06.09.2022 Views

September 2022

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

etween the two solar panels from the top and<br />

fold the tab at the bottom behind the sill flashing.<br />

Step 6: Nail the top fixing strip into a batten.<br />

Align the bottom corner of the lower gutter covers<br />

with the bottom edge of the solar panel and push<br />

the gutter covers into the gasket. Fold down the<br />

remaining tabs.<br />

Step 7: Open the orange box and fix three combibatten<br />

brackets to the right-hand side of the top<br />

panel. Open the blue box and fit the upper gutter<br />

between the solar panels. Push the joining strip<br />

into the gasket in the top edge of the panel below.<br />

Installing panel 4:<br />

Step 8: Slide the new panel into position and fix<br />

with rafter brackets at the bottom and batten<br />

brackets to the right-hand side. Push the lower<br />

side flashing into the gasket on the right-hand<br />

side of the panel. Fit the side fixing tabs and fold<br />

over the tab on the sill flashing.<br />

Fit the upper gutter between the<br />

solar panels and the nail<br />

gutter fixing strip to a<br />

batten. Push the upper<br />

gutter cover into the<br />

panel gasket. Fold the<br />

end of the joining strip<br />

into the gutter.<br />

Installing top<br />

flashing:<br />

Step 9: For each rafter it<br />

crosses, fix a rafter bracket to the top of<br />

the top left panel and secure with two 50mm<br />

screws each. Push the top flashing into the panel<br />

gasket and feed the two straps under the foam<br />

and secure the straps to a batten above.<br />

Final touches:<br />

Step 10: Remove the paper strip on the underside<br />

of the sill flashing and press down onto the tiles.<br />

Ensure that the bitumen strip is well bonded to<br />

the tiles. Two courses of tiles<br />

should be fitted around the<br />

perimeter of the solar<br />

panels. The final<br />

electrical connection<br />

and sign off must be<br />

completed by an MCS<br />

certified installer.<br />

Marley SolarTile can be<br />

installed in either columns<br />

or rows and the number of<br />

panels will depend on the roof size<br />

and energy requirements. Visit<br />

www.marley.co.uk/solarinstall to view our<br />

online configurator or to download a more<br />

detailed installation guide.<br />

Further advice and info on Marley SolarTile:<br />

www.marley.co.uk/solar<br />

01283 722222<br />

@MarleyLtd<br />

For further r<br />

inform<br />

ation<br />

or a hire quotation call<br />

01858 412 100<br />

Email: sales@cookerhire.com<br />

www.cookerhire.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!