br />
239<br />
221<br />
162<br />
183<br />
113<br />
108<br />
A Shift B Shift C Shift<br />
Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />
Page 11
338<br />
HOURS ON<br />
CALLS<br />
118 Hours<br />
Apparatus<br />
Duties<br />
(Includes<br />
maintenance,<br />
cleaning, inventory,<br />
inspections, etc.)<br />
32 Hours<br />
Various<br />
Office Work<br />
(Includes <strong>Report</strong><br />
entry, data entry,<br />
career<br />
advancement<br />
study, meetings)<br />
53 Hours<br />
Physical<br />
Fitness<br />
1078 Total<br />
Training<br />
Hours<br />
20 HOURS<br />
INSPECTIONS<br />
14 Hours Public<br />
Education &<br />
Special Events<br />
Red Oak Fire Rescue <strong>Monthly</strong> <strong>Report</strong> – <strong>August</strong> <strong>2021</strong><br />
Page 12