PORTFOLIO
Portfolio of work by Dylan Corr up to 2022
Portfolio of work by Dylan Corr up to 2022
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
V
V
V
V
V
O
O
V
V
O
V
O
V
O
7"
7"
O
O
O
S
V
S
S
V
S
O
S
S
S
S
O
O
O
O
S
V
S
S
V
S
O
O
6"
O
O
S S S S
V
S S S S
V
O
O
O
____________
6"
S S S S
V
V
O
O
O
O
O
S
S
S
O
V
V
S
S
S
O
O
S
V
S
V
S
O
O
O
6"
O
S
S
S
O
O
O
O
O
O
O
6"
O
O
O
O
V
____________
O
O
O
O
V
O
O
V
S
S
V
V
S
S
S
V
V
S
S
S
S
S
V
Floor Plan
Level 2
0’ 2’ 4’ 8’ 16’
ZIMMER GUNSUL FRASCA A
PORTLAND
SEATTLE
LOS ANGELES
WASHINGTON DC
EXISTING BUILDING B2
NEW YORK
VANCOUVER BC
19
7' - 10 7/8"
TO F.O. BLOCK
VIF
14'-0"
14'-0"
14'-0"
VIF
CJ
CJ
CJ
21
CJ
1
2 3 4 5
2
6
A6.10
A6.09
VIF 3 EQ (ECP-01) PANELS VIF
ALIGN
CJ
ALIGN
11' - 4 1/4"
EXAM 1
205
EXAM 2
206
PRACTITIONER
OFFICE
204
CONSULTATION
203
VIF
TO F.O. BLOCK
FLEX ROOM
202
CJ
CJ
BIO.ST
208
CIRCULATION
212
VIF
CONTINUOUS VENT
ALONG SOFFIT
PERIMETER AT WINDOW
11' - 4"
LAB
211
RECEPTION
210
WAITING
201
5
A6.08
TO F.O. BLOCK
CJ
2
A6.15
MED ROOM
207
RESTROOM
209
VIF VIF 14'-0" 14'-0" VIF
CJ
JAN. CL.
214
ALIGN
ELEC
215
MOTHER'S RM.
213
CJ
CJ
SH-01
CJ
SH-01
CJ
1'-11"
8' - 2 1/2"
ALIGN
VIF
CJ
TO F.O. BLOCK
EQ
5'-6"
EQ
EQ EQ
EQ
EQ
EQ EQ
CJ
CORRIDOR EQ 251
EQ EQ
EQ
EQ
EQ
EQ
EQ
EQ EQ
EQ EQ
7"
IT - IDF
217
BREAK ROOM
244
INS-05
MEDIUM
CONFERENCE
ROOM 1
243
INS-05
MEDIUM
CONFERENCE
ROOM 2
242
11' - 4 3/8"
INS-05
VIF
TO F.O. BLOCK
6
A4.03
WOMEN'S
LOCKER /
SHOWER /
RESTROOMS
10'-5"
ALIGN
GYPSUM
BOARD
9' - 7"AFF
EQ EQ
ELEV.NO. 1.
200A
ALIGN
4'-0"
16'-0"
EQ
4'-0"
6 1/8"
MEN'S LOCKER /
SHOWER /
RESTROOMS
EQ
EQ
EQ
EQ
EQ
15'-0"
15'-0"
15'-0"
6'-5"
TYP
EQ
SH-01
4
A9.21
EQ 6'-4" EQ
EQ EQ EQ EQ
VIF VIF VIF
CJ
CJ
CJ
CJ
EQ EQ
EQ1
10
DRP-01
DRP-01
3
A4.04
EQ1
6 5/8"
TYP
TYP
TYP
LARGE
CONFERENCE
ROOM 3
241
INS-05
CJ
EQ
EQ EQ
EQ EQ
7'-5"
EQ
EQ
EQ
DRP-01
EQ
EQ
EQ
EQ
EQ
EQ EQ
7'-5"
1'-6 1/4"
1
A4.32
SKYLIGHT
5'-0"
TYP
5'-0"
TYP
LARGE
CONFERENCE
ROOM 4
240
FITNESS
CORRIDOR 250
ACOUSTICAL INSULATION BOARD
SHOT INTO DECK BETWEEN
STEEL JOISTS (INS-05) WRAPPED
IN GYPSORB PERFORATED
GYPSUM BD (AWP-01)
DRP-01
ALIGN
SKYLIGHT
SKYLIGHT
ALIGN
CJ
2
A6.03
6 7
8
MECHANICAL
223
3'-3" 8'-0" 8'-0" 8'-0" 9'-3"
FEMALE TOILET
ROOM
221
MALE TOILET
ROOM
222
CEILING FAN,
TYP. EQ EQ EQ EQ
1
A9.23
EQ EQ EQ EQ EQ EQ
CJ
CJ
INS-05
EQ
8'-11"
EQ
7'-5"
7'-5"
7'-5"
EQ
5'-0"
TYP
EQ EQ EQ EQ
EQ EQ
EQ EQ
EQ EQ
10"
1'-4 1/2"
CJ
5'-0"
TYP
EQ
7'-5"
CJ
CJ
EQ
EQ EQ
VIF VIF VIF
3
A9.22
5
A9.22
ELEC
225
ELEV. NO.2.
200B
CATERING/PANTRY
228
SMALL
CONFERENCE
ROOM 1
226
INS-05
DRAPERY (DRP-01) DRP-01
ACT-02
10' - 0"AFF
SMALL
CONFERENCE
ROOM 2
227
INS-05
3
A9.22
VIF 14'-0" 14'-0" VIF VIF
11' - 4 3/8"
2
A6.13
TO F.O. BLOCK
10"
SIM
9'-3"
5'-11 1/2"
CJ
6'-0"
6'-0"
4'-11"
1'-0"
EQ EQ
4
A6.03
CJ
EQ
EQ
EQ
EQ
EQ 6'-0" EQ
FIXTURES CENTERED ON
CEILING PANELS TYP.
CJ
7
A9.21
10"
6"
EQ EQ
EQ
EQ EQ
2'-0"
3'-11 1/2"
EQEQ
CJ
EQ
5'-7"
EQ
EQ
ALIGN
ALIGN
11' - 1 1/2"
CONFERENCE
STORAGE
230
CORRIDOR 252
CJ
CJ
3
A9.22
CJ
CJ
TO F.O. BLOCK
CJ
EQ
EQ
8 5/8"
EQ
EQ
DRP-01
14'-0"
14'-0"
14'-0"
VIF
EQ
EQ
DRP-01
1'-0"
EQ
8'-0" 8'-0"
EQ
EQ
VIF
11' - 4"
EQ
TO F.O. BLOCK
CJ
ALIGN
6
A4.03
MEDIUM
CONFERENCE
ROOM 3
231
INS-05
MEDIUM
CONFERENCE
ROOM 4
232
CJ
INS-05
2
A6.14
ALIGN
CJ
9
ALIGN
VIF VIF VIF VIF
SH-01
8' - 2"
CJ
CJ
CJ
CJ
TO F.O. BLOCK
VIF
13'-2"
14'-11"
VIF
VIF
7' - 7 3/8"
RCP
Level 2
TO F.O. BLOCK
A
B
C
D
E
F
515 South Flower Str
Suite 3700
Los Angeles, CA 900
T 213 617 1901
www.zgf.com
Consultants
Civil Engineer:
Wood / Patel
2051 West Northern Av
Phoenix, AZ 85021
(602) 335-8500
Structural Engineer:
John A Martin & Associ
950 South Grand Avenu
4th Floor, Los Angeles,
(213) 483-6490
Mechanical, Electrical,
Plumbing Engineering,
Lighting Design, Audio
Visual Technology:
Affiliated Engineers Inc
4742 N. 24th Street, Su
Phoenix, AZ 85016
(602) 429-5800
Landscape Architect:
Trueform
2009 North 7th Street
Phoenix, AZ 85006
(480) 382-4244
Foodservice Consultan
NGAssociates
11135 San Pablo Aven
El Cerrito, CA 94530
(510) 255-9684
Notice of Extended Paymen
This contract allows the own
payment within 60 days afte
and approval of billings and
progress payments, within 6
certification and approval of
estimates for release of rete
within 60 days after certifica
approval of billings and estim
payment.
Revisions
1 PERMIT REV
10 ASI-017
19 ASI-027
21 ASI-030
Roche Tiss
Diagnostics
Ventana Me
Systems B4
1910 E Innovation Pa
Tucson, AZ 85755
1 RCP LEVEL 2
A9.02 1/8" = 1'-0"
VIF 14'-0" 13'-10" 13'-10" 14'-0" VIF
11' - 4 3/8"
11' - 3 3/4"
TO F.O. BLOCK
TO F.O. BLOCK
0’ 2’ 4’ 8’ 16’
1
Drawing Title
REFLECTED
CEILING PLA
LEVEL 2
GENERAL NOTES
REFLECTED CEILING PLAN LEGEND
KEY NOTES
1. ALL CEILING HEIGHTS ARE TO BE +9'-7" ABOVE FINISHED FLOOR
(A.F.F.), U.N.O.
2. ACOUSTIC CEILINGS ARE CENTERED IN ROOM (BOTH DIRECTIONS)
ABOUT MAIN WALLS AS INDICATED GRAPHICALLY, U.N.O. AVOID CUT
TILES LESS THAN 6". IN ADJACENT SPACES, ALIGN CEILINGS AS
GRAPHICALLY INDICATED.
3. MECHANICAL SYSTEM CHILLED BEAMS AND SUPPLY AND EXHAUST
REGISTERS ARE SHOWN FOR LOCATION ONLY IN CEILING. REFER TO
MECHANICAL AND ELECTRICAL DRAWINGS FOR OTHER REQUIRED
INDICATES START POINT
ACT-01, 2' x 2' ACOUSTIC CEILING
TILE
ACT-02, 2' x 2' WASHABLE ACOUSTICAL
CEILING TILE
WAP
EXIT SIGN, REFER TO ELEC DRAWINGS
FIRE SPRINKLER HEAD, LOCATED FOR
DESIGN INTENT (SEE GN 7)
WIRELESS ACCESS POINT DEVICE (OFOI)
RECESSED LED DOWN LIGHT FIXTURE
SUSPENDED 1' X 4' LED FIXTURE
SECURITY CAMERA
AV CAMERA
CHILLED BEAM
ACCESS PANELS
1 MOISTURE RESISTANT GYPSUM BOARD
2
3
KEY PLAN
19
Date:
07.20.2