11.04.2022 Views

PORTFOLIO

Portfolio of work by Dylan Corr up to 2022

Portfolio of work by Dylan Corr up to 2022

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

V

V

V

V

V

O

O

V

V

O

V

O

V

O

7"

7"

O

O

O

S

V

S

S

V

S

O

S

S

S

S

O

O

O

O

S

V

S

S

V

S

O

O

6"

O

O

S S S S

V

S S S S

V

O

O

O

____________

6"

S S S S

V

V

O

O

O

O

O

S

S

S

O

V

V

S

S

S

O

O

S

V

S

V

S

O

O

O

6"

O

S

S

S

O

O

O

O

O

O

O

6"

O

O

O

O

V

____________

O

O

O

O

V

O

O

V

S

S

V

V

S

S

S

V

V

S

S

S

S

S

V

Floor Plan

Level 2

0’ 2’ 4’ 8’ 16’

ZIMMER GUNSUL FRASCA A

PORTLAND

SEATTLE

LOS ANGELES

WASHINGTON DC

EXISTING BUILDING B2

NEW YORK

VANCOUVER BC

19

7' - 10 7/8"

TO F.O. BLOCK

VIF

14'-0"

14'-0"

14'-0"

VIF

CJ

CJ

CJ

21

CJ

1

2 3 4 5

2

6

A6.10

A6.09

VIF 3 EQ (ECP-01) PANELS VIF

ALIGN

CJ

ALIGN

11' - 4 1/4"

EXAM 1

205

EXAM 2

206

PRACTITIONER

OFFICE

204

CONSULTATION

203

VIF

TO F.O. BLOCK

FLEX ROOM

202

CJ

CJ

BIO.ST

208

CIRCULATION

212

VIF

CONTINUOUS VENT

ALONG SOFFIT

PERIMETER AT WINDOW

11' - 4"

LAB

211

RECEPTION

210

WAITING

201

5

A6.08

TO F.O. BLOCK

CJ

2

A6.15

MED ROOM

207

RESTROOM

209

VIF VIF 14'-0" 14'-0" VIF

CJ

JAN. CL.

214

ALIGN

ELEC

215

MOTHER'S RM.

213

CJ

CJ

SH-01

CJ

SH-01

CJ

1'-11"

8' - 2 1/2"

ALIGN

VIF

CJ

TO F.O. BLOCK

EQ

5'-6"

EQ

EQ EQ

EQ

EQ

EQ EQ

CJ

CORRIDOR EQ 251

EQ EQ

EQ

EQ

EQ

EQ

EQ

EQ EQ

EQ EQ

7"

IT - IDF

217

BREAK ROOM

244

INS-05

MEDIUM

CONFERENCE

ROOM 1

243

INS-05

MEDIUM

CONFERENCE

ROOM 2

242

11' - 4 3/8"

INS-05

VIF

TO F.O. BLOCK

6

A4.03

WOMEN'S

LOCKER /

SHOWER /

RESTROOMS

10'-5"

ALIGN

GYPSUM

BOARD

9' - 7"AFF

EQ EQ

ELEV.NO. 1.

200A

ALIGN

4'-0"

16'-0"

EQ

4'-0"

6 1/8"

MEN'S LOCKER /

SHOWER /

RESTROOMS

EQ

EQ

EQ

EQ

EQ

15'-0"

15'-0"

15'-0"

6'-5"

TYP

EQ

SH-01

4

A9.21

EQ 6'-4" EQ

EQ EQ EQ EQ

VIF VIF VIF

CJ

CJ

CJ

CJ

EQ EQ

EQ1

10

DRP-01

DRP-01

3

A4.04

EQ1

6 5/8"

TYP

TYP

TYP

LARGE

CONFERENCE

ROOM 3

241

INS-05

CJ

EQ

EQ EQ

EQ EQ

7'-5"

EQ

EQ

EQ

DRP-01

EQ

EQ

EQ

EQ

EQ

EQ EQ

7'-5"

1'-6 1/4"

1

A4.32

SKYLIGHT

5'-0"

TYP

5'-0"

TYP

LARGE

CONFERENCE

ROOM 4

240

FITNESS

CORRIDOR 250

ACOUSTICAL INSULATION BOARD

SHOT INTO DECK BETWEEN

STEEL JOISTS (INS-05) WRAPPED

IN GYPSORB PERFORATED

GYPSUM BD (AWP-01)

DRP-01

ALIGN

SKYLIGHT

SKYLIGHT

ALIGN

CJ

2

A6.03

6 7

8

MECHANICAL

223

3'-3" 8'-0" 8'-0" 8'-0" 9'-3"

FEMALE TOILET

ROOM

221

MALE TOILET

ROOM

222

CEILING FAN,

TYP. EQ EQ EQ EQ

1

A9.23

EQ EQ EQ EQ EQ EQ

CJ

CJ

INS-05

EQ

8'-11"

EQ

7'-5"

7'-5"

7'-5"

EQ

5'-0"

TYP

EQ EQ EQ EQ

EQ EQ

EQ EQ

EQ EQ

10"

1'-4 1/2"

CJ

5'-0"

TYP

EQ

7'-5"

CJ

CJ

EQ

EQ EQ

VIF VIF VIF

3

A9.22

5

A9.22

ELEC

225

ELEV. NO.2.

200B

CATERING/PANTRY

228

SMALL

CONFERENCE

ROOM 1

226

INS-05

DRAPERY (DRP-01) DRP-01

ACT-02

10' - 0"AFF

SMALL

CONFERENCE

ROOM 2

227

INS-05

3

A9.22

VIF 14'-0" 14'-0" VIF VIF

11' - 4 3/8"

2

A6.13

TO F.O. BLOCK

10"

SIM

9'-3"

5'-11 1/2"

CJ

6'-0"

6'-0"

4'-11"

1'-0"

EQ EQ

4

A6.03

CJ

EQ

EQ

EQ

EQ

EQ 6'-0" EQ

FIXTURES CENTERED ON

CEILING PANELS TYP.

CJ

7

A9.21

10"

6"

EQ EQ

EQ

EQ EQ

2'-0"

3'-11 1/2"

EQEQ

CJ

EQ

5'-7"

EQ

EQ

ALIGN

ALIGN

11' - 1 1/2"

CONFERENCE

STORAGE

230

CORRIDOR 252

CJ

CJ

3

A9.22

CJ

CJ

TO F.O. BLOCK

CJ

EQ

EQ

8 5/8"

EQ

EQ

DRP-01

14'-0"

14'-0"

14'-0"

VIF

EQ

EQ

DRP-01

1'-0"

EQ

8'-0" 8'-0"

EQ

EQ

VIF

11' - 4"

EQ

TO F.O. BLOCK

CJ

ALIGN

6

A4.03

MEDIUM

CONFERENCE

ROOM 3

231

INS-05

MEDIUM

CONFERENCE

ROOM 4

232

CJ

INS-05

2

A6.14

ALIGN

CJ

9

ALIGN

VIF VIF VIF VIF

SH-01

8' - 2"

CJ

CJ

CJ

CJ

TO F.O. BLOCK

VIF

13'-2"

14'-11"

VIF

VIF

7' - 7 3/8"

RCP

Level 2

TO F.O. BLOCK

A

B

C

D

E

F

515 South Flower Str

Suite 3700

Los Angeles, CA 900

T 213 617 1901

www.zgf.com

Consultants

Civil Engineer:

Wood / Patel

2051 West Northern Av

Phoenix, AZ 85021

(602) 335-8500

Structural Engineer:

John A Martin & Associ

950 South Grand Avenu

4th Floor, Los Angeles,

(213) 483-6490

Mechanical, Electrical,

Plumbing Engineering,

Lighting Design, Audio

Visual Technology:

Affiliated Engineers Inc

4742 N. 24th Street, Su

Phoenix, AZ 85016

(602) 429-5800

Landscape Architect:

Trueform

2009 North 7th Street

Phoenix, AZ 85006

(480) 382-4244

Foodservice Consultan

NGAssociates

11135 San Pablo Aven

El Cerrito, CA 94530

(510) 255-9684

Notice of Extended Paymen

This contract allows the own

payment within 60 days afte

and approval of billings and

progress payments, within 6

certification and approval of

estimates for release of rete

within 60 days after certifica

approval of billings and estim

payment.

Revisions

1 PERMIT REV

10 ASI-017

19 ASI-027

21 ASI-030

Roche Tiss

Diagnostics

Ventana Me

Systems B4

1910 E Innovation Pa

Tucson, AZ 85755

1 RCP LEVEL 2

A9.02 1/8" = 1'-0"

VIF 14'-0" 13'-10" 13'-10" 14'-0" VIF

11' - 4 3/8"

11' - 3 3/4"

TO F.O. BLOCK

TO F.O. BLOCK

0’ 2’ 4’ 8’ 16’

1

Drawing Title

REFLECTED

CEILING PLA

LEVEL 2

GENERAL NOTES

REFLECTED CEILING PLAN LEGEND

KEY NOTES

1. ALL CEILING HEIGHTS ARE TO BE +9'-7" ABOVE FINISHED FLOOR

(A.F.F.), U.N.O.

2. ACOUSTIC CEILINGS ARE CENTERED IN ROOM (BOTH DIRECTIONS)

ABOUT MAIN WALLS AS INDICATED GRAPHICALLY, U.N.O. AVOID CUT

TILES LESS THAN 6". IN ADJACENT SPACES, ALIGN CEILINGS AS

GRAPHICALLY INDICATED.

3. MECHANICAL SYSTEM CHILLED BEAMS AND SUPPLY AND EXHAUST

REGISTERS ARE SHOWN FOR LOCATION ONLY IN CEILING. REFER TO

MECHANICAL AND ELECTRICAL DRAWINGS FOR OTHER REQUIRED

INDICATES START POINT

ACT-01, 2' x 2' ACOUSTIC CEILING

TILE

ACT-02, 2' x 2' WASHABLE ACOUSTICAL

CEILING TILE

WAP

EXIT SIGN, REFER TO ELEC DRAWINGS

FIRE SPRINKLER HEAD, LOCATED FOR

DESIGN INTENT (SEE GN 7)

WIRELESS ACCESS POINT DEVICE (OFOI)

RECESSED LED DOWN LIGHT FIXTURE

SUSPENDED 1' X 4' LED FIXTURE

SECURITY CAMERA

AV CAMERA

CHILLED BEAM

ACCESS PANELS

1 MOISTURE RESISTANT GYPSUM BOARD

2

3

KEY PLAN

19

Date:

07.20.2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!