25.12.2012 Views

The International DORIS Service July 2003 – December 2005 report

The International DORIS Service July 2003 – December 2005 report

The International DORIS Service July 2003 – December 2005 report

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.4 IDS EXPERIMENTS<br />

IDS Report <strong>–</strong> <strong>July</strong> <strong>2003</strong> to <strong>December</strong> <strong>2005</strong> 19<br />

Figure 7. beacons models in the permanent network<br />

<strong>The</strong> following experiments have been continued or initiated in 2004 (see figure 4):<br />

• <strong>The</strong> second Sorsdal experiment (Glacier movement monitoring in Antarctica) was carried<br />

out by Auslig, from November <strong>2003</strong> to January 2004.<br />

• A new station was installed at Belgrano II, an Argentine base in Antarctica, following a<br />

joint proposal to the IDS by the Alfred Wegener Institute and the Insituto Antárctico<br />

Argentino.<br />

• <strong>The</strong> stations at Wettzell (Germany) and Gavdos (Greece) have been down most of the<br />

time due to a beacon failure.<br />

5.5 CO-LOCATIONS WITH OTHER IERS TECHNIQUES<br />

<strong>The</strong> number of co-locations with currently operating stations of the other techniques contributing<br />

to IERS is as follows.<br />

• GPS: 37 sites<br />

• SLR: 9 sites<br />

• VLBI: 7 sites<br />

<strong>The</strong> following new co-locations were made available in 2004 and <strong>2005</strong>:<br />

• <strong>DORIS</strong>-SLR tie at Jiufeng measured in <strong>December</strong> <strong>2003</strong><br />

• <strong>DORIS</strong>-GPS tie at Yuzhno-Sakhalinsk measured in August 2004<br />

• <strong>DORIS</strong>-VLBI tie at St-John’s measured in <strong>2003</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!