5.4 IDS EXPERIMENTS<br />
IDS Report <strong>–</strong> <strong>July</strong> <strong>2003</strong> to <strong>December</strong> <strong>2005</strong> 19<br />
Figure 7. beacons models in the permanent network<br />
<strong>The</strong> following experiments have been continued or initiated in 2004 (see figure 4):<br />
• <strong>The</strong> second Sorsdal experiment (Glacier movement monitoring in Antarctica) was carried<br />
out by Auslig, from November <strong>2003</strong> to January 2004.<br />
• A new station was installed at Belgrano II, an Argentine base in Antarctica, following a<br />
joint proposal to the IDS by the Alfred Wegener Institute and the Insituto Antárctico<br />
Argentino.<br />
• <strong>The</strong> stations at Wettzell (Germany) and Gavdos (Greece) have been down most of the<br />
time due to a beacon failure.<br />
5.5 CO-LOCATIONS WITH OTHER IERS TECHNIQUES<br />
<strong>The</strong> number of co-locations with currently operating stations of the other techniques contributing<br />
to IERS is as follows.<br />
• GPS: 37 sites<br />
• SLR: 9 sites<br />
• VLBI: 7 sites<br />
<strong>The</strong> following new co-locations were made available in 2004 and <strong>2005</strong>:<br />
• <strong>DORIS</strong>-SLR tie at Jiufeng measured in <strong>December</strong> <strong>2003</strong><br />
• <strong>DORIS</strong>-GPS tie at Yuzhno-Sakhalinsk measured in August 2004<br />
• <strong>DORIS</strong>-VLBI tie at St-John’s measured in <strong>2003</strong>