Bannockburn Town Centre Investment Strategy - Golden Plains Shire
Bannockburn Town Centre Investment Strategy - Golden Plains Shire
Bannockburn Town Centre Investment Strategy - Golden Plains Shire
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Bannockburn</strong> <strong>Town</strong><br />
<strong>Centre</strong> <strong>Investment</strong> <strong>Strategy</strong> <strong>Golden</strong> <strong>Plains</strong> <strong>Shire</strong> Council<br />
� Opportunities � Threats<br />
� Social � Social<br />
• Continued growth forecasts basis for increased service provision<br />
• Providing greater diversity of housing and services<br />
• Promote healthy communities/lifestyles<br />
• Improve accessibility<br />
� Economic � Economic<br />
• Sufficient and suitable land to increase commercial activity<br />
• Increase activity to street frontages<br />
• Consolidate town centre<br />
• Promote sustainable growth<br />
• Proposal for a large scale retail development has been submitted to Council<br />
• Tourism opportunities<br />
FILE P:\PES\31081.001 BANNOCKBURN TCIS\FINAL STRATEGY\FINAL AMENDED DRAFT REV5.DOC ⏐ MARCH 13 2008 ⏐ PAGE 13<br />
• Matching provision and timing of services to growth<br />
• Ability to provide services to an aging population<br />
• Losing the rural character of the township<br />
• Increasing isolation through poor access to services<br />
• Matching provision and timing of services to growth<br />
• Ad hoc development<br />
� Environmental � Environmental<br />
• Adequate open space needs to be provided to cater for the growing population of <strong>Bannockburn</strong><br />
• Existing open spaces are suitable for linkages<br />
• Links should be separate from vehicular traffic<br />
• Recognise and integrate local heritage<br />
• For drainage upgrade for east side of <strong>Bannockburn</strong>, stormwater storage and re-use are opportunities may be implemented<br />
during strategy stage<br />
• Quality urban design<br />
� Physical � Physical<br />
• Benefits of Geelong Bypass to reduce travel times to Melbourne and Geelong<br />
• Potential to provide additional commercial area without necessarily providing full complement of parking<br />
• Most likely be a sewer pumping station located at corner of Burnside Road<br />
• Critical need to plan for the growth of the <strong>Bannockburn</strong> <strong>Town</strong> <strong>Centre</strong><br />
• Provide heavy vehicle by-pass of <strong>Town</strong> <strong>Centre</strong><br />
• Managing the future of the school<br />
• Encroaching salinity issues for <strong>Bannockburn</strong> township<br />
• Impacts of growth on natural environment<br />
• Funding improvements and the provision of services<br />
• Effect of increased traffic volumes on pedestrian movement and safety<br />
• Many of the off street parking areas are not directly connected. Should parking get to be at a premium then this would make<br />
search patterns for parking spaces potentially quite difficult