Four<br />
coke <strong>oven</strong> batteries<br />
240 <strong>oven</strong>s<br />
7.6 m height<br />
3.2 million tpy<br />
incl. gas treatment<br />
+ option :<br />
Two<br />
coke <strong>oven</strong> batteries<br />
120 <strong>oven</strong>s<br />
7.6 m height<br />
1.6 million tpy<br />
incl. gas treatment<br />
HYUNDAI STEEL CORP:<br />
POSCO - GWANGYANG:<br />
Figure 8 New high capacity <strong>oven</strong>s in South Korea<br />
11<br />
Four<br />
coke <strong>oven</strong> batteries<br />
200 <strong>oven</strong>s<br />
7.6 m height<br />
2.8 million tpy<br />
incl. gas treatment<br />
With regard to the situation for new projects, delays, terminations and onhold<br />
settings were the result.<br />
Some examples:<br />
The contract for the second battery of Hüttenwerke Krupp Mannesmann<br />
(HKM), located in Duisburg, Germany was placed on hold. The<br />
engineering for 70 high-capacity slot-type <strong>oven</strong>s for a production of 1.1<br />
mill t/year has been finalised and the preparation site works have been<br />
stopped. So far there is no further progress visible.<br />
In the USA two contracts have been influenced. One was for US-Steel<br />
Clairton Works and has been terminated. Uhde Dortmund as technologysupplier<br />
for Uhde Corporation of America (UCA) has prepared a certain<br />
amount of the engineering work for the rebuild of Battery C, comprising 85<br />
slot-type <strong>oven</strong>s with a height of 6.1m and providing a production capacity<br />
of 0.9 mill t/year. After a long period this was the first contract for a<br />
conventional coke <strong>oven</strong> battery in the US due to the fact that the EPA has<br />
acknowledged the installation of PROVen ® the single <strong>oven</strong> pressure control<br />
system at this battery as an alternative to the environmentally friendly heatrecovery<br />
coking technology.<br />
The second project in the US to be mentioned is kept on hold. A leading<br />
steel company has placed an order to UCA for a heat-recovery coking plant,