You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
@
NG
PLE
ELEVATION
PLAN
1 1/4"
TYP
2" O.C.
TYP
PLAN AND ELEVATION DETAIL OF WOOD SLATS
2'-10"
2 SECTION AT CAFE COUNTER
A8.22 1 1/2" = 1'-0"
3 SECTION AT LOW CAFE COUNTER
A8.22 1 1/2" = 1'-0"
3'-2"
REFER TO INTERIOR ELEVATIONS
6" 2 1/2"
4"
SOFFIT 18X26 STEEL L BRACKET
WOOD BASE RAIL BELOW T-05 TILE
3"
3"
4"
9' - 7"
CEMENT BOARD
BACKING FOR T-05 TILE
1 X 3 SOLID
MAPLE WOOD
CONTINUOUS 5" X 5", 16 GA
BENT PLATE FOR BASE RAIL
SUPPORT
4"
BLACK MESH SCREEN
SLAT BACKING
COLUMN BEYOND
3'-0"
diffusers, sensors, and other ceiling devices. The ZIMMER GUNSUL FRASCA point
ARCHITECTS LLP
CHECK OUT COMPUTER, SEE
FOOD DRAWINGS
PORTLAND
of sale casework at the servery entrance is rounded
SF-01 SOLID SURFACE COUNTERTOP
WOOD BLOCKING
T-05 TILE
LEVEL 1 (2819' - 4")
0"
SF-01 SOLID SURFACE COUNTERTOP
WOOD BLOCKING
18X26 STEEL L BRACKET
CEMENT BOARD
BACKING FOR T-05 TILE
LEVEL 1 (2819' - 4")
0"
1 X 3 SOLID MAPLE
Servery
2 3/4"
WOOD @ WOOD
BASE RAIL
Troughs in the gyp ceiling hold lights, sprinklers,
SEATTLE
SOFFIT
LOS ANGELES
SF-01 SOLID SURFACE COUNTERTOP
WASHINGTON DC
6"
WOOD BLOCKING
NEW
9'
YORK
- 7"
VANCOUVER BC
to avoid any accidental bumps during busy lunch
hours, as well as provide some visual softness. After
515 South Flower Street
Suite 3700
Los Angeles, CA 90071
T 213 617 1901
CEMENT BOARD
www.zgf.com
extensive tiling options were explored (opposite
Consultants
page)
BACKING FOR T-05 TILE
5 SECTION DETAIL OF WOOD SLATS AT AV ROOM
Civil Engineer:
A9.23 3" = 1'-0"
Wood / Patel
white and red handmade 20" COLUMN Talavera tile was chosen for
T-05 TILE
the casework and back walls respectively.
1/4-20 THREADED ROD WITH
NUT TO STRUCTURE BY
OTHERS
FIXTURE SUSPENSION AND
JOINING BRACKET
LIGHT FIXTURE BY OTHERS,
SEE ELECTRICAL
3 3/4"
4 7/8"
NOTE: SIMILAR DETAIL FOR MECHANICAL DIFFUSER AND SPRINKLER HEAD, REFER TO SPEC.
T-05 TILE
PLACE OCCUPANCY SENSORS IN LIGHTING TROUGH, TYP.
6 SECTION DETAIL AT SERVERY LIGHT TROUGH
A9.23
2'-10"
2"
2'-10"
3" = 1'-0"
4"
3" 3"
1 SECTION AT CHECK OUT COUNTER
A8.22 1 1/2" = 1'-0"
4 SECTION AT SERVERY COUNTER
A8.22 1 1/2" = 1'-0"
4"
7 1/4"
1"
4"
LEVEL 1 (2819' - 4")
0"
6 1/2"
SF-01 SOLID SURFACE COUNTERTOP
WOOD BLOCKING
STEEL L BRACKET AS REQUIRED WHERE
EQUIPMENT DOES NOT PROVIDE
COUNTERTOP SUPPORT
CEMENT BOARD
BACKING FOR T-05 TILE
LEVEL 1 (2819' - 4")
0"
2051 West Northern Ave, Suite 100
Phoenix, AZ 85021
(602) 335-8500
Structural Engineer:
John A Martin & Associates
950 South Grand Avenue
4th Floor, Los Angeles, CA 90015
(213) 483-6490
Mechanical, Electrical,
Plumbing Engineering,
Lighting Design, Audio /
Visual Technology:
4
A9.21
Affiliated Engineers Inc.
4742 N. 24th Street, Suite 100
Phoenix, AZ 85016
(602) 429-5800
Landscape Architect:
Trueform
2009 North 7th Street
Phoenix, AZ 85006
(480) 382-4244
Foodservice Consultant:
NGAssociates
11135 San Pablo Avenue, Suite 1782
El Cerrito, CA 94530
(510) 255-9684
GYP BOARD CEILING,
PT-01
Notice of Extended Payment Provision
This contract allows the owner to make
payment within 60 days after certification
and approval of billings and estimates for
progress payments, within 60 days after
certification and approval of billings and
estimates for release of retention and
within 60 days after certification and
approval of billings and estimates for final
payment.
Revisions
AL
AN
BA
1 X
MA
CO
BE
SU
1 X
W
BA
3 S
A9.23 3
T-05 TILE
WOOD BLOCKING
R 1' - 6"
CEMENT BOARD BACKING
FOR T-04 TILE
6 Detail 8
A8.22 1 1/2" = 1'-0"
0"
R 1' - 1 1/2"
C L
PLYWOOD BACKING
C
Roche Tissue
Diagnostics
Ventana Medical
Systems B4ET
5 PLAN DETAIL AT ROUNDED SERVERY COUNTER
A8.22 1 1/2" = 1'-0"
1910 E Innovation Park Dr,
Tucson, AZ 85755
3'-0"
COLUMN BEYOND
Drawing Title
INTERIOR DETAILS
- CASEWORK
CHECK OUT COMPUTER, SEE
FOOD DRAWINGS
ZIMMER GUNSUL FRASCA ARCHITECTS LLP
PORTLAND
3'-2"
SF-01 SOLID SURFACE COUNTERTOP
WOOD BLOCKING
SF-01 SOLID SURFACE COUNTERTOP
WOOD BLOCKING
SEATTLE
LOS ANGELES
WASHINGTON DC
NEW YORK
VANCOUVER BC
2'-10"
2 SECTION AT CAFE COUNTER
A8.22 1 1/2" = 1'-0"
3"
4"
18X26 STEEL L BRACKET
CEMENT BOARD
BACKING FOR T-05 TILE
T-05 TILE
LEVEL 1 (2819' - 4")
0"
2'-10"
4"
20" COLUMN
3" 3"
1 SECTION AT CHECK OUT COUNTER
A8.22 1 1/2" = 1'-0"
4"
CEMENT BOARD
BACKING FOR T-05 TILE
T-05 TILE
LEVEL 1 (2819' - 4")
0"
515 South Flower Street
Suite 3700
Los Angeles, CA 90071
T 213 617 1901
www.zgf.com
Consultants
Civil Engineer:
Wood / Patel Date:
07.20.2020
2051 West Northern Ave, Suite 100
Phoenix, AZ 85021 Job No: 24622.04
(602) 335-8500
Drawn By: JP, DC
Structural Engineer:
Checked By: MP
John A Martin & Associates
950 South Grand Avenue
4th Floor, Los Angeles, CA 90015
Drawing No.
(213) 483-6490
Mechanical, Electrical,
Plumbing Engineering,
Lighting Design, Audio /
Visual Technology:
Affiliated Engineers Inc.
4742 N. 24th Street, Suite 100
Phoenix, AZ 85016
(602) 429-5800
Landscape Architect:
Trueform
2009 North 7th Street
Phoenix, AZ 85006
(480) 382-4244
A8.22
FOR CONSTRUCTION
SF-01 SOLID SURFACE COUNTERTOP
WOOD BLOCKING
18X26 STEEL L BRACKET
CEMENT BOARD
BACKING FOR T-05 TILE
2'-10"
2"
7 1/4"
1"
SF-01 SOLID SURFACE COUNTERTOP
WOOD BLOCKING
STEEL L BRACKET AS REQUIRED WHERE
EQUIPMENT DOES NOT PROVIDE
COUNTERTOP SUPPORT
CEMENT BOARD
BACKING FOR T-05 TILE
Foodservice Consultant:
NGAssociates
11135 San Pablo Avenue, Suite 1782
El Cerrito, CA 94530
(510) 255-9684
Notice of Extended Payment Provision
This contract allows the owner to make
payment within 60 days after certification
and approval of billings and estimates for
progress payments, within 60 days after
23