11.04.2022 Views

PORTFOLIO

Portfolio of work by Dylan Corr up to 2022

Portfolio of work by Dylan Corr up to 2022

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UP

SMALLER Campus DETACHED Spine CANOPIES OVERLAPPING Canopy CANOPIES TRIANGLE CANOPIES

Canopy Studies The existing campus Canopy Studies spine canopy was Canopy demolished Studies as part of the construction of the

new B4ET Forum. To protect from the harsh Arizona sun as well as desert monsoons,

a new campus spine canopy needed to be built.

Fill in corners around the exterior of the

building

Looks nice in plan, but does it subtract from 3

volumes in 3D?

Not dissimilar to some of our earlier plinth

studies

Overlapping canopies keeps them physically

f B2 and B3, spine

This option seems overly complex separate and but not ties as them together visually.

effective

Also isn’t as massive of a scale as monolithic

canopy.

f spine

NEW B3 CANOPY

Plan

UNIFIED CANOPIES

Plan

UNIFIED SPINE CANOPY

Plan

Do we want canopies outside the conference

rooms? They make it easier to walk right

outside the conference room. It’s also not a

very direct path to the campus spine.

ies Building 4 Project B4ET 05.06.2019

ENTANA MEDICAL TISSUE SYSTEMS DIAGNOSTICS Campus Amenities VENTANA Building 4 MEDICAL Project B4ET TISSUE SYSTEMS 05.06.2019 DIAGNOSTICS Campus Amenities VENTANA Building 4 MEDICAL Project B4ET TISSUE SYSTEMS 05.06.2019 DIAGNOSTICS Campus Amenities VENTANA Building 4 MEDICAL Project B4ET SYSTEMS 05.06.2019 Campus Amenities Building 4 Project B4ET 05.06.2019

nd B3 are

CD1 CANOPY

Plan

EQUAL WIDTH CANOPIES

Plan

D SPINE

PERPENDICULAR CANOPIES

Plan

DIAGONAL CANOPIES

Plan

TISSUE DIAGNOSTICS VENTANA MEDICAL SYSTEMS TISSUE Campus DIAGNOSTICS Amenities Building 4 VENTANA Project B4ET MEDICAL 06.04.2019 SYSTEMS TISSUE Campus DIAGNOSTICS Amenities Building 4 VENTANA Project B4ET MEDICAL 06.04.2019 SYSTEMS Campus Amenities Building 4 Project B4ET 06.04.2019

1”=40’-0”

0´ 20´ 40´

1”=40’-0”

0´ 2

20’

WIDE

nities ENTANA Building 4 MEDICAL Project B4ET SYSTEMS 05.06.2019 Campus Amenities Building 4 Project B4ET 05.06.2019

20’

WIDE

30’

WIDE

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!