- Page 3: LEAN
- Page 7: Contents ACCESS YOUR FREE DIGITAL A
- Page 11: processes for an organization and t
- Page 14 and 15: | 1 | Six Components of Lean Philos
- Page 17 and 18: Defective Production Defects equal
- Page 19 and 20: incur costs. Transportation is inev
- Page 21 and 22: materials can also be disrupted, ca
- Page 28 and 29: 3. Simplicity Simplicity is a golde
- Page 30: Restart the cycle with the newly st
- Page 33 and 34: 1. Initial Perceptions This is a de
- Page 35: fig. 7 : A sample A3 master sheet.
- Page 39 and 40: 5. Visibility Visibility within an
- Page 41: 6. Flexibility Flexibility is an es
- Page 44 and 45: prescribes five other pillars: the
- Page 46 and 47: | 2 | Lean Production In This Chapt
- Page 49 and 50: But if the pull production system i
- Page 51: —raw materials to the delivery of
- Page 54: distance moved, and time taken are
- Page 57: from specific components. The compo
- Page 61 and 62:
The above graphic is an example of
- Page 64:
What decision makers can learn from
- Page 68 and 69:
Kanban Kanban, translated from Japa
- Page 70:
5. Under no circumstances should de
- Page 74:
Takt Time Takt time is yet another
- Page 78 and 79:
The result, 400 minutes, is the net
- Page 81 and 82:
Just-in-Time Just-in-Time (JIT) is
- Page 83 and 84:
possible, and line changes are sche
- Page 85 and 86:
ut on-time delivery, service, and v
- Page 88:
Facility Layout & Uniform Plant Loa
- Page 92:
Process Layout Process facility lay
- Page 96:
Production Leveling
- Page 100 and 101:
Leveling by Product Mix Though in p
- Page 102 and 103:
Other Tools : Six Sigma Though not
- Page 104 and 105:
To evaluate the current state of sy
- Page 106 and 107:
Key Questions (Answers on pg. 137)
- Page 108 and 109:
| 3 | The Lean Toolkit The Lean Too
- Page 110:
Manpower Manpower encompasses every
- Page 113 and 114:
The 4 S’s of Service (not to be c
- Page 116 and 117:
Poka-Yoke While many of the Lean ma
- Page 118:
for business activities: High Criti
- Page 121 and 122:
additional set of criteria by which
- Page 123:
focusing steps is always to improve
- Page 126 and 127:
Key Questions (Answers on pg. 137)
- Page 128 and 129:
evaluation, or production method, a
- Page 131 and 132:
Sort The sort portion of the 5S met
- Page 133 and 134:
A clean work environment is also th
- Page 135 and 136:
entire industry of Lean consultants
- Page 138 and 139:
Implementation Concerns The Lean bu
- Page 140 and 141:
Key Questions (Answers on pg. 137)
- Page 142 and 143:
Appendix Value Stream Mapping Sampl
- Page 144:
the process where inputs (raw mater
- Page 148:
Step 3 : Add the Flow of Materials
- Page 152 and 153:
Step 5 : Add Relevant Process Data
- Page 155 and 156:
Due to some confusion over the sawt
- Page 157 and 158:
Glossary 5M—The 5 M’s of manufa
- Page 159 and 160:
Kanban—A flow-oriented method of
- Page 161 and 162:
generally assumed to be homogeneous
- Page 163 and 164:
Answers
- Page 165 and 166:
Chapter Two 1c, 2b, 3b, 4a, 5d, 6b,
- Page 167 and 168:
Chapter Four 1b, 2c, 3a, 4b, 5d
- Page 169:
About ClydeBank Media We are a mult
- Page 172 and 173:
Explore the World of BUSINESS TO EX
- Page 174 and 175:
ClydeBank Media is a Proud Sponsor
- Page 176 and 177:
Copyright © 2016 by ClydeBank Medi
- Page 179 and 180:
Copyright © 2016
- Page 181:
All Rights Reserved ISBN-13 : 978-1